Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20055G546 + (ML20055G546)
- ML20055G548 + (ML20055G548)
- ML20055G553 + (ML20055G553)
- ML20055G555 + (ML20055G555)
- ML20055G556 + (ML20055G556)
- ML20055G557 + (ML20055G557)
- 0CAN079006, Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance + (ML20055G559)
- ML20055G561 + (ML20055G561)
- 05000266/LER-1990-006, :on 900619,nuclear Instrumentation Turbine Runback Occurred.Caused by Spurious Signal Believed to Have Been Negative Spike.Voltage Spike Considered Spurious + (ML20055G564)
- ML20055G565 + (ML20055G565)
- ML20055G568 + (ML20055G568)
- ML20055G569 + (ML20055G569)
- ML20055G570 + (ML20055G570)
- ML20055G571 + (ML20055G571)
- PY-CEI-NRR-1205, Forwards LERs 90-014-00 & 90-015-00 for Plant + (ML20055G572)
- ML20055G574 + (ML20055G574)
- 05000440/LER-1990-014, :on 900621,trains of Control Room HVAC Sys Actuated Unexpectedly in Emergency Recirculation Mode of Operation.Caused by Multiple Personnel Errors.Personnel Reinstructed Re Using Appropriate Drawings for Application + (ML20055G575)
- ML20055G577 + (ML20055G577)
- ML20055G578 + (ML20055G578)
- ML20055G582 + (ML20055G582)
- ML20055G583 + (ML20055G583)
- ML20055G586 + (ML20055G586)
- ML20055G591 + (ML20055G591)
- ML20055G592 + (ML20055G592)
- ML20055G593 + (ML20055G593)
- ML20055G595 + (ML20055G595)
- ML20055G597 + (ML20055G597)
- ML20055G599 + (ML20055G599)
- ML20055G600 + (ML20055G600)
- IR 05000309/1990010 + (ML20055G601)
- ML20055G602 + (ML20055G602)
- 05000278/LER-1990-007-03, :on 900620,RWCU Isolated While Pressurizing Sys Following Isolation Valve Insp.Caused by Design Weakness. Design of Instrumentation Reviewed & Procedural Controls Enhanced + (ML20055G606)
- ML20055G608 + (ML20055G608)
- ML20055G610 + (ML20055G610)
- 05000311/LER-1990-027, :on 900628,determined That ESF Signal Actuation 2R41C Channel Failed Low Due to 2R45 Interlock.Caused by Design/Equipment Concerns.Engineering Investigated Concerns & Uninterruptable Power Sys Installed + (ML20055G611)
- ML20055G612 + (ML20055G612)
- B13571, Clarifies 900625 Tech Spec Change Request Re Limit of 160 Failed Fuel Rods for Cycle 16 Operation + (ML20055G613)
- ML20055G614 + (ML20055G614)
- ML20055G617 + (ML20055G617)
- IR 05000313/1990022 + (ML20055G620)
- ML20055G622 + (ML20055G622)
- ML20055G624 + (ML20055G624)
- ML20055G625 + (ML20055G625)
- NG-90-1741, Discusses Collateral Operator Duties for Reactor Operators Restricted from Performing Licensed Activities.Individuals Will Perform in Support Role Until Such Time as Remedial Training & Followup Testing Completed to Restore License + (ML20055G630)
- ML20055G631 + (ML20055G631)
- ML20055G633 + (ML20055G633)
- IR 05000344/1990016 + (ML20055G634)
- ML20055G635 + (ML20055G635)
- ML20055G639 + (ML20055G639)
- HBL-90-036, Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21) + (ML20055G642)
- ML20055G644 + (ML20055G644)