ML20076L797
| ML20076L797 | |
| Person / Time | |
|---|---|
| Site: | North Anna, Midland |
| Issue date: | 09/08/1983 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20076L791 | List: |
| References | |
| CSC-6869, NUDOCS 8309190083 | |
| Download: ML20076L797 (5) | |
Text
.
Consumers Power Presid
- Projects, Engineering and Construction General Offices: 1945 West Pernell Road, Jackson, MI 49201. (517) 788-0453 September 8, 1983 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER INSPECTION REPORT NO 50-329/83-11(OSC) AND 50-330/83-11(OSC)
File:
0.4.2 UFI:
70*01 Serial: CSC-6869 0485.16 42*05*22*04
REFERENCE:
(1) R F Warnick letter to J W Cook, dated August 4,1983 Inspection Report No 50-329/83-11(OSC) and 50-330/83-11 (OSC)
This letter, including Attachment 1, provides our response to Reference 1, which transmitted the subject Inspection Report and requested our written response to the item of noncompliance therein.
JWC/ BHP /dmh Attachment cc: RFWarnick, NRC Region III 8309190083 830914 JJHarrison, NRC Region III PDR ADOCK 05000329 RNGardner, NRC Region III G
PDR RBLandsman, NRC Region III PJCook, NRC ~ Senior Resident Inspector, Midland Site RLBurgess -NRC Resident Inspector, Midland Site SEP 121983 NOV0783-0001A-CN02
L 1
Consumers Power James W Cook Vice President - Projects, Engineering and Construction General offices: 1945 West PernaH Road, Jack,on, MI 49201 * (517) 788-0453 September 8, 1983 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER INSPECTION REPORT NO 50-329/83-11(OSC) AND 50-330/83-11(OSC)
File:
0.4.2 UFI:
70*01 Serial: CSC-6869 0485.16 42*05*22*04
REFERENCE:
(1) R F Warnick letter to J W Cook, dated August 4, 1983 Inspection Report No 50-329/83-11(OSC) and 50-330/83-11 (OSC)
This letter, including Attachment 1, provides our response to Reference 1, which transmitted the subject Inspection Report'and requested our written response to the item of noncompliance therein.
m M. M JWC/ BHP /dmh Attachment cc: RFWarnick, NRC Region III 8309190083 830914 JJHarrison, NRC Region III PDR ADOCK 05000329 RNGardner, NRC Region III G
PDR RBLandsman, NRC Region III RJCook, NRC Senior Resident Inspector, Midland Site RLBurgess, NRC Resident Inspector, Midland Site SEP 121983 NOV0783-0001A-CN02
2.
Corrective Action-to be Taken to Avoid Further Noncompliance:
Dedicated crews of craftsmen were established July 20, 1983, to maintain
.the laydown area in accordance with the requirements of FPG 4.000.
Additional supervision has been added at the Poseyville laydown area to.
direct the crews and implement access control for entrance into the laydown area.
3.
The Date When Full Compliance Will be Achieved:
Full compliance has been achieved.
All the items identified in the Notice of Violation were placed on dunnage June 21, 1983. The unistrut pieces were subsequently moved to the scrap area for salvage on July 23, 1983.
The manning of the dedicated crews and additional supervision have been completed and are' presently functioning.
NOV0783-0001A-CN02
Serial: CSC-6869 CONSUMERS POWER COMPANY'S RESPONSE TO US NUCLEAR REGULATORY COMMISSION, REGION III INSPECTION REPORT NO 50-329/83-11(OSC) & 50-330/83-11(OSC)
Appendix (Notice of Violation) to Inspection Report No. 50-329/83-11(OSC) and-50-33?/i3-11(OSC) provides one item of noncompliance to 10 CFR 50, Appendix B.
The NRC statement and our responses are given below:
NRC STATEMENT 10 CFR 50, Appendix B, Criterion V states, in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, or a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."
CPC-1-A Policy 13, Handling, Storage, and Shipping; Section 3.3, RECEIPT AND STORAGE, states, in part, " Suppliers provide plans,
., procedures and personnel to... store,
.. items upon arrival at the site."
