consumers Power
~
.. ~
POWERING MICHIGAN'S PROGRESS Palisades Nuclear Plant:
27780 Blue Star Memorial Highway, Covert. Ml 49043 December 13, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET 50-255 - LICENSE DPR PALISADES PLANT - UPDATE TO THE PROGRAM PLAN FOR THE ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT As a follpw-up to the discovery of a number of deficiencies with the implementation of the Equipment Qualification (EQ) rule (10 CFR 50.49) for the Palisades Plant, a meeting was held at Region III offices on March 11, 1992.
At that meeting Consumers Power representatives discussed each of the deficiencies and their resolution status. At the end of the meeting we outlined a plan to review the entire Palisades EQ program and subsequently submitted the plan to you on April 30, 1992.
Along with the plan the April 30 letter contained a preliminary schedule for implementation of tbe plan actions.
Many of these EQ program plan actions have been completed, and the remainder are ongoing.
Based on our review of these ongoing activities we are informing you of the following schedule changes.
The EQ program review plan stated, in Task 3.2.2, that documentation issues raised by the contractor report on the EQ equipment list would be addressed and EQ documentation would be updated by approximately December 1, 1993.
The reviews of the contractor report have resulted in the generation of numerous Q-list interpretations to correct EQ information on the plant equipment data base.
Q-List interpretations document the quality status of a piece of equipment and the areas for which the quality of the equipment needs to be verified to substantiate its design basis function.
The results of the Q-list interpretations have been reviewed and are being entered into the data base and verified.
No equipment qualification deficiencies have been identified as a result of this effort. The revised estimate to complete the resolution of the documentation issues raised by the contractor's report is December 15, 1993.
~--_.20nos1
( 9312220006 931213
~DR ADOCK 05000255 PD~ r A CMS" ENERGY COMPANY
Nuclear Regulatory Commission Palisades Plant Update to the EQ Program Plan The EQ program ~eview plan also identified that durfng the EQ program design basis document development, information may be discovered that would lead to revisions to the EQ Master Equipment List. The schedule attached to the April 30, 1992 letter indicated that updating the EQ Master Equipment list
{Task 3.2.3) would be completed by December 1, 1993.
Since then two EQ program design basis documents have been developed; one to address room environments and one to address the equipment list. The former is completed and issued while the latter is issued for review and is scheduled to be completed by April 15, 1994 as originally scheduled.
We have determined that it would be prudent to coordinate the results of the EQ program equipment design basis effort with an additional verification of the plant Q-list. Consequently, the final EQ Master Equipment List update should then wait until the Q-list verification is completed.
The revised estimate for completion of the update to the EQ Master Equipment List is now December 15, 1994.
All of the othet activities listed in the EQ program plan have been completed or are planned for completion in accordance with the dates noted*on the April 30, 1992 preliminary schedule.
Attachment *1 contains a copy of the original and revised schedules.
X5--dz~-
Gerald B Slade General Manager CC: Administrator Region Ill, USNRC NRC Resident Inspector - Palisades 2
ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 UPDATE TO THE PROGRAM PLAN FOR THE ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT Original* and Revised Schedules December 13, 1993 2 Pages
ORIGINAL SCHEDULE Attachment l*
EEO PROGRAM PLAN Wednesday, r
4pril 2~9-,* 92 tt97 1993 A*Uwltl**
~---- -..- -*..---* --
- -*r--r--*
MJJ A&ONOJ FMAMJJ Al&ONOJ FMAMJJ ASONOJ
"'~
FMAMJJASONOJ FM AM J
JASON 0
~---~----------------------+--1--4---1-1 -i--* -~-
--!---~ -
~-.
1---- -- *- *- *- ---1--t-- --
~--------------------------+--1--4---1--1--jf-~-~-~ -t-*t---- ---
--*t-** I--
--- ~-1--- *--1--
---,__.i--
~--~
-** 1---
-- ---J--
~
-L.~1--1---
.. t-3 I OESIGH &.SIS DOCUMENT 1----------------------------+--*l--4--1--ll-1---
1_!:! --1--1---~
_.__ - -- --~ *-- *-
f--* -* ---- --
4---1--~f-I- <*-'-1-L- - -
-'------~L-------*---- _.,___ -i.----- __.._ ___ -~ -!---'--*-* *-
1-----------------------------1--4-+-I--
---"--1...-- ---
--*--t--+--+-*- --->----
- -I-- --
1----
~.= ~ - I- -- -
- f- -*
1----------------------------+--+-+=l- -
-~
~-- -- ~- -
t--
(E*PAl.-112-<137) 3.21 E~
Addod to._ Ila-lJol all* Rw I
--*--------------------+--+-+--+-*-~~ --*
-r--- -- --~I-- -- --- -- *-- --
1-- - -- *-
3 2.2 ~
ol CorW-odor Ropor1 ConmonD
l-1-+--1--4---'J'°-ll-+--l--l--+--+--+-t-*+---+--**- - -* -~ -* ****'--*-'"-- ~*-1----+-4--+-
- _1...-,.. --t--+-- *- - -- *- --- -- -**
--'.. 1--.L-L....-.. __,_ -
32.311a-Lill ~-....angltorn Tolll3.I
- *-- *--1---- --1.-
- -'---.i........ **'"-- t--
-~- -- -- ~ '- --
.L.-. i.- --
- - --t--* -*
- -t-- -
1---------------------------+--l--+~-l-l*l--~+-l--l~*l-+--l--+~---1-1---~-+-- 11-1-+--I-1--1--+-*1- --- -- ---...__ -* - -
-- l--*-1---1--4--+-1-I
-*--L..-.
