SOUTH CAROLINA ELECTRIC & GAS COMPANY
?!-
post orrica ves COLUMerA, south CAROLINA 29210 O. W. DmoN. Ja.
vice pas.**"'
April 4, 1985 NUCLEAm opsmatioN$
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Naclear Regulatory Commission Washington, D.C. 20555
^
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Unit Staff Overtime y
Dear Mr.<Denton:
l Section 4.2.2.f of the Technical Specifications for the VirgilC. Summer Nuclear Station discusses overtime limitations for unit staf f,that perforts safety-related functions. This Technical Specification provides guidelines to be followed in the eveat substantial use of overtime is required. This letter is being provided to clarify South Carolina Electric and Gas Company's (SCE6G) interpretation of sub-section 6.2.2.f.d of the Technical Specifications.
,t As noted in sub 'section 6.2.2.f.d, overtime is to be considered on an individual basis except _during extended shutdown periods. During these.
occasional extended cctages, the Director, Nuclear Plant Operations, his g
deputy, or a higher level of management can authorize a work group to deviate
.p' from the overtime guidelines in Technical Specification 6.2.2.f to support the f
necessary workload'during the out, age.
/
b-
/;
The Director,. Nucleae Plant Operation 9, or, h'is desjgnee, reviews a monthly-overtime deviation re:. port which lists the authori[zc./."vork group overtime deviations. This report cust indicate authorized L' viatio:.is for each e
applicable work-group and/whether the authorizat".on.vss,obtained prior to actually exceeding the 1 imitations. The ind',ridtiala within the work-groups 1
- who actually deviate add not required to be Q'sted on 'the nonthly report if g.
j, their workgroup is schorized to exceed the,overtirm guidelines. This
. practice enables management to review the n6mber of overtime deviations being l
authorized and to assess the effectileness of SCE4G's administrative controls used to assure?' ersonnel' do not exy'ied 'the Technical Specification y,v,idelines I
p without prior managgment review and approval.
G y
?
V l
l v.
8504120073 850404 PDR 'ADOCK 05000395
/
l p
/
c I
f
/
a IlO j
aa0
-L
=
- t..
Y Mr. HaroldL R. Denton, Director Unit-Staff Overtime
=
' April 4, 1985 Page #2
.e If you have any questions, please advise.
Ve truly y Spff, 4
I, s
I W. Dixo, Jr.
'AMM/0WD:gj At tachment :
C. A. Price cc:
V. C. Summer T. C. Nichols, Jr./O. W. Dixon, Jr.
C. L. Ligon (NSRC)
E. H. Crews, Jr.
K. E. Nodland E. C. Roberts R. A. Stough W. A. Williams, Jr.
G. Percival D. A. Nauman C. W. Hehl J. N. Grace J. B. Knotts, Jr.
Group Managers NPCF
- 0. S. Bradham File
?
r s
a 4
D 4
. i 1-Y JJ.
,._.1-
.e, 2-_,-,,-
y~.
. -