ghee RECy (,4 Cg
s 1~
au
Pp
+~*y4 UNITED STATES CLEAR REGULATORY COMMISSI
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400 AR LINGTON,TEXAS 76011.8064 AUG l 6 !995 EA-95-096 Washington Public Power Supply System ATTN:
J.
V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.
Box 968, MD 1023 Richland, Washington 99352 SUBJECT:
MEETING SUMMARY On July 28, 1995, representatives of Washington Public Power Supply System met with NRC personnel in the Region IV office located in Arlington, Texas, to discuss the apparent violations identified in NRC Inspection Reports 50-397/95-07 and -95-13.
The conference was held at the request of Region IV.
During the predecisional enforcement conference, the licensee disagreed with the violation related to the failure to initiate a Problem Evaluation Report in response to a half scram during startup activities.
We will consider the comments provided in our evaluation of the enforcement action.
The licensee presented a summary of the causes for the apparent violations and their corrective actions.
The attendance list and the licensee's presentation are attached to this summary.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this summary and its enclosures will be placed in the NRC Public Document Room.
Sincerely, Docket:
50-397 License:
~uv.
J.
E. Dyer, Director Division of Reactor Projects Enclosures:
1.
Attendance List 2.
Licensee Presentation 9508i80227 9508ih PDR ADCICK 05000397
Washington Public Power Supply System cc w/enclosures:
. Washington Public Power Supply System ATTN:
J.
H. Swailes, WNP-2 Plant Manager P.O.
Box 968, HD 927M Richland, Washin'gton 99352-0968 P
Washington Public Power Supply System ATTN:
Chief Counsel 3000 George Washington Way P.O.
Box 968, MD 396 Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:
Frederick S. Adair, Chairman P.O.
Box 43172 Olympi a, Washington 98504-3172 Washington Public Power Supply System ATTN:
D. A. Swank, WNP-2 Licensing Manager P.O.
Box 968 (Hail Drop PE20)
Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:
P.
R.
B'emis, Director Regulatory and Industry Affairs P.O.
Box 968 (Hail Drop PE20)
Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:
Chairman P.O.
Box 190 Prosser, Washington 99350-0190 Winston h Strawn ATTN:
H.
H. Phil.ips, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
Washington Public Power Supply System AUG I 6 l995 bcc to DHB (IE
)
bcc distrib.
by RIV:
L. J.
Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, Leah Tremper (OC/LFDCB, HS:
TWFN G.
Sanborn M. Satorious, OE Resident Inspector HIS System RIV Fil e WCFO)
Branch Chief (DRP/TSS)
9EIO)
H.
Hammond (PAO, WCFO)
DOCUMENT NAME:
To receive copy of document. indicate in box "C" ~ Copy without enclosures
"E" e Copy with enclosures "N" ~ No copy RIV:C:ORPOLE HJWong 08/
/95 D:WCFO KEPerkins 08/
/95 D:DRP JEDyer 08/g,/95 08/
/95
C CO CO Y
08/
/95
Washington Public Power Supply System AUG I 6 l995 bcc to DMB (IE45)
bcc distrib.
by RIV:
L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/f, Leah Tremper (OC/LFDCB, MS:
TWFN G.
Sanborn M. Satorious, OE Resident Inspector MIS System RIV File WCFO)
Branch Chief (DRP/TSS)
9E10)
M.
Hammond (PAO, WCFO)
DOCUMfNT NAME:
To receive copy of document, indicate in px "c" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" = No copy RIV:C:DRPif HJWong 08/
/95 D:WCFO KEPerki 08/'95
C D:DRP JEDyer 08/I /95 CO C
08/
/95 08/
/95
ENCLOSURE I ATTENDANCE AT PREDECISIONAL ENFORCEMENT CONFERENCE NRC/WPPSS ON JULY 28; 1995 Washin ton Public Power Su
S stem WPPSS V. Parrish, Vice President Nuclear Operations P.
Bemis, Regulatory and Industry Affairs Director J. Swailes, Plant General Manager C. Schwarz, Operations Manager J.
McDonald, Assistant Engineering Director H. Matcher, Staff Attorney NRC Attendees L. Callan, Regional Administrator J.
Dyer, Director, Division of Reactor Projects K. Brockman, Deputy Director, Division of Reactor Safety W.
