Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125A744 + (ML20125A744)
- ML20125A748 + (ML20125A748)
- PNO-IV-92-041, on 921201,11 Spent Fuel Mo-99/Tc-99m Generators Inadvertently Compacted & Sent to Local Landfill. Licensee Has Attempted to Recover Generators & Determined Them to Be Irretrievable + (ML20125A750)
- ML20125A753 + (ML20125A753)
- ML20125A755 + (ML20125A755)
- ML20125A756 + (ML20125A756)
- ML20125A758 + (ML20125A758)
- ML20125A760 + (ML20125A760)
- ML20125A762 + (ML20125A762)
- ML20125A766 + (ML20125A766)
- HBL-85-024, Forwards Fee for 850425 Application to Dispose of Low Level Radwaste + (ML20125A767)
- IR 05000348/1979019 + (ML20125A770)
- ML20125A774 + (ML20125A774)
- ML20125A775 + (ML20125A775)
- ML20125A777 + (ML20125A777)
- ST-HL-AE-4266, Forwards Rev 5 to Chapter 6, Operations QA Plan Design & Mod Control + (ML20125A778)
- ML20125A779 + (ML20125A779)
- ML20125A781 + (ML20125A781)
- ML20125A783 + (ML20125A783)
- ML20125A784 + (ML20125A784)
- ML20125A785 + (ML20125A785)
- ML20125A787 + (ML20125A787)
- PNO-V-92-037, on 921201,meeting Conducted at Plant to Address 921109 Steam Generator Tube Leak & Licensee Request for Emergency TS Change to Permit Restart + (ML20125A788)
- ML20125A791 + (ML20125A791)
- ML20125A793 + (ML20125A793)
- ML20125A795 + (ML20125A795)
- ML20125A796 + (ML20125A796)
- ML20125A798 + (ML20125A798)
- ML20125A799 + (ML20125A799)
- ML20125A801 + (ML20125A801)
- ML20125A802 + (ML20125A802)
- ML20125A803 + (ML20125A803)
- ML20125A805 + (ML20125A805)
- ML20125A806 + (ML20125A806)
- ML20125A810 + (ML20125A810)
- ML20125A811 + (ML20125A811)
- RBG-21-130, Revised Final Deficiency Rept DR-282 Re Lack of Antisiphon Device in Spent Fuel Cooling Lines in Containment & Fuel Bldgs.Initially Reported on 850304.Antisiphon Holes Drilled in Spent Fuel Cooling Sys Supply & Return Pipes + (ML20125A812)
- ML20125A813 + (ML20125A813)
- ML20125A815 + (ML20125A815)
- ML20125A817 + (ML20125A817)
- ML20125A818 + (ML20125A818)
- ML20125A819 + (ML20125A819)
- ML20125A820 + (ML20125A820)
- 05000321/LER-1979-051, Forwards LER 79-051/03L-0 + (ML20125A827)
- ML20125A828 + (ML20125A828)
- ML20125A829 + (ML20125A829)
- ML20125A832 + (ML20125A832)
- ML20125A834 + (ML20125A834)
- 05000321/LER-1979-051-03, /03L-0 on 790726:during Cold Shutdown,While Performing Design Change Request 78-201,control Power Cables to E11-F008 Valve Were Disconnected & Cut W/Valve in Open Position.Caused by Personnel Error.Valve Reconnected + (ML20125A835)
- ML20125A836 + (ML20125A836)
- ML20125A838 + (ML20125A838)