BECO-83-239, Monthly Operating Rept for Aug 1983

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1983
ML20076L923
Person / Time
Site: Pilgrim
Issue date: 09/13/1983
From: Harrington W, Whitney G
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BECO-83-239, NUDOCS 8309190140
Download: ML20076L923 (7)


Text

-

=

OPERATING DATA REPORT

~

DOCKET NO.

50-293 DATE 9/13/83_

COMPLETED BY G.C.Wh' tney TELEPHONE (617)746-7900 OPERATING STATUS

~

I. Unit Name:

Pilarim I Notes

2. Reporting Period:

August 1983 l990

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

678

' 5. Design Electrical Rating (Net MWe):

655 0

6. Maximum Dependable Capacity (Gross MWe):

i

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report Give Reasons:

NONE i

9. Power Level To Which Restricted,If Any (Net MWe):

NONE

~

10. Reasons For Restrictions,If Any:

N/A

'Iltis Month Yr..to.Dete Cumulative i

{

II. Hours In Reporting Period 744.0 5831.0 94031.0

12. Number Of Hours Reactor Was Critical 692.4 5468.4 67413.7
13. Reactar Reserve Shutdown Hours 0.0 0.0 0.0 675.5 5376.5 65255.7
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1212792.0 10265016.0 112978608.0
17. Gross Electrical Energy Generated (MWH) 430730.0 3565930.0 37892754.0 i

l

18. Net Electrical Energy Generated (MWH) 414184.0 3430679.0 36412190.0
19. Unit Service Factor 90.8 92.2 69.4
20. Unit Availability Factor 90.8 92.2 69.4
21. Unit Capacity Factor (Using MDC Net) 83.1 87.8 57.8
22. Unit Capacity Factor (Using DER Net) 85.0 89.8 59.1
23. Unit Forced Outage Rate 9.2 6.1 9.5
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refuel outaae to commence December 10. 1983.

25. If Shut Down At End Of Report Period. Estimated Date of 5 2rtup:

Unit operatino 26.' Units In Test Status (Prior to Commercial Operation):

Forecast Achieved I,

INITIAL CRITICALITY INITIAL ELECTRICITY I

COMMERCIAL OPERATION f$$ocA*Oj$8;Q PD (9/77)

t 50-293 l

DOCKET NO.

UNITSilUMPOWNS ANilPOWER REDUCTIONS UNIT NAME Pil5 rim I DATE 9/11/83~

l AUGUST 1983 COMPLETED gy G.G. Whitney REPORTIWONHI TELEPHONE (617)746-7900 l

q

~

~

=

E"L

.! E 3

) =E ~g Licensr e E*

Causc a C nsective

~, oc Event Ei b

~

N"-

Ih8' k

j$

N Acthm to fu

'~

oiE Et jdig Report #

,#0 Prevent Recur ence 6

11 83/07/29 F

43.0 A

3 83-44/3L-0 '

CE VALVEX RCIC M0-1301-16 Valve would not close.

l Drywell entry required to fix motor operator.

i 12 83/08/10 F

25.5 A

3 N/A IA INSTRU Inadvertent low water scram during l

surveillance test.

l t

13 83/08/27 S

0.0 B

5 N/A

,HC HTEXCH Main condenser backwash f

k k

1 2

3 4

l F: Forced Reason:

Method:

Exhibit G. instnecthms S: Scheduled A-Equipment Fallwe(Empi In) 1-Manuel ro Peepsenthm of Data B-Maintenance of Test 2 Manual Scism.

Entry Sheets for I.lcensee C-Refueling 3 Automatic Sessm.

Event Repnet (LER) File INURi~G,

D Regulatney Restilethm 4 0ther (Emplain) 0161)

E-Operator Training & License Examinsthm l'

F. Administrative 5

l G4hwestional lintus (Emplain)

Exhibit I - Same Source 1

~

  • 19/77)

Il Other (Emplain)

AVERAGE DAII.Y UNIT POWER LEVEL DOCKETNO. _50-293 i

Pilgrim I UNIT 9/13/83 DATE COMPL.5.7ED BY G.G.Whitnev (617)746-7900 TELEPHONE MONTH AUGUST 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MW'-N*t)

(MWwNet) 0.

647.

f I

17 I

2 41 -

Ia 645.

638 412 j,

3 609.

604.

3 4

645.

646.

m l

5 661.

gqq, 6

656 659.

23 661.

f 656 g

654.

t 661.

25 10 248.

26 653 l 91-361.

11

7 654 558.

3 g:

535.

650.

l 13 2,

655.

647, 14 3

655-31 650.

