Immediate Action Ltr 79-08 Discussing 790726 Telcon Re Test Results & Analyses Obtained Per IE Bulletin 79-02,Revision 1.Requires Written Evaluation Prior to Use of Epoxy Resin as Fix for Anchor Bolts
ML20125A758
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/26/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Moody
VERMONT YANKEE NUCLEAR POWER CORP.
References
IAL-79-08, IAL-79-8, NUDOCS 7908170214
Download: ML20125A758 (2)


Text

. , s..

IMMEDIATE ACTION LETTF1 ga ucg h l

  1. UNITED STATES
y. (.(~g)

)) - [k g NUCLEAR REGULATORY COMMISSION

.j REGION I 3, .,

g 631 PARK AVENUE KING oF PRUS$1A, PENNSYLVANIA 19406

%, * .%# ,o Docket No. 50-271 July 26, 1979  !

File No. IAL 79-08 i

Vermont Yankee Nuclear Power Corporation ATTN: Mr. D. Moody Manager of Operations 20 Turnpike Road Westborou8h, Massachusetts 01581 Gentlemen:

This refers to the telephone conversation conducted between Mr. E. J. Brunr.er, Mr. D. Moody and other members of tha NRC and Vermont Yankee Nuclear Power Corporation staffs on July 26, 1979, regarding the base plate and anchor bolt test results and analyses obtained for Vermont Yankaa Nuclear Power Station pursuant to IE Bulletin No. 79-02 Ravision 1.

Based on the results of this conversation, it is our understanding that you will take the following actions:

1. Assess the conses;vatism in piping and support design due to the " Robinson Fix". Specifically;
a. A comparison of piping syscam natural frequencies and the response spectrum peaka will be performed.
b. Those systems where resonance can occur will be identified.
2. Identify the types of base plates that exist for the majority of the pipe supports and provide an estimate of the percentage of each type of support.
3. Develop a schedule for replacement of the anchor bolts. Include an expedited schedule for those systems which are identified in item 1.b.
4. Estimate the number of supports inside the drywell which use concrete expansion anchor bolts.

l

5. For those bolts that failed the bulletin test requirements but did not fail the torque test, perform an assessment of the capacity of these bolts in terms of a percentage of the design ultimate capacity.
6. State your conclusions on system operability based on the above assessment.

A written report of your action on the items described in 1 through 6 above will be provided to the regional office and NRR by Tuesday noon, July 31, 1979.

l 7

7 908170 2l }.

l 1 a Vermont Yankee Nuclear Power Corporation Prior to use of epoxy resin material as a fix for the anchor bolts being repaired, provide a written report to the regional office of your evaluation of the acceptability of this method.

l If our understanding of your planned actions, described above, is not in accordrince with the actual plans and actions being implemented, please contact this office by telephone and in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Sincerely, t

/

Boyca H. Grier Director cc:

W. F. Conway, Plant Superintendent J. Abbey, Technical Secretary A. Z. Roisman, Natural Resources Defense Council D. Thompson, XOOS, IE:HQ Lana Cobb, IE:HQ E. Jordan, ADTP, IE:HQ L. E. Tripp, RC&ES Br., RI G. L. Snyder, Assistant to Director, RI