i Attachment A Marked-Up Technical Specification Pages NPF-11 NPF_18 -

3/41-3*

3/4 1-3*

3/4 1-4 3/4 1-4 3/4 1-5 3/4 1-5

  • No changes have been made to this page. It is included for infoination only.

n 9212090078 921201 PDR: ADOCK 05000373

' P PDR

~

INSEBLA:

d.# With one or more SDV vent or drain lines with one valve inoperable, 1.

Isolate ## the associated line within 7 days.

2.

Otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, e.# With one or more SDV vent or drain lines with both valves inoperable, 1.

Isolate ## the associated line within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

2.

Otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

INSERT B;

  1. eparate Action statement entry is allowed for each SDV vent and drain line.

S

    1. n isolated line may be unisolated under administrative control to allow diaining and A

venting of the SDV.

7 7,q, f IN 0,30 L5 h

?

l

/

1

( For Tn Grm hen %1 REACTIVITY CONTROL SYSTEM 1

~

I 3/4.1.3 CONTROL RODS AA.. A

^

CONTR01 R0D OPERABILITY LIMITING CONDITION FOR OPERATION 3.1.3.1 All control rods shall be OPERABLE.

APPLICABILITY:

OPERATIONAL CONDITIONS 1 and 2.

ACTION:

a.

With one control rod inoperable due to being immovable, as a result of excessive friction or mechanical interference, or known to be untrippable:

1.

Within 1 hour:

l a)

Verify that the inoperable control rod, if withdrawn, is separated from all other inoperable control rods by at least two control cells in all directions.

b)

Disarm the associated directional control valves

  • either:

l 1)

Electrically, or 2)

Hydraulically by closing the drive water and exhaust water isolation valves.

c)

Comply with Surveillance Requirement 4.1.1.c.

2.

Otherwise, be in at least HOT SHUTDOWN within 4.he next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

3.

Restore the inoperable control rod to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, b.

With one or more control rods trippable but inoperable for causes other than addressed in ACTION a, above:

1.

If the inoperable control rod (s) is withdrawn:

a)

Immediately verify:

1)

That the inoperable withdrawn control rod (s) is separated l from all other inoperable withdrawn control rod (s) by at least two control cells in all directions, and 2)

The insertion capability of the inoperable withdrawn control rod (s) by inserting the control rod (s) at least one notch by drive water pressure within the normal operating range **.

[

b)

Otherwise, insert the inoperable withdrawn control rod (s) and disarm the associated directional control valves

  • either:

l 1)

Electrically, or 2)

Hydraulically by closing the drive water and exhaust water isolation valves

  • May be rearmed intermittently, under administrative control, to perrit testing l

associated with restoring the control rod to OPERABLE status.

withdrawn than its position when found to be inoperable.

LA SALLE - UNIT 1 3/4 1-3 Amendment No. 18 i

l

w REACTIVITY CONTROL SYSTEM LIMITING CONDITION FOR OPERATION (Continued)

ACTION (Continued) 2.

If the inoperable control rod (s) is inserted:

a)

Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> disarm the associated directional control llg valves

  • either:

1)

Electrically, or 2)

Hydraulically by closing the drive water and exhaust water isolation valves.

b)

Otherwise, be in at least HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

3.

The provisions of Specification 3.0.4 are not applicable.

lss

~{

,,g 4 ) c.

With more than 8 control rods inoperable, be in at least HOT SHUTDOWN r

(

within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

,Um > (

j SURVEILLANCE REQUIREMENTS 4 1.3.1.1 The scram discharge volume drain and vent valves shall be demonstrated OPo-!ABLE by:

a.

At ?tast once per 31 days verifying each valve to be open**, and-l 16 b.

At least once per 92 days cycling each valve through at least one complete cycle of full travel.

4.1.3.1.2 When above the low power setpoint of the RWM and RSCS, all withdrawn control rods not required to have their directional control. valves disarmed-electrically or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one notch:

a.

At least once per 7 days, and b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when any control rod is immovable as a result of excessive friction or mechanical interference.

4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of cr~N-Surveillance Requirements 4.1.3.2, 4.1.3.4, 4.1.3.5, 4.1.3.6 and 4.1.3.7.

50trt ?

t

  • May be '.rmedintermittently,underadministrativecontrol,topermittestingl33 associated with restoring the control rod to OPERABLE status.
    • These valves may be closed intermittently for testing under administrative l ib control.

-.9 LA SALLE - UNIT 1 3/4 1-4 Amendment No. 18

4 REACTIVITY CONTROL SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 4.1.3.1.4 The scram discharge volume shall be determined OPERABLE by demonstrating'3 r3

~

ItT'~

s h, ',The scram discharge volume drain and vent valves _0PERABLE(.-when N

/ control rods are scram tested from a normal contro.l. rod confi_gura-f

( tion of lyss._than _or_ equal to 50%, ROD DENSITY'st least once per 18 monthf*? by verifying that the drain and Vent valves:

l f

L Close within 30 seconds after receipt of a signal for control d-rods to scram, and 2,

Open after the scram signal is reset.

h

- - - - ~ _.

[ 5.

Proper float response by performance of a CHANNEL FUNCTIONAL TELT D of the scram discharge volume scram and control rod block level s N instrumentation after each scram from a pressurized condition.

m i

l

~-

J

/

  • The provisions of Specification 4.0.4 are not applicable for entry into ;k.

