Forwards Response to IE Bulletin 79-13,Item 5.Emergency Procedures EP-108 & EP-105 Have Been Revised Extensively, in Light of TMI-2 Accident.Describes Methods of Detecting Feedwater Leaks in Containment
ML20125A832
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/16/1979
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
3--3-A-3, 3-0-3-A-3, NUDOCS 7908200264
Download: ML20125A832 (2)


Text

-

t

[ l( '

e, VEllRC RE-

  • ?. *:7 r.

4 6

c.

'O Ol!l l9 A 8 : $b

\\

...,c' Florida P.o. w..e.r.

July 16, 1979 l

File:

3-0-3-a-3 l

Mr. J. P. O'Reilly, Director i

U.S. Nuclear Regulatory Commission Office of Inspection 8 Enforcement 101 Marietta Street, Suite 3100 Atlanta, GA 30303

Subject:

Crystal River Unit #3 Docket No. 50-E 2 Operating 1.icense No. OPR-72 IE Bulletin 79-13

Dear Mr. O'Reilly:

Enclosed please find our response to Item 5 of IE Bulletin 7913. Our response to Item 6 will be submitted on or before July 25, 1979.

Should you have av questions, please contact me.

l Very truly yours, I

FLORIDA POWER CORPORATION 9

$-a I

W. P.

tewart Manager, Eclear Operations WPSeehM04 i

05

/r 1"Y[

m 0

1 Y

E ha' ON<e notyamwenewy.eo e imar e % see.wn.ei enssis.

t Response to item 5 Item 5a Provide your schedule for taspection if required by Ites 1.

Response

This itee is not applicable to Crystal River Dait 3.

Item 5b i

Address the adequacy of your operattag and energency procedures to recognize and respond to a feeduster line break accident.

Response

Emergency Procedure IP-108, less of Steam Cenerator Feed, addresses recognition and response to a feeduster line break accident. Reference to EF-105, Steam Supply Systen Rapture, is gives as the required lamediate 1

action. These procedures have been revised extensively to reflect the latest operating guidelines during accident conditions as a result of the TM1-2 events. These revised procedores were locluded la the training program at CR

  1. 3 and have been reviewed and found acceptable by both the NRC (!&E and IctR) and Florida Power Corporattoa.

Ites Sc State the methods and esasitivity of detection of feeduster leaks in containment.

Response

Per EF-108, the followiag symptoms are to be analysed to verify feeduster system rupture (locluded are lastrument number, spen, and tolerance):

Symptoms lastrument i M

Tolerance 1.

Increastog FW SP-SA & SR-FE 6000x10 1bs/hr

+ 60 x 103 lbsAr 3

Flow 2.

Decreastag Steam SP-1A & 15-LT2 291.51 in. H O

+ 11 2

~

Cenerator Level SP-1A & B-LT3 3

Decreasing Mata SP-6A & 68 -Fft 1200 pois

+ 18 pois Steam Pressure SP-6A & 68 -PT2 i

I N

D5

,_,,