o 8309190142 R30907 PIM4 ADOCK 05CH)O264 RATING DATA REPORT R
PINT DOCKET NO. 50-266 DATE september 7, 1983 COMPLETED BY C. W. FAY I
TELEPHONE 414 277 2811 j
OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES 2.- REPORTING PERIOD:
AUGUST 1983
- 3. LICENSED THERMAL POWER (MWT): 1518.
- 4. NAMEPLATE RATING (GROSS MWE):
523.8 I
- 5. DESIGN ELECTRICAL RATING (NETfMWE): 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
~7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, DIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
390.0
- 10. REASONS FOR RESTRICTIONS, (IF ANY): Power level restricted because of self-imposed hot leg limitation in an attempt to limit steam generator tube corrosion.
THIS NONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,831 112,367
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,782.6 93,354.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.4 625.4
{
- 14. HOURS GENERATOR ON LINE 744.0 5,775.9 90,884.2 1
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 793.5 j
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 866,073 6,742,087 122,691,076
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 282,420 2,240,730 41,116,520
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 266,680 2,121,119 39,102,837
- 19. UNIT SERVICE FACTOR 100.0 99.1 80.9 20._ UNIT AVAILABILITY FACTOR 100.0 99.1 81.6 1
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
-72.4 73.5 71.2
- 22. UNIT CAPACITY FACTOR (USING DER NET) 72.1 73.2 70.0
- 23. UNIT FORCED OUTAGE RATE 0.0 0.1 2.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Twenty-six week refueling and steam generator replacement outage scheduled
]
to commence September 30, 1983.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN i'
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 1
~.
+
3 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE g
Docket No.
50-266 Unit Name Point Beach Unit 1 Date-September 7,.1983
- Completed-By C. W. Fay
- Telephone 414/277-2811 i
Unit 1 operated at-approximately 363 MWe net throughout-F
.the period with.no significant load reductions.
This is less than last month's_ average generation due to condenser high inlet temperatures.
The primary-to-secondary leakage remains stable at less than 10 gallons per day.
On August 2, 1983, at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, containment isolation valve 1CV-3200C failed to shut during a monthly surveillance-test.
A 14-day Licensee Event Report has been filed.
I j
I i
+
e i
r"-
e
- g-yw g-y---
9
--y,
w-'<gbo
+-eyv+
e-et-y
,+w y
yew-y g,,y9.,w,,1mgewe-tywe 4
-m
,++-7se--+-e-+gres y
m-m-wp'-y+**se e-w-
qr + t
-e-+
+-ww -e - w r-w
i DOCKET NO.
50-266
~
i UNIT NAME Point Beach Unit-1 DATE September 7, 1983 COMPLETED BY C. W. Fay i
j TELEPHONE 414/277-2811 f
AVERAGE DAILY UNIT POWER LEVEL
- I MONTH August, 1983 i
I AVERAGE AVERAGE AVERAGE 4
!I DAILY DAILY DAILY l
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET I
l 1
366 11 363 21 361
!l 2
365 12 363 22' 361 i
I 3
369 13 353 23 360
- i 1
4 367 14 325 24 359 S
363 15 365 25 360 6
362 16 368 26 362 7
308 17 369 27 358 l
8 362 18 365 28 316 i
9 361 19 367 29 363 I
10 360 20 366 30 363 31 361 i
i l ! AD-28A l(1-77)
C0 HI l N Z
M co O
co tz w
H O
\\
.. N.
W Cn rt O
CA N OO OM OO
- o. O 1
e c.
Type H
C Duration (Hours)
N i
= 0 N to O O tn > m Reason i I I I I I I I O j
W O O > 0 :o :c 3 tu m i
et t o 'O (D (D W.c O y (D E (D Q Hi P c D Method Of Cg a) M P M c c U P-b M W D W H (D ct 'a "
Shutting 3 H
m 8
rtPetW HO E DOwn Reactor O
~ P in O tt P-D (D 00 tn (D O rt M O D W D
'-]
=
XDM M Q D rt L-4 C
O W W 8 6<
O P-3 8
P' H et M O 'G O
O O
W Fa-W ld W
lc (D Z
O P tn < P. O O P-(D D 8
K D M (D D to MH
'O rn
=
Z wM P rt C
OO tn O
DM 8M M (D M
Q P-0 (D tt O
to tu Z
e rt rt e Z<
c o
CD P-(D OO Q
X td O X
3 c
'd
'O PD
'O rt m
O H
O H
ct g
W O
N tu P-3 F*-
0 D
rn U
System H
Code 4
~
~
tn w
C X
C D
O 3
CompOngnt d
Code y
en AWNH3 I I I I (D rt O
O > 3 3 D' D
rt c W W O 8c D' rt 3 3 C.
