Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291A916 + (ML17291A916)
- GO2-95-137, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-397/95-16 on 950522-25.Corrective Actions:Documented Surveys of Dose Rates Around Barrel Performed & Series of Meetings Held & mock-up Training Conducted + (ML17291A920)
- ML17291A921 + (ML17291A921)
- GO2-95-136, Forwards Rev 22 to TR WPPSS-QA-004, Operational QA Program Description. Rev Reflects Mgt & Organizational Changes & Modifies Reporting Requirements as Listed + (ML17291A925)
- ML17291A926 + (ML17291A926)
- ML17291A927 + (ML17291A927)
- GO2-95-143, Informs That Actions Described in First Paragraph of Item I of GL 89-10,were Completed by 950628 + (ML17291A930)
- GO2-95-142, Responds to NRC Ltr Re Violations Noted Insp Rept 50-397/95-18.Corrective Actions:Counseled Individuals Involved + (ML17291A931)
- ML17291A933 + (ML17291A933)
- GO2-95-147, Forwards Response to NRC Re Violations Noted in Insp Rept 50-397/95-15.Corrective Actions:Time Out Was Held W/Workers Qualified as Fire Watch to Reinforce Expectations + (ML17291A939)
- ML17291A940 + (ML17291A940)
- ML17291A942 + (ML17291A942)
- PNO-IV-95-018A, on 950409,during Plant Preparations for Heatup & Startup Following Reactor Trip,Sro on Shift as Control Room Supervisor Operated Bypass Valve in RWCU Sys, Contrary to Procedure Caution.State of Wa Informed + (ML17291A944)
- ML17291A946 + (ML17291A946)
- GO2-95-149, Forwards Performance Enhancement Strategy 1995. Plan Developed by Independent Mgt Team in Response to mid-cycle self-assessment + (ML17291A947)
- IR 05000010/2017012 + (ML17291A949)
- ML17291A950 + (ML17291A950)
- IR 05000397/1995018 + (ML17291A951)
- GO2-95-151, Monthly Operating Rept for Jul 1995 for WNP-2 + (ML17291A952)
- ML17291A953 + (ML17291A953)
- IR 05000397/1995022 + (ML17291A955)
- IR 05000397/1995007 + (ML17291A957)
- ML17291A959 + (ML17291A959)
- ML17291A960 + (ML17291A960)
- IR 05000397/1995023 + (ML17291A962)
- ML17291A964 + (ML17291A964)
- IR 05000604/2007015 + (ML17291A966)
- ML17291A967 + (ML17291A967)
- ML17291A968 + (ML17291A968)
- GO2-95-153, Responds to Rev 1,Suppl 1 of GL 92-01, Rv Structural Integrity + (ML17291A969)
- ML17291A970 + (ML17291A970)
- IR 05000397/1995024 + (ML17291A972)
- ML17291A973 + (ML17291A973)
- ML17291A974 + (ML17291A974)
- ML17291A976 + (ML17291A976)
- GO2-95-157, Forwards Response to NRC Re Violation Noted in Insp Rept 50-397/95-19.Corrective Actions:Procedure PPM 1.3.1 Revised to Include Shift & Relief Turnover Practices,Including Checklists + (ML17291A977)
- GO2-95-156, Special Rept:On 950712,loose Part Detection Sys Channel 4 Failed Due to Electrical Noise During Daily Check.Channel 4 Will Remain Inoperable Until Next Forced or Scheduled Outage When Primary Containment de-inerted for Other Work + (ML17291A978)
- ML17291A979 + (ML17291A979)
- ML17291A980 + (ML17291A980)
- ML17291A982 + (ML17291A982)
- ML17291A984 + (ML17291A984)
- IR 05000397/1995021 + (ML17291A986)
- ML17291A987 + (ML17291A987)
- GO2-95-158, Informs of Changes to Commitments Made in Re Visual Insp & Replacement of Containment Penetration Modules + (ML17291A988)
- GO2-95-152, Forwards Revised Marked Up TS Page 3/4 4-4,incorporating Sruveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Applicable for Each Surveillance Per Conversations W/Nrc + (ML17291A989)
- ML17291A990 + (ML17291A990)
- ML17291A991 + (ML17291A991)
- GO2-95-163, Forwards Fitness for Duty Semiannual Performance Data Rept for Jan-June 1995 + (ML17291A992)
- GO2-95-160, Provides Info to Support Amend of TS 6.9.3.2 + (ML17291A994)
- IR 05000397/1995025 + (ML17291A995)
- IR 05000395/1995025 + (ML17291A997)