Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NSD-NRC-96-4760, Forwards Rev 7 to AP600 Pra. List of Sections Included in PRA Rev 7 Provided in Encl 1.Rev 7 of PRA Provided as Encl 2.Electronic Computer Disk Located in File Ctr + (ML20113C746)
- ML20113C750 + (ML20113C750)
- ML20113C770 + (ML20113C770)
- ML20113C785 + (ML20113C785)
- ML20113C833 + (ML20113C833)
- PY-CEI-NRR-2070, Informs That Plant Intends to Modify Requirements for Position of Perry Nuclear Assurance Dept Director as Delineated in Chapters 13.1 & 17.2 of USAR + (ML20113C842)
- NLS8500061, Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage + (ML20113C851)
- ML20113C858 + (ML20113C858)
- ML20113C864 + (ML20113C864)
- ML20113C866 + (ML20113C866)
- ML20113C870 + (ML20113C870)
- ML20113C875 + (ML20113C875)
- ML20113C905 + (ML20113C905)
- ML20113C909 + (ML20113C909)
- ML20113C913 + (ML20113C913)
- ML20113C915 + (ML20113C915)
- ML20113C916 + (ML20113C916)
- ML20113C918 + (ML20113C918)
- 05000322/LER-1985-009, :on 850305,reactor Water Cleanup Sys Inadvertently Isolated.Caused by Contact of Two Leads During post-work Logic Circuit Testing on Steam Leak Detection Sys. Testing Resumed & Completed W/O Incident + (ML20113C920)
- ML20113C922 + (ML20113C922)
- ML20113C923 + (ML20113C923)
- ML20113C929 + (ML20113C929)
- ML20113C931 + (ML20113C931)
- ML20113C934 + (ML20113C934)
- ML20113C936 + (ML20113C936)
- A04718, Forwards Response to Request for Addl Info Re Item 4 of IE Bulletin 79-02 Concerning Verification of Design Requirement for Concrete Anchor Bolts from Insp Rept 50-336/85-01,per 850222 Commitment + (ML20113C949)
- ML20113C951 + (ML20113C951)
- ML20113C956 + (ML20113C956)
- ML20113C959 + (ML20113C959)
- ML20113C963 + (ML20113C963)
- ML20113C966 + (ML20113C966)
- ML20113C969 + (ML20113C969)
- ML20113C971 + (ML20113C971)
- ML20113C989 + (ML20113C989)
- ML20113C990 + (ML20113C990)
- ML20113D001 + (ML20113D001)
- PY-CEI-NRR-0223, Forwards Rev 4 to 80A4425, Preservice Insp Program Plan: RCIC, 80A4426, ...:Feedwater Sys & 80A4423,...:LPCS Sys. Revs Replace Preservice Insp Program Plans Submitted w/841214 Ltr + (ML20113D005)
- ML20113D010 + (ML20113D010)
- ML20113D013 + (ML20113D013)
- ML20113D019 + (ML20113D019)
- ML20113D022 + (ML20113D022)
- ML20113D031 + (ML20113D031)
- 05000281/LER-1984-021-02, :on 841216,w/unit at Approx 20% Power & Ramping Down for Secondary Sys Repair,Unit Tripped When Breakers for Main Feed Pump B Opened.Caused by Invalid Low Flow Condition.Trip Circuitry Tested + (ML20113D037)
- 05000317/LER-1984-016, :on 841215,during Performance of Surveillance Test STP-0-67,HPSI Sys Injection Leg Flows Outside Tech Spec Requirement.Caused by Improperly Set Limit Switches.Switches Adjusted + (ML20113D059)
- ML20113D072 + (ML20113D072)
- TXX-4220, Forwards Table Providing Description of 840713 Amend 50 to FSAR + (ML20113D093)
- ML20113D096 + (ML20113D096)
- TXX-4443, Forwards Estimates for Future Operator Licensing Exams in Response to Generic Ltr 85-04 + (ML20113D104)
- U-602601, Responds to NRC 960523 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate Valves + (ML20113D113)
- 05000346/LER-1984-012, :on 840821,Kaowool Packing Around Conduit Going Into Bottom of Reactor Protection Sys Channel 2 Cabinet Fell Out.Addl Kaowool Immediately Stuffed in Penetration + (ML20113D114)
- RBG-43006, Monthly Operating Rept for May 1996 for River Bend Station Unit 1 + (ML20113D116)