Confirms Schedule for Second Corporate Mgt Meeting Scheduled for 790828.Subjs Which NRC Is Requested to Address Are Listed in Encl Agenda
ML20125A793
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 07/20/1979
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 7908170370
Download: ML20125A793 (3)


Text

'

h /(

ys

[ %o,

- ^

UNITEDSTATES r, NUCLEAR REGULATORY COMMISSION i nacion v

! 411 ftVAN PLAZA DRIVE. SUITE 1000 ARLifeCTOes, TEXAS M012

          • July 20, 1979 l In Reply Refer To:

{ Docket No. 50-445 Texas Utilities Generating Compary ATTN: Mr. B. R. Clements, Vice President and Manager of Nuclear Operations 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:

This letter confirms the schedule for a Second Corporate Management Meeting regarding TUGCO. Based on telephone conversations between you and Mr. R. Smith of this office, the meeting has been scheduled for 9:00 a.m. on August 28, 1979 at Comanche Peak Steam Electric Station.

An agenda for the meeting is enclosed. I have indicated in Section III of the ag(nda those specific subjects which we request that you or your staff address.

You may also present additional material which you consider appropriate.

If you have any quest'io'ns concerning the meeting, or encounter difficulty with the scheduling of the meeting, please do not hesitate to contact me.

Sincerely,

,bd%d-G. L. Madsen, Chir:f, Reactor Operations and Nuclear Support Branch

Enclosure:

Agenda i9gg1 70 37

l SECOND CORPORATE MANAGEMNT DEETING -

Comanche Peak Steam Electric Station, Unit 1 ,

Docket No. 50-445 1 j I. Introduction (G. L. Madsen)

A. Introduce RIV staff B. Invite TUGC0 to introduce licensee representatives C. Opening remarks II. ConstructionProblems(R.G. Taylor)

III. Presentation by the licensee (TUGCO)

A. Staffing for preoperational and startup testing B. Status of the preoperational and startup programs

1. Schedule changes
2. Test Procedures
a. Completed (reviewed and ipproved)
b. Draft crupleted
3. Systems turned over to operations from construction ready for test
4. Preoperational tests completed C. QA program for preoperation and for startup testing D. Licensee interfaces with I&E l

IV. FSAR connitment to be inspected against:

A. Section 14 Test Program (R. Smith)

8. Section17QAProgram(R. Smith)

C. Section 13 Conduct of Operations (R. Smith)

, D. Section5.2.8InserviceInspectiens(Baselinedata)(R. Smith)

_ .__t 2

E. Section 11 Radioactive Waste Management (B. Hurray)

F. Section 12 Radiation Protection (B. Hurray)

G. Section 13 Conduct of Operation (B. Hurray)

V. Ir.spection Program (G. Madsen/T. Westerman /R. Smith)

VI. Inspections against TS and 10 CFR after OL is issued (R. Smith)

A. Surveillance requirements B. Reporting requirements C. Changes to design, tests or procedures VII. Pregram Schedule (R. Smith)

A. IE provides " Finding of Readiness of Licensee"

8. Schedules for indicated programs VIII. Closing rernarks, Discussions (G. Madsen) i j