Bechtel Power Corporation field Procedure FPG 4.000, Revision 10, Storage -
Maintenance / Inspection of Equipment and Materials, states in part in Section 6.2.4 " Items shall be stored on dunnage or cribbing to allow for air cir-culation and to minimize the trapping of water."
' Contrary to the above,-structural items stored in various areas of the Poseyville Road laydown area were not stored on dunnage or cribbing to allow for air circulation and to minimize the trapping of water as required by Bechtel Field Procedure FPG 4.000, Revision 10.
This is a Severity Level V violation (Supplement II).
CONSUMERS POWER COMPANY RESPONSE In accordance with this Notice of Violation, an explanation of corrective action is as follows:
1.
Corrective Action Taken and the Results Achieved:
As clarification to the item of' noncompliance the structural I-beam identified.in your report was intended for use as a pipe storage rack
~
and was a spare setting alongside others being used as such.
Work orders for placing on dunnage the stock steel and unistrut pieces welded to base plates were issued June 20, 1983, and June 7, 1983, respec-tively. The work was completed June 21, 1983, and verified by CPCo.
NOV0783-0001A-CN02
CONSUMERS POWER COMPANY Midland Units 1 and 2 Docket No 50-329/50-330 Letter Serial CSC-Dated September 8, 1983 At the request of the Commission and pursuant to the Atomic Energy Act of 1954, and the Energy Reorganization Act of 1974, as amended and the Commission's Rules and Regulations thereunder, Consumers Power Company submits the response to R F Warnick letter to J W Cook dated August 4, 1983.
CONSUMERS POWER COMPANY By J/ Cook, Vice President ProjecW, Engineering and Construction
/
Sworn and subscribed before me this J
day of. odic /w,1983.
f
+!m.-e t/
m< a s, Notary Public
/
My Commission Expires s ;
30 8,/9/
- g a.
e
.NOV0783-0001A-CN02
c l
l OL/0M SERVICE LIST Mr Charles Bechhoefer, Esq
.Mr Frank J Kelley, Esq Administrative < Judge-
. Attorney General of the
' Atomic Safety &' Licensing Board Panel
. State of Michigan US Nuclear Regulatory Commission:
Mr Stewart H Freeman, Esq Washington, DC 20555-Assistant Attorney General.
Environmental Protection Div -
720 Law Building Lansing, MI 48913
~Dr Frederick P Cowan Mr Myron M Cherry, Esq Administrative Judge Cherry & Flynn 4
6152 N Verde Trail
-3 First National Plaza Apt B-125 Suite 3700 Boca Raton,-FL 33433 Chicago, IL '60602
-Mr Michael Miller, Esq Mr Wendell H Marshall Isham, Lincoln & Beale
'RFD 10
-3 First National Plaza Midland, MI 48640 Suite 5200-Chicago,'IL 60602 Mr D F Judd, Sr Project Manager Mr John Demeester The Babcock & Wilcox Company Dow Chemical Building P.0 Box 1260 Michigan Division Lynchburg, Va 24505 Midland, MI 48640 Atomic Safety & Licensing Board Panel Ms Mary Sinclair U.S Nuclear Regulatory Commission ~
5711. Summerset Street -
Washington DC 20555
. Midland, MI' 48640 Atomic. Safety & Licensing Appeal Board-Mr Steve Gadler U S Nuclear Regulatory Commission 2120 Carter Avenue Washington,' DC 20555 St Paul, MN 55108 i-Mr William D Paton, Esq Mr Lee L Bishop Counsel for NRC Staff ~
Harmon & Weiss-
[:
US Nuclear Regulatory Commission 1725 I Street, NW #506 Washington, DC 20555.
Washington, DC 20006
.Ms Barbara Stamiris Mr C R Stephens N
5795 North River. Road Docketing and' Service Station 1 i
Route'3:
Office.of the Secretary?
j.
Freeland,'MI 48623 US Nuclear Regulatory' r
Washington, DC. 20555..
l Dr Jerry. Harbour-Lynn Bernabei
_US Nuclear Regulatory Commission Governmental Accountability-
, ~
. Atomic Safety & Licensing Board Panel Project (GAP) t i-
-Washington, DC ;20555 1901 Q. Street NW l
Washington, DC 20009 il-
'NOV0783-0001A-CN02
,=. -. -
-.- ----