Responds to NRC Re Violations Noted in IE Insp Repts 50-321/83-20 & 50-366/83-20.Corrective Actions:Cables Will Be color-coded,walkdown of nonsafety-related Cables & Trays Will Be Performed & Personnel Counseled
ML20076L834
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/31/1983
From: Causey J
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20076L818 List:
References
NED-83-456, NUDOCS 8309190093
Download: ML20076L834 (2)


Text

Georg a Power Company 333 Piedmont Avenue Atlanta, Georgia 30308 Toiephone 404 52&7895 k

"An Masng Acdress:

A T L A ' 'r -' ' * ' # W*

Post off;ce Bon 4545 a

Attanta, G;org:a 30302 Georgia Power 83 MG 31 P 2

  • 55

'* * *#" ** S'S'**

J. c. cauwy Vice President NED-83-456 Foss 1 and Hydro Generahcn August 31, 1983 U. S. Nuclear Regulatory Comnission

REFERENCE:

Office of Inspection and Enforcement RII: JPO Region II - Suite 2900 Inspection Reports

.~.01 Marietta Street, IM 50-321/83-20 Atlanta, Georgia 30303 50-366/83-20 A'ITENTION: Mr. James P. O'Reilly GENTLEMEN:

Georgia Power Company subnits the following information in response to Inspection Reports 50-321/83-20 and 50-366/83-20, concerning the inspection of June 21 through July 20, 1983. One violation was identified.

VIOLATION:

10GR50, Appendix B, Criterion V, as implemented by the Hatch Unit 2 FSAR, paragraph 17.2.5 requires that activities affecting quality shall be accouplished in accordance with documented instructions, procedures, or drawings.

Additionally, Hatch Unit 2 FSAR, paragraph 8.3.1.5 and Hatch Unit 2 procedure HNP-6921 require that electrical cables be color coded at approximately 10-foot intervals.

Contrary to the above, procedures were not follcwed in that several

. cables located in west cableway trays, numbers ESS-I 2MB5297 and 8, and ESS-I 2ABA7-01 were not color coded.

This is a Severity Level V Violation (Supp.

I.E.)

(This violation applies to Unit 2 only).

RESPONSE

Admission or denial of alleged violation: The violation occurred.

Reason for violation:

The violation occurred due to personnel failing to follow the plant procedure for cable installations HNP-6921, which requires cable to be color coded at specific intervals.

Corrective steps that have been taken and results achieved:

Upon notification of the occurrence, the Quality Control Department identified the cables in question and conducted a document search to determine the origin of the installation.

It was determined that HNP-6921 was not being complied with for non-safety related cable pulls.

At this time a deviation report was written for failure to follow plant procedures. A nonconformance report was also generated and subnitted to the Plant Review Board.

8309190093 830906 PDR ADOCK 05000321 G

PDR

Georgia Power d U. S. Nuclear Regulatory Conunission Office of Inspection and Enforcement Region II - Suite 2900 August 31, 1983 Page Two RESPOtEE (Continued)

Corrective steps that will be taken to avoid further violations:

The identified cables will be color coded. A walkdown of non-safety related cables and cable trays installed after August 23, 1982 by non-safety related Design Change Requests will be performed.

Prior to this date, all non-safety related cable pulls were verified by Quality Control.

Personnel involved in color coding cables have been counseled in the requirements of HNP-34 by means of Departmental Directive.

HNP-34 is the plant procedure for verbatim procedure compliance.

Date when full coupliance will be achieved:

Walkdown of non-safety related cables and cable trays installed on non-safety related DCR's and correction of any problems associated with color coding will be conplete by January 1, 1984.

J. C. Causey states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Conpany, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEORGIA POWER COMPANY ByAs M/

sworntond.subscribedbeforemethis31std(ayofAugust,198 f.}C.Causey

~

. >/

Notary Public, Georgia, State at Large 4

i p,'

M//f My Commission Empires Sept. 20,1983 l

Notary Public REB /mb Enclosure xc:

H. C. Nix, Jr.