ML20125A828
| ML20125A828 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/05/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20125A831 | List: |
| References | |
| NUDOCS 8506110210 | |
| Download: ML20125A828 (2) | |
See also: IR 05000225/2005003
Text
*
,. ?
Dme
'
.
- .
.
.
~
_
'Y-'
JUN 0 51985
.
' In Reply Refer.To:
.' Docket:
50-458/85-18
w
s
Gulf States Utilities
- ATTN
- William J. Cahill,.Jr.
Senior Vice> President
-
-River Bend Nuclear Group
P. O. Box 2951
,
" Beaumont, Texas 77704
,
.
Gentlemen:
~This refers to the inspec' tion conducted by' Messrs. R. P. Mullikin and
" "
J. E. Bess of this office during the period February 25 - May 3,1985, of
activities authorized by NRC' Construction Permit CPPR-145 for River Bend
Station, and to the discussion of our findings with Mr. T. .L. ,Crouse, and other
members of your-staff at the conclusion of the inspection.-
,
? Areas examined during'the inspection included electrica'l equipment and'
.
. instrumentation installations,. verification of electrical cable terminations-
and routing,- review of QC personnel qualification records, review of electrical
l separation, and rev'iew of licens'ee audits and s.urveillances. Within these
n
'
' areas, the inspection consisted of selective examination of procedures and-
representative records,' interviews with personnel, and~ observations by the
' inspectors. These findings are documented in the enclosed inspection report.
' '
During this inspection, Lit was found that certain of your activities appeared
.
to deviate from a commitment made.to the NRC.
This item and reference to the
commitment"is identified in the enclosed Notice of Deviation. You are
' requested to respond to this deviation in writing.
Your response should be
based on the specifics contained in the Notice;of Deviation enclosed with this
letter.
The response directed by th'is letter and the accompanying Notice is not subject
-
J
'to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1990',~ PL~96-511.
.
O
M
dd
M
RIV: RPB2/A-
C:RPB2/A
RPB1/A
C:RPB1
$PMullikin/jc]
LEMartin
JPJaudon
EHJohnson
'
/4/85
b/ 4 /85
b/ f /85
6/]/85
k
\\
8506110210 850605
'
J'N
{DR
ADOCK 05000458
I
g
l
,
_ _ - __ _ _ _ - - _ -
_
_
_
_ - _ .
_ -- -
_ _ _
c.
Gulf States Utilities
-2-
.
Should you have any' questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
lS/
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosures:
1.
Appendix A - Notice of Deviation
2.
Appendix B - NRC Inspection Report
50-458/85-18
>
cc w/ enclosures:
Gulf States-Utilities
DATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels &_ Licensing
-P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University.
Government Documents Department
Louisiana Radiation Control Program Director
,
s
.
bec to DMB (IE01)
bec distrib. by RIV:
- RPB1
R. P. Denise, DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB1/A)
- D. Weiss, LFMB (AR-2015)-
- MIS System
J. Bess
R. Mulliken
- RSTS Operator
- EP&RPB
- RIV File
- w/766
l
!
i
!
_I
t-