15 16 649 d

,l*

INSTRUCTIONS On this format.!ist the average dasy unit power level in MWe. Net for each day in the reporuni month. Compute to the nearest whole mepwatt.

4 67) 0

PILGRIM NUCLEAR POWER STATION Month AUGUST 1983 MAJOR SAFETY RELATED MAINTENANCE CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED LER iain Stcam MSIV 203-1A Leak (packing)

Normal use Adjust Packing Normal outage task N/A Valve Main Stram MSIV 203-1B Leak (packing)

Normal use Adjust packing Normal outage task N/A Valve Kain Stram MSIV 203-2C Packing leak Normal use Adjust packing Normal outage task N/A CRD 46-35 Accumu-Leaking seals Nomal use Rebuilt None. Routine maintenance N/A lator CRD 02-35 Accumu-Faulty Accumu-Normal use Replaced None. Routine maintenance N/A lator lator CRD

'A' CRD oil Bearing running Bearing Inspected None. Routine PM maintenance N/A cooler warm Wear Main Steam MSIV 203-1C Packing leak Normal use Adjust packing Normal outage task N/A RWCU M0-1201-85 vlv Leak (Body / Bonnet)

Normal use Reinject with Replace gasket and/or repair N/A Furmanite valve (planned)

RCIC 1301-16 Worm Gear Defective Replaced gear See LER 83-46/03L-0 Spring Pack ECIC A01301-32 Packing leak Normal use Adjusted packing None. Routine maintenance N/A

?RD DR 10-31 Seal leakage Unknown Disamed Replace / Repair during R.F.0 83-46/03L-0 Solenoids Fira Dire Door #162 Latch out of Normal use Adjusted None. Routine maintenance N/A adjustment Fira Fire Door #145 Broken Hinge Normal use Replace w/new None. Routine maintenance N/A hinge I&C.

l

'A' IRM Failed Detector Normal use Change detector None. Routine maintenance N/A

BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION DOCKET N0. 50-293 Operational Surmary for August 1983 The month started with a continuation of the outage to repair the M0-1301-16 RCIC valve (Ref. LER 83-44/03L-0. The unit was started up on 8/2/83 with a return to full power on 8/3. On the same day, the reactor building and turbine building closed cooling water heat exchanger were backwashed.

On 8/4 power was reduced for a rod pattern change with a return to full power on the morning of 8/5. Also on 8/5, control rod 10-31 was electrically disarmed because of continuing direction control problems (Ref.: LER 83-046/03L-0).

The unit remained at 100% power until 8/10 when the unit scrammed during a high risk surveillance test because of a false low water level signal.

During the startup, salt buildup on the switchyard insulators was washed off and condenser backwashing was required because of an ocean storm.

On 8/13 full power was attained and remained at that level until 8/26 when power was reduced to approximately 50% for condenser backwash and scheduled maintenance. On 8/27 the unit was returned to full power and remained at full load thru the end of the month.

SAFETY / RELIEF VALVE CHALLENGES MONTH OF AUGUST 1983 l

REQUIREMENT:

T.M.I.

T.A.P.

II.K.3.3 REASON:

No Safety / Relief Valve Challenges occurred during the month of August 1983.

l l

l l

l l

4 REFUELING INFORIMTIO!i The following refueling information is included in the Monthly Report as requested in an NRC letter to BECo. dated January 18, 1978.

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1.

The name of this facility is Pilgrim Nuclear Power Station, Docket No. 50-293.

A 2.

Scheduled date for next Refueling Shutdown: December 1983 3.

Scheduled date for restart following refueling: April 1984 4.

5.

Due to their similarity, requests 4, 5 & 6 are responded to collectively.

6.

The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8X8R design, as loaded the previous outage consisting of 112 P8DRB282 assemblies, and 60 P80RB265 assemblies.

7.

(a) There are 580 fuel assemblies in the core.

(b) There are 936 fuel assemblies in the spent fuel pool.

l-8.

(a) The station is presently licensed to store 2320 spent fuel assemblies. The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

l 9.

With present spent fuel in storage, the spent fuel pool now has the l

capacity to accomodate an additional 834 fuel assemblies.

l

=

e 1

6 BOSTON EDISON COMPANY 800 BoyLsTON STREET BOSTON MASSACHUSETTS 02199 WILLIAM D. HARRINGTON einsen wees amasseauv September 13, 1983 BEco. #83-239 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Docket No. 50-293 License DPR-35

Subject:

August 1983 Monthly Report

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and planning.

Respectful,1y submitted, William D. Harrington WDH/mg Attachment cc: Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 U.S. Nuclear Regulatory Coninission Document Control Desk Washington, D.C.