PRXORXTY (ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9508160160 DOC.DATE: 95/07/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 P
AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
Washington Public Power Supply System PARRISH,J.V.
Washington Public Power Supply System RECIP,.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Jul 1995 for WNP-2.W/950810 ltr.
DISTRIBUTXON CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech-Specs)
NOTES:
0 RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL:
8EZ8" FXLE CENTER RR/'DRPM/PP CB EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 10 10 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN4 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
0 U'
NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5D8 (415-2083)
TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL 20
ii WASHINGTON PUBLIC POWER SUPPLY SYSTEM F.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99352 August 10, 1995 G02-95-151 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JVLY 1995 Transmitted herewith is the Monthly Operating Report for the month of July 1995 as required by Technical Specification 6.9.1.6.
Sincerely,
. V P
'sh (Mail op V ce r ide, Nuclear 0 VV.P.
1023) tions JVP:DGE CC:
LJ Callan, NRC RIV NRC Sr. Resident Inspector (927N)
INPO ANILibrary UtilityData Institute BPA (399) 9508ibOib0 'P5073i PDR "ADDCK Osooos97 R
~
~
~ 4 h4 h
~
(
OPERATING STATUS REPORT for WNP-2 Date:
August 1, 1995 2.
3.
4.
6.
7.
8.
9.
10.
11.
Docket:
50-397 Reporting Period:
JULY 1995 Outage + On-line Hours:
673.7 UtilityContact:
David G. Embree (509) 377-8448 Licensed Thermal Power (MW, ):
3486 Nameplate Rating (Gross MW, ):
1200.9 Design Electrical Rating (Net MW,):
1120*
Maximum Dependable Capacity (Gross MW,):
1132*
Maximum Dependable Capacity (Net MW, ):
1086*
Ifchanges occur above since last report, give reasons:
- Reactor power uprate testing results have not been finalized. Electrical ratings to be recalculated next month.
Power to which restricted, ifany (Net MW,):
None Reasons for restrictions, ifany:
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)
Gross Electrical Energy (MWH)
Net Electrical Energy (MWH)
Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (MDC Net)
Unit Capacity Factor (DER Net)
Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 727.6 16.5 673.7 70.4 2,120,573 719,880 692,417 90.5%
100.0%
85.7%
83.1%
0.0%
0.0 YEAR 5,087.0 3,262.2 404.5 3,009.9 577.1 9,558,650 3,275,340 3,129,412 59.2%
70.5%
56.6%
54.9%
10.4%
348.6 CUMULATIVE 93,175.2 65,962.8 744.9 63,577.5 958.8 188,821,490 63,628,840 60,954,546 68,2%
69.3%
59.9%
59.2%
11.6%
8,319.7 26.
Shutdowns scheduled over the next 6 months (type, date, duration):
None 27.
Ifcurrently shutdown, estimated startup date:
NA Note:
Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
H t
~
I' k
- a)
I
'h I
.l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 August 1, 1995 D. G. Embree (509) 377-8448 REPORT PERIOD:
JULY 1995 DAY AVERAGE DAILYPOWER LEVEL (Net MWe)
AVERAGE DAILYPOWER LEVEL DAY (Net MWe) 10 12 13 14 15
-13
-17
-10 176 235 673 722 985 1085 1122 1141 1143 1146 1154 1148 16 17 18 19 20 21'2 23 24 25 26 27 28 A9 30 31 1152 1150 1147 1142 1136 1142 1144 1082 1151 1148 1142 1151 1148 1154 1029 1145 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
~,
lt E
l ll 0
H N
UNIT SHUTDOWNS AND POWER REDUCTIONS REPQRT PERIQD:
JULY 1995 DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-397 WNP-2 August 1, 1995'.G.
Embree (509) 377-8448 No.
Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None SUMVIARY:
At the beginning of the month, the plant commenced startup and the main generator was synchronized to the BPA grid on July 3.
The plant operated at a new full power level as the result of the reactor power uprate (+5%), except for minor downpower evolutions to conduct periodic testing and maintenance activities.
TYPE F - Forced S - Scheduled REASON A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F - Administration G - Operational Error H - Other METHOD 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other SYSTEM & COMPONENT NUREG4161 Exhibits F & H