ML20113C929

From kanterella
Jump to navigation Jump to search

Advises of Position Re Piping Replacement & Intention to Pursue Third Cycle of Svc W/Weld Overlays.Justification for Continued Svc & Insp Plans for Fall 1985 Maint/Refueling Outage Will Be Submitted by 850501
ML20113C929
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/21/1985
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1522N, NED-85-169, TAC-59029, NUDOCS 8504120141
Download: ML20113C929 (1)


Text

, _ _

G2orgia Power Company 333 Pedmont Avenue -

Atlanta, Georg'a 30308 Telephone 404 5264526 -

Malling Address:

Post Off:ce Box 4545 Atlanta, Georgia 30302 Georgia Power

. L T. Gucwa the southern eiectnc system Manager Nuclear Engineenng and Chief Nuclear Eng:neer WD-85-169 1522N March 21, 1985 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing b

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 NOTICE OF INTENT TO SUBMIT JUSTIFICATION FOR CONTINUED SERVICE WITH WELD OVERLAYS Gentlemen:

During recent discussions with Mr. H. L. Thompson, Jr. of WC concerning Plant Hatch licensing activities, etc., Messrs. R. E. Conway and L. T. Gucwa of Georgia Power Company (GPC) indicated that the main recirculation system 3

piping at Hatch triit 1 would not be Ieplaced during the Fall 1985 maintenance / refueling outage and that GPC would pursue a third cycle of service with weld overlays.

The purpose of this letter.is to formally advise you of our position Iegarding piping replacement and our intention to pursue a third cycle of service with welo overlays.

While your letter dated January 3,1985 indicates that we are to submit inspection plans at least thirty days prior to the next outage, we intend to submit, tentatively by May 1,1985, our justification for continued service with weld overlays and our inspection plans for the Fall 1985 maintenance /Iefueling outage for your Ieview and comment.

Should you have any questions in this regard, please contact this office.

Sincerely yours,

& X Q s_<

L. T. Gucwa JAE/mb xc:

J. T. Beckham, Jr.

H. C. Nix, Jr.

J. N. Grace (WC-Region II)

Senior Resident Inspector Sj41hkNo 3 1 g

l}O t

i