O rn (D O c c a (D
MBWW
'O mHH MW O
- rt OD 8O O P In
< Q.
tt 3 0
XOO O
t* '0 CO
'O M
DO td t-*
ZO H in W tt O
'o CG HM WOE M
=8 8 CU PM lc M n rd 8
3W (D (D ZOOZ
- B OO M
>>Z c rt tn 8 3 O ui A
M P.
'< tu tu. -
M<
to td
- Cn W tt td O (D A O Cn to vi OX Z D' rt P X D
w (D
O o c D'.
C O P O D' O>
b D
P.
I D O 3 P-(D 0
% E ct D N
g (ft D fn D' MP O O' et N
PJ (D
ft Ch O P*
O in H
Q 4
o rt i
O Mi et O
w 't & tc o Hi m O 3
I W D (D
H HO MQ NN M W Ch M C I
cc O
H W 'C H H
M W CD w t< et M D p
W tn W (D in C
B l0 tu 'm M O ft H
D (D
e H-NDMc to rt P-et iO W
HM i
P' O 64
OPERATING DATA REPORT DOCKET NO. 50-301 DATE September 7, 1983 i
COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES
- 2. REPORTING PERIOD:
AUGUST 1983
- 3. LICENSED THERMAL POWER (MUT): 1518.
- 4. NAMEPLATE RATING (GROSS MUE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MUE): 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET NWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (1F ANY): NOT APPLICABLE THIS NONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,831 97,152
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.2 3,444.6 85,502.7
- 13. REACTOR RESERVE SHUTDOWN HUURS 0.3 1.5 198.3
- 14. HOURS GENERATOR ON LINE 713.5 3,324.3 83,979.5
- 15. UNIT RESERVE SHUTDOHN HOURS 0.0 1.5 182.7
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,075,582 4,966,781 116,482,375
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 360,540 1,667,590 39,468,990
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 343,858 1,586,457 37,575.424
- 19. UNIT SERVICE FACTlR 95.9 57.0 86.4
- 20. UNIT AVAILABILITY FACTOR 95.9 57.0 86.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 93.4 55.0 78.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.0 54.7 77.8
- 23. UNIT FORCED OUTAGE RATE 4.1 0.9 1.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
O NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-301 Unit Name Point Beach Unit 2 Date September 7, 1983 Completed By C. W. Fay Telephone 414/277-2811 Unit 2' operated at approximately 483 MWe net throughout the period with one significant load reduction.
On August 3, 1983, the unit tripped due to a valve failure in the "A" RTD bypass manifold.
This resulted in an overpower AT condition being sensed by instrumentation.
After repairs to the valve were complete, the unit came back on line August 5, 1983, and was at fidl power at 0906 hours0.0105 days <br />0.252 hours <br />0.0015 weeks <br />3.44733e-4 months <br /> the same day.
The average gener-ation was less than last month's due to condenser high inlet temperatures.
On August 17, 1983, inservice testing of the "B" residual heat removal pump showed excessive vibration in the pump.
The plant was placed in a 24-hour limiting condition for operation while maintenance was performed.
A 30-day report will be sub-mitted.
L
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE September 7, 1983 COMPLETED BY C. W.
Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1983 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
487 11 485 21 484 2
487 12 484 22 484 3
395 13 468 23 484 4
-9 14 486 24 482 5
372 15
'489 25 483 6
483 16 491 26 484 7
485 17 490 27 485 8
485 18 489 28 483 483 9
483 19 491 29 10 482 20 489 30 485 481 31 AD-28A (1-77)
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKE'I NO.
50-301 UNIT NAME Point Beach Unit 2 REPORT MONTII August, 1983-DATE September 7, 1983 J
COMPLETED BY C.
W.
Fay TELEPIIONE 414/277-2811 m
k c
M 0% o D
on n
oce Gw c
-1 c) c 4o eo en e
vu o
ro v e o ro co No.
Date g
g g' y
jyy Licensee Event y
o'g Cause and Corrective Action e
am o
a sc Report No.
m so To Prevent Recurrence Q-p:
e u) c o
2:
O OO
}
3 830803 F
30.5 A
3 N/A CB VALVEX Tripped on overpower AT due to the "A" cold leg RTD manifold isolation valve failed shut.
Valve bonnet was replaced.
~
i 7-F: Forced 3
4 Reason:
Method:
Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) l-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam F-Administrative 5 Exhibit I-Same
- AD-28B G-Operational Error (explain)
Source (01-78)
II-Other (explain)
Wisconsin Electnc roara couraur 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 September 13, 1983 Director of Regulatory Operations U.
S.
NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 Gentlemen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of August 1983.
Very truly yours,
\\
Vice Preside
-Nuclear Power C. W.
Fay Attachments Copies to J.
G.
Keppler - NRC, Region III NRC Resident Inspector C.
F.
Riederer - PSCW
//
.