ML18059A547

From kanterella
Jump to navigation Jump to search
Advises That Arrangements Made for Administration of Licensing Exams During Wk of 940314.Ref Matls Listed in Attachment 2 to ES-201 Should Be Furnished by 931220
ML18059A547
Person / Time
Site: Palisades 
Issue date: 12/02/1993
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 9312090076
Download: ML18059A547 (2)


Text

\\.

I

\\\\, J

'y Docket No. 50-255 Consumers Power Company ATTN:

Gerald B. Slade General Manager

  • Palisades Nuclear Generating PJant 27780 Blue Star Memorial Highway Covert, MI 49043

Dear Mr. Slade:

December 2, 1993 41t In a telephone conversation between Mr~ R. Heimsath, Operations Training Supervisor, and Mr. J. Lennartz, Principal Examiner, arrangements were made.*

  • for the administration of licensing examinations at the Palisades Nuclear Plant.

The written and operating examination~ are scheduled for the week of March 14, 1994.

Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revi~ion 1 of NUREG-1021, "Operator Licensing Examiner Standards," (ES-201, Attachment 4).

during the week of February 28, 1994.

To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by December 20, 1993.

Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.

In order to conduct the requested examinati9ns, it will be n.ecessary for your staff to provide adequate space and accommodations on the date noted above.

The NRC's guidelines for administ~ring the written examinations are described in ES-402, Atta~hment 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating tests, it will be* necessary for your staff to make the simulation facility available oh the dates noted above.

Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynami~ operating tests until the examination results are final.

ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

Please note that as of December 13, 1993, all reference materials should be sent to our new address; 801 Warrenville Road, Lisle, IL 60532-4351.

~-. ' '

=~* *,"

Your staff should submit preliminary reactor operator and senior reactor operator 1 i cense app 1 i cations and waiver requests at least 30 days before the - -.. * *..

first examination date so that the NRC will be able to-review the applications and the medical certifications and evaluate any requested waivers.

If.the*

9312090076 931202 lf.~

PDR ADOCK

  • 05000255t,t','

V PDR m

Consumers Power Company 2

December 2, 1993 applications are not received. at least 30 days before the examination date, a postponement may be necessary. Final, signed applica_tions certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31, 1995.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C.

20503.

Thank you for your consideration in this matter.

If you have any questions*

regarding the examination procedures and requirements, please contact Jay Lennartz at (708) 829-9721.

Sin'cerely, Original signed by. Mark A. Ring Mark A. Ring, Chief*

  • Operati~ns Branch cc:

David P. ~offman, Vice President Nuclear Operations David W. Rogers, Safety and Licensing Director OC/LFDCB Resident Inspector, Riii James R. Padgett, Michigan Public' Service Commission

Public Health SRI, Big Rock Point D. D. Hice, Plant Training Manager A. H. Hsia, P~oject Mariager, NRR R. M. Gallo, Branch Chief, OLB B.

L~- Jorgensen~ Section Chief, DRP

  • bee:

PUBLIC IE42 RI~

Le~z/cg 12/ I /93 R~

Burdick 12/ V/93

~-/

Ring 12/'l-/93

~

  • ':.i*'.

~ *

. '-~* :