ML20113D010

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Omission of Water Weight Values in Teledyne Piping Analysis.First Interim Rept Incorrectly Stated Expected Submittal Date for Next Rept. Rept Expected by 850712
ML20113D010
Person / Time
Site: Bellefonte  
Issue date: 03/05/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8504120209
Download: ML20113D010 (1)


Text

rv-TENNESSEE VALLEY AUTHORITY i

CHATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II BLRD-50-438/84-36 M BLRD-50-439/84-36 U.S. Nuclear Regulatory Canaission Region II

' Attn:

.Dr. 'J. Nelson Grace, Regional Administrator

-101 Marietta Street, NW, Suite 2900 Atlanta, Georgia '30323 l

Dear Dr. Grace:

BELLEFGITE NUCLEAR PLANTS INITS 1 AND 2 - OMISSIGi OF INTER 1EIQIT IN VALVES IN PIPING ANALYSIS BY TELEDDIE - BLRD-50-438/84-39, BLRD-50-439/84 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on Jtme 7,1984 in accordance with 10 TR 50.55(e) i as NCR BLN 2B 8408. 'As discussed with NRC-0IE Inspector A. Ignatonis on i

February 25, 1985, our letter to you dated July 6,1984 transmitting our

' first interia report, incorrectly stated that our next report is expected to be submitted on a* about February 8,1985. The correct date for our next submittal is on or about July 12, 1985.

If you have any questions, please get in touch with R. H. Shell at j

FTS 858-2688.

I Very truly yours, TENNESSEE VALLEY AUTHORITY

. W. Hufhma, Manager -

Licensing and Regulations 1'

- oc: ~ Mr. James Taylor, Director l

Office of Inspection and Enforcement j:

U.S. Nuclear Regulatory Canaission Washington,.D.C. 20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 i

8504120209 850305 PDR ADOCK 05000438 S

PDR VI q

An Equal Opportunity Employer

((gy

.