~--------------------------+--+-+-l--ll-~+--+--l--11-l-+--l--+--l--1-~+--1---l---ll-1-+--l--l---l~I-~ +-+*-+-1-l---*- --
-*L-.L--L- -- -*-+-l-l-+--t-
---~*
33EEO~~
- ---- --~- --
--1.---~- -
-t-11-1-**t--t--+-l-l-+--+--+-l-I- ~-~a.-~ -
- -L-* 1--+-**l--l--I-+-* -~ -
U.1-~EOU-......~
-~-- ~-1--- -L-- ~-~- --1-+--l--+-1-1-* __...__ -- I--
l-+*+-1---1-*I---,_ -- -~
l--3-.3-.-2-0......,---....
,.,,,._.._----------------i--+-+-+~-l-+1.-1t1i'--ll-~-,,!*-l-l-l--+--l--+~-l-+--l-*-+-l-l-l-l---~-+--1--+--1--ll-+-+--+--t-jf-l---l--l---I- -
--~-
1---------------------------1-+-+-+--l--1-~-l--4---1---ll-~+-+-+-l-*,l-*+--1--l--1---1---- -
--L-- ~-1--1--1--l-~l-l--I
- ----------------------------1-1--l--l--4--t--ll-l--l-+-1---l-1-+--l-+-+--t--+- -
~ --,____ L--l---'"-* -
L--
-~-
-~* -
.-1--
1----------------------------i---l--+-l--1-1-l--+-+-l--1'-l--+-++-1--l-l-l--+-+-i--'--'--.J--1--l-+-+--t-l--l-*l-+--l--+--f-11--I- - -
- -~- --1-+--l--l---l-*-
- -~- __,....._ -
- -1----
-* f.-
--*I---
._. --t-( E*PAl*92.o31C) 3 S PERSOHNEl TRAINING
~a.-- -
1--** -
--t--
- t'--t--- *-*&..--
1---------------------------~-l--I--+-* -
-'--- -1---1--1--1--l-- --~- --1---
--*~
-l-1--+--1---1--1-1--~ --!-l-+--1--+*- !--- ---~-
. -f--- -** - *-
1----------------------------1--+-+-- -
-* -L--
- -r--
---~~- ---~---...__
__ L...-. - - ~ *- -*t-* **- -* -*- *--
-*I-- *-* --. -
1---------------------------1--1--l--+-,__,_,,__,___,__.__, ___ I--- I--- f-*1--- f-I--
1--*. L... L.._ L. -
!-----------------------------..........._ -L-- -
-*~-1.--1---
- L.- -'- -* -- -* 1----------------------------t-- ~I--- -
--1--- ~-
-*!.-- --*1---*i---1--- -
- --1--1-- *-
1----------------------------1--++-i----~.-l---1--1--1--I-~- ~ -
- - -- --~- -*
I--* --
- <-1--1--t--+-l-1-- j
--~-
-~*
_L..,~. - --i--....
1---------------------------+-+-l-~-- l.-L- ~- --~~ -
. --- ~-~ -- -
-- ~-
7*- -***-
-- -*I---- --* *-*a.--
--+-<f-.J-*l--1--4---l--11-1--1--l--1--1-'I----- -*- - *- -**
- --.. -~*--- *-*-._..
1--+--l--11-l-+--1---'--'--- L..~ ---- *- '--1--* -
-t-
... --1-- -
-* -* -* -*t-- -*
--~1---f-
~f--'-~'-- --1-+--1--1*-
-*1--- ____.__ ~- -L-
. --------*--------------------------~ *-t--1---**1--.l-
-*-t-
- ----------- -. ------------*----------+
JI ATIACHMENT1 EEQ PROGRAM PLAN REVISED SCHEDULE Dec 1, 1993 1992 1993 1994 1995 Activity Name M J J
A s 0 N D J F M A M J J
A s 0 N D J F M A M J J
A s 0 N D J F M A M J J
A s 0 N D 3.1 DESIGN BASIS DOCUMENT 3.2 EEO PROGRAM DOCUM:NTATKlN 3.2.1 Equipment Added to the Master List after Rev 1 (E-PAL-92-037)
!:!. - ~
I 3.2.2 Resolullon of Contractor Report Comments
} r7 IJ I~ -\\
~
\\.
1 3.2.3 Master list Additions/Deletions resulting from Task 3.1 I
~
)
l.,.I 3.2.4 Consolidation of Equipment Qualification Flies
- '7 3.3 EEO EOIJU'MENT MAINTENANCE 3.3.1 Review/ Update EQ Maintenance Requirements
~ ~
3.3.2 Develop New Installation Procedures 3.3.3 Incorporate EO Maintenance Requirements Into EDB 3.4 EO EQUIPMENT CONDITION MONITOFING
\\
3.5 PERSONNEL TRAINING (E-PAL-92-031 C)
~
EO CHiONi PR:>GWAMANTEtWa ACTMTES
~