Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18059A518 + (ML18059A518)
- ML18059A519 + (ML18059A519)
- 05000255/LER-1993-009, :on 930916,identified Pressurizer Penetration Safe End Crack Which Resulted in PCS Leakage.Crack Initiated Due to PWSCC in HAZ of PORV Inconnel 600 Safe End. Engineering Evaluation of Failure Conducted + (ML18059A520)
- ML18059A521 + (ML18059A521)
- ML18059A522 + (ML18059A522)
- ML18059A523 + (ML18059A523)
- ML18059A526 + (ML18059A526)
- ML18059A527 + (ML18059A527)
- ML18059A528 + (ML18059A528)
- IR 05000255/1993013 + (ML18059A532)
- ML18059A533 + (ML18059A533)
- ML18059A535 + (ML18059A535)
- ML18059A536 + (ML18059A536)
- ML18059A538 + (ML18059A538)
- ML18059A539 + (ML18059A539)
- 05000255/LER-1993-008, :on 930824,V-27D Safeguards Room Cooling Fan Motor Failed to Start Due to Improper Thermal Overload Protection Design.Addl Thermal Overload Setting Changes & Breakers Changes Made + (ML18059A540)
- 05000255/LER-1993-012, :on 931103,concluded That Seismic Qualification Did Not Exist for Relays Previously Installed in Chp & Chr Circuits Due to Undersized Relay Coils.Undersized Coils in Relays Replaced + (ML18059A541)
- ML18059A542 + (ML18059A542)
- ML18059A543 + (ML18059A543)
- ML18059A544 + (ML18059A544)
- ML18059A545 + (ML18059A545)
- ML18059A546 + (ML18059A546)
- ML18059A547 + (ML18059A547)
- ML18059A548 + (ML18059A548)
- RS-18-010, Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-BeyondDesign-Basis External Events + (ML18059A553)
- ML18059A554 + (ML18059A554)
- ML18059A557 + (ML18059A557)
- ML18059A559 + (ML18059A559)
- IR 05000255/1993024 + (ML18059A561)
- ML18059A562 + (ML18059A562)
- ML18059A563 + (ML18059A563)
- ML18059A564 + (ML18059A564)
- ML18059A565 + (ML18059A565)
- ML18059A570 + (ML18059A570)
- ML18059A571 + (ML18059A571)
- ML18059A572 + (ML18059A572)
- ML18059A573 + (ML18059A573)
- ML18059A576 + (ML18059A576)
- ML18059A578 + (ML18059A578)
- ML18059A581 + (ML18059A581)
- IR 05000255/1993023 + (ML18059A583)
- ML18059A588 + (ML18059A588)
- ML18059A592 + (ML18059A592)
- ML18059A599 + (ML18059A599)
- ML18059A600 + (ML18059A600)
- ML18059A601 + (ML18059A601)
- 05000255/LER-1993-013, :on 930427,loss of Onsite Ac Power Occurred Due to Both EDGs Being Simultaneously Inoperable.Rev Will Be Submitted to Electrical Section of TS Which Will Emulate NUREG-1432, STS for C-E Plants + (ML18059A602)
- ML18059A604 + (ML18059A604)
- ML18059A614 + (ML18059A614)
- GO2-18-029, Summary of Changes for Emergency Plan Implementing Procedures + (ML18059A615)
- IR 05000255/1993029 + (ML18059A623)