Loss of Emergency Onsite Ac Power Due to Both EDGs Being Simultaneously Inoperable.Ler Submitted Greater than 30 Days from Date of Event Which Is Contrary to Requirements of 10CFR50.73(a)(1)
ML18059A599
Person / Time
Site: Palisades 
Issue date: 12/23/1993
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18059A600 List:
References
RTR-NUREG-1432 NUDOCS 9401070035
Download: ML18059A599 (1)


Text

consumers Power

,.mdjjil"" l'OWERINli MICHlliAN'S l'ROliRESS Palisades Nuclear Plant:

27780 Blue Star Memorial Highway, Covert, Ml 49043 December 23, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

GB Slade General Manager LICENSEE EVENT REPORT 93-013 - LOSS OF EMERGENCY ONSITE AC POWER DUE TO BOTH EMERGENCY DIESEL GENERATORS BEING SIMULTANEOUSLY INOPERABLE Licensee Event Report (LER)93-013 is attached. This event is reportable in accordance with 10CFRS0.73(a)(2)(i)(B) as a condition prohibited by plant technical specifications in that both emergency diesel generators were simultaneously inoperable.

This LER is submitted greater than 30 days from the date of the event which is contrary to the requirements of 10 CFR 50.73(a)(l). Our evaluation of the failure to submit a timely report is in progress.

The results of this evaluation will be provided in a separate letter. A review of other potential Licensee Event Reports over the last two years is also in progress.

Corrective actions to effectively prevent the recurrence of the failure to submit a timely LER will be established.

-~J~*~..,

Gerald B Slade 0-General Manager CC Administrator, Region Ill, USNRC NRC Resident Inspector - Palisades Attachment 9401070035 931223 PDR ADOCK 05000255 5