ML20076L749
| ML20076L749 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/08/1983 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20076L753 | List: |
| References | |
| NUDOCS 8309190066 | |
| Download: ML20076L749 (1) | |
Text
__ _
, = Melung Address e_
2 Alabama Power Company
+-
800 North 18th Street Post Offic] Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Cisyton, Jr.
%2's*Tia"s*"'
AlabamaPbwer the southern electrC System September 8,1983 Docket No. 348 Docket No. 364 m
U. S. Nuclear Regulatory Commission G
Office of Inspection and Enforcement Region II N
101 Marietta Street, N.W.
3 Suite 3100 Atlanta, Georgia 30303 k
Dear Sir:
N Joseph M. Farley Nuclear Plant Unit 1 Licensee Event Report No.
LER 83-046/03L-0 and Unit 2 Licensee Event Report No. LER 83-033/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written nottfication of the occurrences.
If-you have any questions, please advise.
Yours very tri
- g. L. Clayton, J r.
FLCJ r/KWM:nac Enclosures xc: Director, IE- (30 copies)
Director, MIPC (3 copies)
OFlilc1AL COPY 8309190066 830908 PDRADOCK05000g
[gy K.
S
-