Bateman, Project Director, NRR W. Johnson, Acting Deputy Director, Division of Reactor Projects K. Perkins, Director, Walnut Creek Field Office J. Pellet, Chief, Operations Branch H.
Wong, Chief, Reactor Projects Branch E
R. Barr, Senior Resident Inspector J. Clifford, Senior Project Manager, NRR K. Thomas, Project Manager, NRR E.
Brown, Reactor Engineer Intern, NRR G. Sanborn, Enforcement Officer J. Beall, Senior Enforcement Specialist, OE C. Hackney, State Liaison Officer H. Satorius, Enforcement Speciali.st, OE (by telephone)
Others J. Zeller, Manageq, Energy Facility Site Evaluation Council J. Irish, Program Analyst, Bonneville Power Administration
ENCLOSURE
WASHlNGTON tUBL1C tOWER h
e% SUPPLY SYSI'EM
%NP-2 Operations Department HUMANPKRFO CK INDICATORPROGRAM
r~
J
WA5HINGTONFQBLlC tAWER
>
SUP SVSTEM p
o,-,Eo.URAL:"".:08 ecfcoypt:ii@c5 Procedure Non-Compliance Procedure Not Followed Correctly Procedure Incomplete CL'AXNCk-.-:,OR5ii-,=:,iN~POHiNANC Inadequate Preparation Inadequate Review Inadequate Application Inadequate Independent Verification coN5tGUNATI0N.'CON)'HOB~
Mispositioned Component COSCO Deficiencies LCO Deficiencies
TRENDING CHARTS
HUMANPE RMANCEINDICATOR
'onthly Performance Catagorles Procedure Compliance April Clearance Orders May June
July
0
12 Number of Events
HUMANPE RMANCEINDICATOR Weekly Performance Catagorfes 4/2 4/9 4/16 4/23 4/30 Procedure Compliance Clearance Orders 5/14 5/21 5/28 6/11 6/18 6/25 7/2 7/9 7/16
Number of Events
HUMANPERFORMANCE INDICATOR PROCKDURK COMPLIANCE
th C
LLJ Q
Xl E
Z
May Month June July
HUMANPE ORMANCEINDICATOR CLEARANCE ORDER PERFORMANCE ED0 LV O
ID E
R April May Month June July
HUMANPE ORMANCEINDICATOR CONFIGURATIONCONTROL tO UJ O
I E
R
April May June Ju;y Month
.FEEDBACK S
WASHINGTON PUBLIC tOWHII kN SUPPLY: SYSTEM Human Performance Indicator AprilSummary 295-317 295-377 Qsc9@zwGK~UsXQRcoM.;ENNY n-During plant operation in Hot S/D, the RWCU system was not in accordance with 2.2.3.RWCU-V-31 was opened and not in compliance with the PPM.
Dosimetry was left in the computer and employee entered RCA without it.
N F lw rr
295-409 PPM 7.4.9.2 was performed with all SRMs withdrawn.
295-279 295-335 295-319 RWCU filter/demin precoat tank (RWCU-TK-2) overflowed.
SGT-V-2A not opened during inerting.
Both AS-V-8 and AS-V-9 were closed prior to depressurizing the aux boiler.
Actions were not performed in sequence prescribed by the procedure.
P~I" 295-370 Cooldown watch readings were missed at 0640 and 0710, during turnover there was a miscommunication.
n d 295-376 295-371 IL%41@lICR.;QIIHR7 IJIRINIIWCBPR~BOBLI&
1'ag 13'or TMU-RMS-V/1Bwas hung on TMU-RMS-V/1Cand tage 14 TMU-RMS-V/1C was hung on TMU-RMS-V/1B.
Found the "C" phase MOD manual operator with the clearance order tag for the
"B" phase MOD manual operator on it.
295-380 Control switch for DSA-C-1B2 was found in the "AUTO"position instead of the required "OFF" position.
Mi ii 295-361 g',,:.
UIOR'A TINOiCOHTRO1, om nn During performance ofPPM 2.3.1, Section 5.13, Step 2, CSP-V-800/5 and CSP-V-800/6 were found in the "FULLCLOSED" position. The normal position is
"FULLOPEN".
