Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151A976 + (ML20151A976)
- ML20151A979 + (ML20151A979)
- ML20151A980 + (ML20151A980)
- ML20151A982 + (ML20151A982)
- ML20151A983 + (ML20151A983)
- ML20151A985 + (ML20151A985)
- PNO-V-88-024, util Received Final Authorization from NRR to Restart Facility on 880330.Enhanced Operational Readiness Insp Team & Resident Insp Staff Observing Reactor Startup Which Will Require 6-10 H to Complete + (ML20151A987)
- ML20151A988 + (ML20151A988)
- ML20151A992 + (ML20151A992)
- ML20151A996 + (ML20151A996)
- ML20151A998 + (ML20151A998)
- ML20151B001 + (ML20151B001)
- ML20151B003 + (ML20151B003)
- ML20151B004 + (ML20151B004)
- ML20151B008 + (ML20151B008)
- ML20151B010 + (ML20151B010)
- IR 05000456/1988012 + (ML20151B011)
- ML20151B013 + (ML20151B013)
- ML20151B016 + (ML20151B016)
- ML20151B017 + (ML20151B017)
- ML20151B018 + (ML20151B018)
- ML20151B019 + (ML20151B019)
- ML20151B023 + (ML20151B023)
- PNO-III-88-029, on 880402,shutdown Begun to Repair Steam Generator Tube Leak.Leakage Rate from RCS Into Secondary Sys Calculated to Be 330 Gallons Per Day.Other Maint & Testing Work Planned in Addition to Investigation & Repair + (ML20151B026)
- ML20151B030 + (ML20151B030)
- ML20151B033 + (ML20151B033)
- ML20151B038 + (ML20151B038)
- ML20151B039 + (ML20151B039)
- ML20151B040 + (ML20151B040)
- ML20151B043 + (ML20151B043)
- ML20151B045 + (ML20151B045)
- IR 05000289/1988012 + (ML20151B047)
- ML20151B049 + (ML20151B049)
- ML20151B050 + (ML20151B050)
- 05000339/LER-1987-012, :on 870831,three Valves Failed Type C Local Leak Rate Testing.Caused by Incorrect Testing Methods & Seating Surface degradation.Air-operated Valve Retested Correctly & Check Valve Cleaned & Relapped + (ML20151B055)
- IR 05000245/1988007 + (ML20151B056)
- IR 05000373/1988004 + (ML20151B057)
- ML20151B060 + (ML20151B060)
- ML20151B064 + (ML20151B064)
- ML20151B072 + (ML20151B072)
- 05000374/LER-1988-002-07, :on 880303,Group 10 Isolation Occurred While Performing Instrument Surveillance Test.Caused by Failed Contact on Test Switch.Test Switch Replaced,Tested & Returned to Operation + (ML20151B074)
- ML20151B075 + (ML20151B075)
- ML20151B080 + (ML20151B080)
- ML20151B081 + (ML20151B081)
- 05000366/LER-1988-005-01, :on 880305,instruments Remained Inoperable for Longer than Permitted by Tech Specs.Caused by Personnel Error in Failing to Comply W/Procedure.Procedure Revised & Plant Personnel Counselled + (ML20151B082)
- ML20151B083 + (ML20151B083)
- 05000424/LER-1987-069, :on 871120,plant Operated Above Max Power Level Specified in Ol.Caused by Nuclear Instrumentation Being Allowed to Indicate Below Calorimetric Value.Procedures Revised & Computer Point U1118 Validated + (ML20151B085)
- ML20151B086 + (ML20151B086)
- ML20151B087 + (ML20151B087)
- 05000277/LER-1988-004-01, :on 880302,relay Tripped Causing Breaker Trip, Resulting in Containment Isolations & Inoperability of Fire Pumps.Caused by Unexpected Trip of Undervoltage Relay.Relay Coil Shipped to Mfg for Failure Analysis + (ML20151B088)
- ML20151B089 + (ML20151B089)