ML20125A817
| ML20125A817 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/13/1979 |
| From: | Moore G FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7908170630 | |
| Download: ML20125A817 (11) | |
Text
_
Q
/ /(.
i f
~
~
e, U S N R C R E '1:;;.:
aTIANTA f.i ioricta
'OWer (9 Jllt.16 A 8
.10 July 13, 1979 1Aosuut rtic:
3-0-3-a-3 essmae Lsurecn P. D. cme 00et W. &.1%mA F. L IfJIE C L WUtpff L 1 511'443m9 Mr. J. P. O'Reilly, Director
- s. u. cins of fIce of Insrectton a Enfortement h,,s U.S. Nuclear Negulatory Commission 4" ", g,,
Sulte 3100 101 Hartetta Street
$O,cf Atlanta, GA 30303 Sub,j ect:
Crystal River - Unit 3 Docket flo. E0-302 Operating License flo. OpR-72 IC Dulletin 79-02, Rev. 1
Dear Mr. O'Refily:
Enclosed ts a suppicment to our response of' July 6,1979 to It l
Dullettn 79-02, Rev. 1, dated June 21, 1979, which includes 1E Dulletin 79-02.
Ile understand t. hat for a system to be generally considered oper-abic, all hangers must have a safety factor of 2:1 or greater.
Prtor to entering MDOE 2, Florida power Corporation wl11 upgrade all hangers with a safety factor of less than 2:1 to a safety factor of 4:1 or 5:1, as appitcable, or will. provide an analysis demonstrating the inteprity, during the derlyn basis carthquake (DUE) of each system tluit has a hanger wtth a safety f actor of test then 2:1.
rurthennore, all accessible hangers With a safety f a.: tor of less than 4:1 or 5:1, as applicable, will he upgraded to the appropriate safety factor as soon as possible.
1he attached Table I tdentt fles Welch hangers are inaccentble.
Table !I (dentifles hanger changes required by design.
A alte-stone schedule for this repair will L e sulnettled on or about July 20,1979.
All fnaccessible hangers with a safety rector of Icss than 4: 1 or 5:1, as applicable, will be upgraded to the appropriato safety factor prior.to the startup after~(he next refueling outago.
N.1 er.._,e...._,,._..._.....-............:..........-...
- y e
.g
~..
L,
i.s %......
Mr. J. P. O'Reilly Page 2 July 13, 1979 Florida Power Corporat.fon has made a review of all hangers wf th a safety factor between 2 and 4 and established if any pther such hangers are near.
The basis of the review was thr three hangers with a safety f' actor greater than four sfiould be bot.it upstream ami downstreen frem a hanger with a safety factor bet. ween 2 and 4.
All hangers wtth a safety factor less than 2 are assioned fixed.
(Previous riorida Power connit. ment.)
Florida Power f'urther camatt.s to make any repairs necessary to have 3 hangers with a safety factor greater than 4 hoth upstrean I
and downstream of any hanger wf t.h a safety factor.between 2 and l
4.
l These modiffcations will be complete prloi= to reaching Mode 2 operation.
rinally, the six (6) questions that were asked of IPC* by the NRC during the telecon of' July G.1979. will he responded to on or about. July 20. 1979.
If you have any further quest fons on this subject, please do not hc5ft. ate t.o cont.act me.
Sin:crely, FLOR 10A POWER CORPORATION ol ke P00RBRI8lWl.
~
t
/ 'G. C. Itoore Assistant Vice President Powcr Production WP5cmhWa(03) i e
_._._