Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076L712 + (ML20076L712)
- 05000339/LER-1983-061-03, /03L-0:on 830818,discovered Open Penetration in Roof of Battery Room 2-II.Cause Undetermined.Threaded Pipe Cap Installed as Permanent Fire Barrier + (ML20076L716)
- B10876, Forwards Responses to Agenda Items from 830626-28 Meetings W/Nrc & S&W in Boston,Ma Formalizing Commitments Made Orally at Meeting.Response to Addl Items Will Be Submitted by 831215.Info Will Be Incorporated Into FSAR Amend + (ML20076L718)
- ML20076L720 + (ML20076L720)
- 05000339/LER-1983-060-03, /03L-0:on 830811,heat Tracing Circuit ET-167N (Boiler Injection Tank Outlet Piping) Failed.Caused by Failed Control Card.Card Replaced + (ML20076L721)
- ML20076L725 + (ML20076L725)
- ML20076L731 + (ML20076L731)
- ML20076L732 + (ML20076L732)
- ML20076L734 + (ML20076L734)
- ML20076L740 + (ML20076L740)
- ML20076L746 + (ML20076L746)
- ML20076L749 + (ML20076L749)
- ML20076L755 + (ML20076L755)
- ML20076L758 + (ML20076L758)
- ML20076L762 + (ML20076L762)
- 05000348/LER-1983-046-03, /03L-0:on 830811 & 12,train B Containment Hydrogen Analyzers,Train Control Room Air Cleanup Sys,Train B RCS Subcooling Margin Monitor & Instrument Channel LI3594B & LI3282B Declared Inoperable.Caused by Tripping of Breaker + (ML20076L766)
- ML20076L773 + (ML20076L773)
- ML20076L775 + (ML20076L775)
- PY-CEI-NRR-0072, Provides Addl Info Re Scram Hydrodynamic Loads on Control Rod Drive Sys,Per 830621 Request.Info Will Be Incorporated Into Future FSAR Amend + (ML20076L784)
- IR 05000369/1983028 + (ML20076L793)
- ML20076L797 + (ML20076L797)
- ML20076L802 + (ML20076L802)
- ML20076L808 + (ML20076L808)
- ML20076L811 + (ML20076L811)
- L-83-465, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/83-25 & 50-250/83-25.Corrective Actions Withheld (Ref 10CFR73.21) + (ML20076L830)
- ML20076L832 + (ML20076L832)
- ML20076L834 + (ML20076L834)
- ML20076L836 + (ML20076L836)
- ML20076L841 + (ML20076L841)
- ML20076L849 + (ML20076L849)
- ML20076L850 + (ML20076L850)
- 05000354/LER-1994-014-01, :on 941002,reactor Scram Occurred Due to Sudden Trip of Main Turbine Generator.Caused by Design Deficiency in Digital Fwcs.Confirmatory Level 8 Trip for Main Turbine Wired Correctly & Design Change Implemented + (ML20076L853)
- 05000302/LER-1994-005, :on 940928,failure to Perform Reactor Coolant Pump Motor Flywheel Occurred.Caused by Cognitive Personnel Error.Personnel Counselled & Regulatory Review Will Be Conducted to Determine Further Actions + (ML20076L854)
- AECM-83-0546, Updated RO 83-028/1:on 830329,fire-rated Penetrations,Listed on Encl,Opened to Implement Design Change Packages W/Hourly Fire Watches Established.Revised Completion Date of 831016 Established for Penetrations Not Restored + (ML20076L874)
- AECM-83-0551, First Interim Part 21 Rept PRD-83/12 Re Failure of Agastat GP Series Relays to Switch.Initially Reported on 830902. Malfunctioning Relays Sent to GE for Evaluation. Applicability to Unit 2 Under Review.Final Rept by 831107 + (ML20076L877)
- 05000324/LER-1983-050-03, /03L-0:on 830809,instrument Isolation Valves to Signal Transmitters of RHR Sys Flow Indicator 2-E11-FI-3338 & RHR Head Spray Flow Indicator 2-E11-FI-3339 Inadvertently Closed.Caused by Personnel Error + (ML20076L886)
- AECM-83-0545, Updated RO 83-025/1:on 830322,fire-rated Penetrations Opened to Implement Design Change Packages.Hourly Fire Watches Established.Work Tasks to Be Completed by 831015 + (ML20076L891)
- 2CAN098306, Forwards Responses to NRC 830809 Questions Re 830415 & 0504 Submittals Concerning Proposed Inadequate Core Cooling Instrumentation Sys.Complete Responses to Certain Questions Will Require Addl Progress in Design & Confirmatory Testing + (ML20076L898)
- BSEP-83-3042, RO I-83-01:on 830811,HPCI Sys Declared Inoperable Due to Problems Found During Operability Test.Ler Will Be Submitted by 830930 + (ML20076L919)
- BECO-83-239, Monthly Operating Rept for Aug 1983 + (ML20076L923)
- ML20076L925 + (ML20076L925)
- ML20076L927 + (ML20076L927)
- ML20076L991 + (ML20076L991)
- ML20076M010 + (ML20076M010)
- ML20076M015 + (ML20076M015)
- ML20076M029 + (ML20076M029)
- ML20076M040 + (ML20076M040)
- ML20076M048 + (ML20076M048)
- ML20076M053 + (ML20076M053)
- ML20076M055 + (ML20076M055)
- ML20076M059 + (ML20076M059)