ML17291A953

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/95-22 on 950717-20.No Violations Noted
ML17291A953
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/14/1995
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A954 List:
References
NUDOCS 9508170003
Download: ML17291A953 (5)


See also: IR 05000397/1995022

Text

UNIT E 0 STATE6

LEAR REGULATORY COMMISS(

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

August 14,

1995

Washington Public

Power Supply System

ATTN:

J.

V. Parrish,

Yice President

Nuc'lear Operations

3000

George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-22

This refers to the inspection

conducted

by Dr. J. Blair Nicholas of this

office on July 17-20,

1995.

The ins'pection

included

a review of activities

authorized for your Washington Nuclear Project-2 facility.

At the conclusion

of the inspection,

the findings were discussed

with you and those

members of

your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

These

included the water chemistry

and radiochemistry

programs

and water chemistry

and radiochemistry confirmatory measurements.

Within these

areas,

the

inspection consisted of selective

examination of procedures

and representative

records,

interviews with personnel,

and observation of activities in progress.

The results of this inspection

are documented

in the enclosed

report.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed

in the

NRC Public Document

Room.'hould

you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

A

Ross

A. Scarano,

Director

Division of Radiation Safety

and Safeguards

Docket:

50-397

License:

NPF-21

Enclosure:

NRC Inspection

Report

50-397/95-22

go

9508170003

9508i4

PDR

ADQCK 05000397

6

PDR

Washington

Public

Power

Supply System

-2-

cc w/enclosure:

Washington

Public

Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant Manager

P.O.

Box 968,

HD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

Chief Counsel

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington

Public

Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R.

Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

H.

H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public

Power

Supply System

E-Mail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

DISTRIBUTION:

DMB (IE06)

L. J. Callan

WNP-2 Resident

Inspector

DRSS-FIPB File (Hodges)

MIS System

Branch Chief (DRP/E,

WCFO)

RIV Fi 1 e

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB, HS:

TWFN 9EIO)

B. Henderson

(PAO,

WCFO)

B. Murray, DRSS/FIPB

J.

B. Nicholas,

DRSS/FIPB

DOCUMENT NAME:

0: iFIPBttJBNItWN2522RP. JBN

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

G

q~l4

RIV:FIPB

JBNicholas:nh

08

/95

C: FIPB

urray

08/

/95

DD:D

DC

rlain

08/ 0/95

D:DR

JEDy

08/

/95

D:D

RA

08/l( /9

0

Wony g~tri44

'co ww~f5

Washington Public

Power

Supply System

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

DISTRIBUTION:

DHB ( IE06)

L. J.

Call'an gX

WNP-,2 Resident

Inspector

DRSS-FIPB File (Hodges)

HIS System

Branch Chief (DRP/E,

WCFO)

RIV File

Senior Project Inspector

(DRP/E,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9EIO)

B. Henderson

(PAO,

WCFO)

B. Hurray,

DRSS/FIPB

J.

B. Nicholas,

DRSS/FIPB

DOCUHENT NAHE:

0: ttF I PBiJBNiWN2522RP. JBN

To receive copy of document, indicate in box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

RIV:F IPB

C: F IPB

DD:D

D:DR

D:D

g~l'ir

JBNicholas:nh

081

/95

urray

08/

/95

DC

rlain

JEDy

08/ 0/95

08/

/95

0

C

C

Y Holt'

peur~

Co~~~/+

RA

08/(i /9