ML20125A828

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/85-18 on 850225-0503 & Notice of Deviation
ML20125A828
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/05/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20125A831 List:
References
NUDOCS 8506110210
Download: ML20125A828 (2)


See also: IR 05000225/2005003

Text

*

,. ?

Dme

'

.

.

.

.

~

_

'Y-'

JUN 0 51985

.

' In Reply Refer.To:

.' Docket:

50-458/85-18

w

s

Gulf States Utilities

ATTN
William J. Cahill,.Jr.

Senior Vice> President

-

-River Bend Nuclear Group

P. O. Box 2951

,

" Beaumont, Texas 77704

,

.

Gentlemen:

~This refers to the inspec' tion conducted by' Messrs. R. P. Mullikin and

" "

J. E. Bess of this office during the period February 25 - May 3,1985, of

activities authorized by NRC' Construction Permit CPPR-145 for River Bend

Station, and to the discussion of our findings with Mr. T. .L. ,Crouse, and other

members of your-staff at the conclusion of the inspection.-

,

? Areas examined during'the inspection included electrica'l equipment and'

.

. instrumentation installations,. verification of electrical cable terminations-

and routing,- review of QC personnel qualification records, review of electrical

l separation, and rev'iew of licens'ee audits and s.urveillances. Within these

n

'

' areas, the inspection consisted of selective examination of procedures and-

representative records,' interviews with personnel, and~ observations by the

' inspectors. These findings are documented in the enclosed inspection report.

' '

During this inspection, Lit was found that certain of your activities appeared

.

to deviate from a commitment made.to the NRC.

This item and reference to the

commitment"is identified in the enclosed Notice of Deviation. You are

' requested to respond to this deviation in writing.

Your response should be

based on the specifics contained in the Notice;of Deviation enclosed with this

letter.

The response directed by th'is letter and the accompanying Notice is not subject

-

J

'to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1990',~ PL~96-511.

.

O

M

dd

M

RIV: RPB2/A-

C:RPB2/A

RPB1/A

C:RPB1

$PMullikin/jc]

LEMartin

JPJaudon

EHJohnson

'

/4/85

b/ 4 /85

b/ f /85

6/]/85

k

\\

8506110210 850605

'

J'N

{DR

ADOCK 05000458

I

g

PM

l

,

_ _ - __ _ _ _ - - _ -

_

_

_

_ - _ .

_ -- -

_ _ _

c.

Gulf States Utilities

-2-

.

Should you have any' questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

lS/

E. H. Johnson, Chief

Reactor Project Branch 1

Enclosures:

1.

Appendix A - Notice of Deviation

2.

Appendix B - NRC Inspection Report

50-458/85-18

>

cc w/ enclosures:

Gulf States-Utilities

DATTN:

J. E. Booker, Manager-

Engineering, Nuclear

Fuels &_ Licensing

-P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University.

Government Documents Department

Louisiana Radiation Control Program Director

,

s

.

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB1

R. P. Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB1/A)
  • D. Weiss, LFMB (AR-2015)-
  • MIS System

J. Bess

R. Mulliken

  • RSTS Operator
  • EP&RPB
  • RIV File
  • w/766

l

!

i

!

_I

t-