Verifies 831018 Prior Notice of Cancellation of Facility, Withdraws Application for OL & Requests Rescission of CPPR-138.No Addl Actions Necessary for Stabilization of Unit 2 Excavation
ML20113D072
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 04/09/1985
From: Hall D
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20113D074 List:
References
OL, U-0821, U-821, NUDOCS 8504120244
Download: ML20113D072 (2)


Text

Ti U-0821

. L30-85 (04-09 )-L

< 4 1A.120 ILLIN018 POWER COMPANY IP CLINTON POWER STATION. P.o. BOX 678. CLINTON ILLINOIS 61727 April 9, 1985 Docket No. 50-462 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation-U. S. Nuclear Regulatory Commission

. Washington, DC 20555

Subject:

Clinton Power Station Unit 2 Docket No. 50-4620L Withdrawal Construction Permit No. CPPR - 138 Withdrawal

Dear Mr. Denton:

This letter is written to formally verify Illinois Power's (IP) prior notice of the cancellation of Clinton Power Station (CPS) Unit 2 dated October 18, 1983, to withdraw the application for an operating license for. Unit 2, and to request the rescission of Construction Permit No..CPPR-138 issued for Unit 2.

On February 24, 1976,.the Office of Nuclear Reactor Regulation issued Construction Permit Nos. CPPR - 137 and CPPR -138 for Units 1 and 2 at the Clinton Power Station on Docket Nos. 50-461 and 50-462. The expiration date for the Construction Permit for Unit 1, CPPR -137, has been extended.to October 1, 1986, the most recent extension being issued on March 8, 1985. Construction Permit No. CPPR - 138, for CPS Unit 2, expired on October 1, 1981.

'On September.8, 1980, an application for operating licenses for Units 1 and 2 was docketed by the Commission as Docket Nos. 50-461 OL and 50-462 OL respectively. IP was the sole-applicant for-CPS Unit 2.

On November 7, 1980, an order was entered establishing an Atomic Safety.

and Licensing Board (ASLB) for these Do'ckets and on November 13, 1981, the ASLB severed the two dockets and stayed the proceedings-for Unit 2,

~

Docket 50-462 OL. By letter to the ASLB members dated October 18, 1983,

-(attached) with copies to the parties and the staff, IP gave notice that Unit 2 had-been cancelled.

IP hereby formally notifies the NRC of the cancellation of Unit 2,

+ ' withdraws the application for an operating license for Unit 2, and requests that Construction Permit CPPR.- 138 be rescinded. IP will make the necessary conforming amendments to the application and tc the FSAE.

As previously. discussed with the staff, no actions beyond thosa already-taken are necessary for stabilization of the Unit 2 excavation. These

-actions, which are. described in FSAR subsection 2.5.4.14.4, were taken following the suspension of Unit 2 construction, but prior to the 8504120244 850A09 D PDR ADOCK 05000462 PDR A y i

I

! U-0821

. L30-85(04-09)-L 1A.120 official notice of its cancellation. IP also will file a motion with the ASLB to terminate the licensing proceedings for Unit 2, Docket No.

50-462 OL, without prejudice, and to authorize the Director of the Office of Nuclear Reactor Regulation to rescind the Construction Permit.

If you have any questions on this matter or require further information, please do not hesitate to contact me.

e ours,

. . Hall Vice President RWW/ lab Attachment cc: B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office Regional Administrator, Region III USNRC Illinois Department of Nuclear Safety I