{

' OPERATIONAL CONDITION 2 provided the surveillance is performed within

/

(

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after achieving less-than or equal to 50% ROD DENSITY.

l 1-LA SALLE - UNIT 1 3/4 1-5 Amendment No. 18

i

_ phc Y ~_

Mc[

ap P REACTIVITY CONTROL' SYSTEM M.M*wSA My 3/4.1.3 CONTROL RODS CONTROL ROD OPERABILITY >

- LIMITING CONDITION FOR OPERATION 3.1.3.1 -All control rods-shall be OPERABLE.

?

APPLICABILITY: -OPERATIONAL CONDITIONS-1,-and 2.

l ACTION:

With one control rod. inoperable due-to being immovable, asla result of

.a.

excessive friction or mechanical interference, or known tu be untrippable:

1.

W. ithin-.1 houri a)

Verify that-the inoperable control rod, if withdrawn. is-separated from all other inoperable control rods by at least two control cells in all directions.

b)

Disarm the associated ' irections) control valves

  • either:

d 1)

Electrically, or 2)

Hydraulically by closing the drive water and exhaust water

~

isolation valves.

c)

Comply with Surveillance Requirement 4.-l.1.c.

2.

_ 0therwise,_be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

3.

Restore the_ inoperable-contro1~ rod-to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the' nextL12 hours.

b.

With onc or more control rods trippable but inoperable for causes other than addressed in ACTION a,_above:

1.

If the inoperable control rod (s) is withdrawn:

a)

Immediately verify:

1)

That _the inograble withdrawn control rod (s) is separated from all other inoperable withdrawn control-rod (s) by at least two control l cells in all directions, and 2)

The insertion capability _of-the inoperable withdrawn..

control rod (s) by inserting the control rod (s).at least-one notch by drive water pressure within the normal operating range **.

b)

Otherwise,Linsert the inoperable withdrawn control rod (s) and disarm the associated directional. control valves *.elther:

1)

Electrically, or 2)

Hydraulically.by closing the drive water and exhaust-water isolation valves

^May be rearmed intermittently, un' der administrative control, to permit testing associated with restoring the control rod to 0PERABLE status.

. withdrawn than its position when found to be inoperable.

c l

LA SALLE - UNIT 2 3/4.1-3 Amendment No.

53 e

m v

c.v n-,

- - ~,

.ye--

,w e

n ew-.

e

.+-y

REACTIVITY CONTROL SYSTEM LIMITING CONDITION FOR OPERATION (Continued)

ACTION (Continued) 2.

If the inoperable control rod (s) is inserted:

a)

Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> disarm the associated directional control valves

  • either:

1)

Electrically, or 2)

Hydraulically by closing the drive water and exhaust water isolation valves.

b)

Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

3.

The provisions of Specification 3.0.4 are net applicable'.

h f V' b[r #tA)i With more than 8 control rods inoperable, be in at least HOT SHUTDOWN c.

within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

_^ ^&_

)

SURVEILLANCE RE0VIREMENTS 4.1. 3.1.1 The scram discharge volume drain and vent valves shall be demonstrated OPERABLE by:

At least once per 31 days verifying each valve to be open**, and a.

b.

At least once per 92 days cycling each valve through at least one complete cycle of full travel.

4.1.3.1.2 When above the low power setpoint of the RWM and RSCS, all withdrawn control rods not required to have their directional control valves disarmed electrically.or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one notch:

a.

At least once per 7 days, and b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when any control rod is immovable as a result of excessive friction or mechanical interference.

4.1.3.1.3' All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4.1. 3. 2, 4.1. 3. 4, 4.1. 3. S, 4.1. 3. 6, a nd 4.1. 3. 7.

m n 9

_1 np(t 3

  • A/['

"May be rearmed intermittently, under acministrative control, to permit testing i

associated with restoring the control rod to OPERABLE status.

(

    • These valves may be closed intermittently for testing under administrative

\\x%-3 control.

LA SALLE - UNIT 2 3/4 1-4

REACTIVITY CONTROL SYSTEM SURVEILLANCE REOUIREMENTS (Continued) 4.1.3.1.4 The scram. discharge volume shall'be determined OPERABLE by demonstratin9fri-qw/

A ('/he scram discharge volume drain and vent valves OPERABLE] w rdohtiol7oifs a e sdam tesTeTfrom a niirmil ciintFo1~=65 configura-

~

( tion of 1.ess than or equal to 50% ROD DENSITY /at'liast once per

~18 monthf{' by veVifyTng 'thif~the drain ~ arid ~Vint valves:

J 'L Close within 30. seconds after receipt of'a signal for control rods to scram, and

~

b. %

Open after the scram signal is reset.

-~,

b.

Proper float and level sensor response by performance of a CHANNEL

(

FUNCTIONAL TEST of the scram discharge volume scram and control rod' Y N

block level instrumentation at least once per 31 days.

j

  • The provisions of Specification 4.0.4 are not applicable for entry into ')_(

j OPERATIONAL CONDITION 2 provided the surveillance is performed within -/

(

12 ho u r s a f te r achi ev i ng l.e s s.t..ha. n_. o_.r. _e_.qu_a _l to._50% ROD DENSITY.

\\q LA SALLE - UNIT 2 3/4 1-5

--.