V MOCE URE USAGE PERFORMANCE INDICATORS APRIL1995 CREW B C
uj OI
RWCU-V-31 opened Aux Blrimproperly S/D SGT-V-2Aclosed during lnertlng CREW C CREW F S<,
CREW A Pa Dosimetry left in machine
1 J(
295-335 ~~
Cooldown reading mlsseh
295 317 RWCU overflowed PER 27, 295-31 SRMs withdrawn NON-COMPLIANCE NOT FOLLOWED INCOMPLETE Procedural Error Types
CLEARANCE ORDER PERFORMANCE INDICATORS APML199$
CREW F STAFF S 3 ILJ OI Ez2 TMU-RMS-V/1A& B C & 8 phase MODs OSA Switch Programatic Review Application Clearance Error Catagories
COlVFIGURATIO1VCOIVIOI.
PERFORMANCE INDICATORS APRlL 199$
O
~x~Pj, Crew D
S 3 LU O
E Z p
CSP vlvs found closed Mispositioned
COSCO
LCO Configuration Control Categoric>
WA5HIMGTON7lJSL1C POWIR 4cS supprv svstxu Human Performance Indicator May 27-June 7 Summary gXiXRDCXhX~1feÃ88!COXfPLXC888 295-660 295-685 295-690 Nine breakers were found out of position during 2nd checks. (Crew B)
RWCR Log did not reflect discharge to river Chem sample numbers. (AllCrews)
CRS review not obtained on surveillance per Tech Spec guidelines. (Crew B)
cMINcPXoX58k48'oN ASAP,;PXesMNS NONE
'CWNPIQORAT10¹CQNTJlPL~
ii ned m
ne 295-652 RWCU-V-238 found mispositioned. (Crew E)
295-704 Deep bed bypass valve (FDR-VP61) found open. (Staff)
MOCPURE USAGE PERFORVANCE INDICATORS May 27-June 7 1995 CREW A
CREW B CREW C
ill OI Cl E
Z2 295-0660 &295-0690 CREW D CREW E
1
1
PA Y~Q 295-685 AllCrews
0 CREW F NON-COMPLIANCE NOT FOLLOWED INCOMPLETE Procedural Error Types
C UJ O
I E
Z 2
295-652 295-704
1
+y~~@:Pj+
Mispositfoned CONFIGU TIONCONTROL PERFORVANCE INDICATORS May 27 -June 7 1995
0 LCO COSCO Conffguration Control Categorfer P:,j;:,:
Crew E Staff
CLEARANCE ORDER PERFORMANCE INDICATORS May 2?- June 7 1995 C7 3 Ill O
L E
R2 Preparation Revievr Application lndep Vent Clearance Error Catagoriea
Wh58INGTON 7UBLlC 70lITBt SCAN SUPPLY SYSHEM Human Performance Indicator lune 18 - 24 Summary NKif8@o. KEUNXCNCoXNMSTCS 295-770 295-767 DSA-RMS-C1B2S49 was discovered in the "off"position vs. "auto". (Crew F)
DG I "after 1-hr" readings were not taken. (Crew F)
'CLBMNNCB70RtlBR>PMPOXTvA'NCB>i,;RQBB%1'I None CONFIGURATION,~CQNXROL:"-
None
azocAme Usw6z PERFORVANCE INDICATORS June 18-24 1995 Crew F
LU O
Ez
NON-COMPLIANCE NOT FOLLOWED INCOMPLETE Procedural Error Types
CLEA CE ORDER PERFORMANCE INDICATORS June 18-24 1995 L5 O
Preparation Review Application lndep Verii Clearance Error Catagorlec
CONFIGU TIONCONTROL PERFORVANCE INDICATORS June 18-24 1995
tll O
E Z
Mispositioned COSCO LCO Configuration Control Categoriet
WASHING'TON BUBLlC POWBB W SUPPLY SYSIKM Human Performance Indicator June 25 - July, 1 Summary Pxoc858~,-88i6KCGM!~88 295-814 During Rx startup a 1/2 scram occured.
IRM C was accidently ranged down.
