ML20125A828

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/85-18 on 850225-0503 & Notice of Deviation
ML20125A828
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/05/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20125A831 List:
References
NUDOCS 8506110210
Download: ML20125A828 (2)


See also: IR 05000225/2005003

Text

  • .

'

,. ?

. Dme

. .

~

_

'Y-'

JUN 0 51985 .

' In Reply Refer.To:

.' Docket: 50-458/85-18

w

s

Gulf States Utilities

ATTN
William J. Cahill,.Jr.

Senior Vice> President -

-River Bend Nuclear Group

,

P. O. Box 2951

,

" Beaumont, Texas 77704

.

Gentlemen:

" "

~This refers to the inspec' tion conducted by' Messrs. R. P. Mullikin and

J. E. Bess of this office during the period February 25 - May 3,1985, of

activities authorized by NRC' Construction Permit CPPR-145 for River Bend

Station, and to the discussion of our findings with Mr. T. .L. ,Crouse, and other

members of your-staff at the conclusion of the inspection.-

,

? Areas examined during'the inspection included electrica'l equipment and'

. . instrumentation installations,. verification of electrical cable terminations-

and routing,- review of QC personnel qualification records, review of electrical

n l separation, and rev'iew of licens'ee audits and s.urveillances. Within these

'

' areas, the inspection consisted of selective examination of procedures and-

representative records,' interviews with personnel, and~ observations by the

' inspectors. These findings are documented in the enclosed inspection report.

During this inspection, Lit was found that certain of your activities appeared

.

' '

to deviate from a commitment made.to the NRC. This item and reference to the

commitment"is identified in the enclosed Notice of Deviation. You are

' requested to respond to this deviation in writing. Your response should be

based on the specifics contained in the Notice;of Deviation enclosed with this

letter.

The response directed by th'is letter and the accompanying

-

J

Notice is not subject

'to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1990',~ PL~96-511.

.

O

RIV: RPB2/A-

M

C:RPB2/A RPB1/A

dd C:RPB1

M

$PMullikin/jc] LEMartin JPJaudon EHJohnson

6/]/85 /4/85

'

b/ 4 /85 b/ f /85

k

'

\

8506110210 850605

,

{DR ADOCK 05000458 PM

J'N l

I

g

_ _ - __ _ _ _ - - _ - _ _ _ _ - _ .

_ -- -

_ _ _

c. *

Gulf States Utilities -2-

.

Should you have any' questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

lS/

E. H. Johnson, Chief

Reactor Project Branch 1

Enclosures:

1. Appendix A - Notice of Deviation

2. Appendix B - NRC Inspection Report

50-458/85-18 >

cc w/ enclosures:

Gulf States-Utilities

DATTN: J. E. Booker, Manager-

Engineering, Nuclear

Fuels &_ Licensing

-P. O. Box 2951

Beaumont, Texas 77704

Louisiana State University.

Government Documents Department

,

Louisiana Radiation Control Program Director

s .

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB1 R. P. Denise, DRSP
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB1/A) *D. Weiss, LFMB (AR-2015)-
  • MIS System J. Bess

R. Mulliken

  • RSTS Operator
  • EP&RPB
  • RIV File
  • w/766

l

!

i

!

t- _I