(Grew C)
Pr 295-804 N Fllw During surveillance, IRM Ch "C" was selected vs. SRM Ch "C". (Crew 8)
cLBFQNNc'87059$NP8RP0R$ @MNN,RGIQ@3 None coiifievyTIo8-:;e6Nrxga None
PROCEDURE USAGE PERFORVANCE INDICATOES June25
- Ju/y L
$995 c'VÃR
!i'z,~~;
CREW C CREW 8
tLI O
E Z
0 NON-COMPLIANCE NOT FOLLOWED
INCOMPLETE Procedural Error Types
eisa cz 0m'ERFORMANCE INDICATORS June 25 - Ju/y 1 1995 C
Cl 3 UJ OI K2 Preparation Review Application indep Verlf Clearance Error Categories I
CONFIGURE TIONCONTROL PERFORMANCE INDICATORS June25-July l f995
Ill O
L C1 Ez
Mispositioned COSCO LCO Configuration Control Categories
WA58lXGTONtURLlC tOWER M sUppLY sYsrpM Human Performance Indicator July 2 - 8 Summary EXSCRDQNEMSX6$esrEKMWRE 295-S17 PPM 7.4.7.3.3B was not properly verified prior to use. (Crew A)
~
iis-iiis kX";:825NNCRYGRDSk99@PORi@Ã~Gag
hile transferring initials from field copy to original the individual inadvertently signed for all tags when tag tl was still hanging on panel. (Crew B)
'COSBIG'ULLA'T'l9¹CONRQQ None
I'Ir.OCAURE USAGE IEZVaxvxrcz WDICarms July2 -8 1995 GREW A
LV O
L E
Z
NON-COMPLIANCE NOT FOLLOWED INCOMPLETE Procedural Error Types
CLEA CE ORDER PERFORMANCE INDICATORS Ju/y2-8 1995 CREW 8 IO 3 UJ O
I Ez2
Preparation Review Application lndep Yertf Clearance Error Catagortes
coram'Uz IOW cormoI.
PERFORMANCE INDICATORS Ju/y2-8 1995 GOOD JOB)
Mlsposllloned COSCO LCO Contlguratlon Control Categoric
WhSRlMGTON?URLlC ROWRR M SUPPLY SYSTEM
. xnan Performance Indicator July 9 - 1$ Summary NN@xORA'L'-;:,UN6'eohoNQVX
r 295-837 QA PER not dispositioned w/required time frame defined in PM 1.3.12. (Staff)
295-846 W
l Control rod mispositioned during surveillance. (Crew D)
gEKMGNcs,,oRDSkehRHGRdxNc88;RoiMhM'one CoNHiooiv'moNFc@8m05 None
PROCEDURE USAGE PERFORMANCE INDICATORS Ju/y 9-15 1995 O
Yg".", ',:
Staff CREW D
Llj O
L E
Z
0
NON-COMPLIANCE NOT FOLLOWED
INCOMPLETE Procedural Error Types
CL,EA CZ Oman PERFORMANCE INDICATORS Ju/y 9-151995 CONGRATULATIONS,ZERO ERROR
3 LU O
I E
K2
0 Preparation Review
Application
lndep Yerif Clearance Error Catagorles
CONFIGU TIOXCONTROL PERFORMANCE INDICATORS July 9- $5 1995 KEEP UP THE GOOD WORK
LU O
L J3 E
R-
0
Mispositioned
COSCO
LCO Conliguration Control Categories
WA5RWGVON 7USL1C 7OWRR
~ SUPPLY SYS1'EM Human Performance Indicator Jrily 16 - 22 Summary 814)l!R)XJiNLRUN'6Ne07d56tCB NONE eg8NNMOS-;,0%NN>NN oN6lNeNNg@5&M8 Pr n
PER 295-869 C.O. was written for wrong CRD HCU. (Crew A)
005PIGU'RAT101WC'08gROL'ONE
M'OCEDURE USAGE PERFORvVANCE INDICATORS Ju/y 16-22 1995 EXPECTATION MET-ZERO ERRORS
Lu O
E Z
NON-COMPLIANCE NOT FOLLOWED INCOMPLETE Procedural Error Types
CLEARANCEORDER PERFORMANCE INDICATOR'S Ju/y fG-22 fSS5 GREW A
Uj O
I Cl E
Z
Preparation Review Application Indep Verit Clearance Error Catagorfes
INSTRUCTION
CONFIGURE TIO1VCONTROL PERFORMANCE INDICATOR'S Ju/y f8-22 1995 GOOD USE OF S.T.A.R.
th C7 UJ OI E
Z Mispositioned COSCO LCO Configuration Controf Categorlec