Forwards Insp Rept 50-397/95-20 on 950604-0715 & Notice of Violation
ML17291A964
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/16/1995
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A965 List:
References
NUDOCS 9508220154
Download: ML17291A964 (7)


See also: IR 05000397/1995020

Text

era.rOZn V Z 0

REGULATORY~~XHHMCL555ttfEBSI'BIDBUTION SYSTEM

( RIDS )

ACCESSION NBR:9508220154

DOC.DATE: 95/08/16

NOTARIZED:

NO

~

~

'ACIL:50-397 WPPSS Nuclear Project,

Unit 2, Washington Public

Powe

AUTH.NAME

AUTHOR AFFILIATION

DYER,J.E.

Region

4 (Post

820201)

RECIP;NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/95-20

on 950604-0715

a notice of

violation.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

DOCKET

05000397

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRCH/HHFB

OE DIR

RGN4

FILE

01

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

CLIFFORD,J

AEOD/DEIB

D/~

IL

CEN

NRR DORS/OEAB

NUDOCS-ABSTRACT

OGC/HDS3

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

TERNAL: LITCO BRYCEgJ

H

NRC

PDR

NOAC

1

1

NOTE TO ALL"RIDS" RECIPIENTS:.

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCL'iIENTCONTROL

DESK. ROONI PI -37 (EXT. 504-2083

) TO ELli!INATE YOUR NAXIEFROi!

DISTRIBU1'IOYLISTS FOR DOCUNIEYTS VOL'ON"I NEED!

TOTAL NUMBER OF COPIES REQUIRED-'TTR

19

ENCL

19

gp,A Agcy

~

v+

e

l~

00*<<<<

t

UN I T E D STATE6 t

NUCLEAR R EG ULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

AUG

I 6 l995

Washington Public

Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George

Washington

Way

P.O.

Box 968,

MD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-20

AND NOTICE OF VIOLATION

This refers to the inspection

conducted

by Mr. R.

C. Barr,

and the inspectors

identified in this report, of this office on June

4 through July 15,

1995.

The inspection

included

a review of activities authorized for your Washington

Nuclear Project

2 facility.

At the conclusion of the inspection,

the findings

were discussed

with those

members of your staff identified in the enclosed

report.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted

safely

and in accordance

with NRC requirements.

We were encouraged

by the well controlled startup

and

power ascension

following Refueling Outage

R10.

However,

the

WNP-2 staff continues

to make

a

number of human

performance errors.

During this inspection period,

these

errors resulted

in

a reactor water level transient,

a control

rod out of its

desired position,

two clearance

order errors

(breakers

out of position),

and

the inadequate

verification of the control

rod drive housing support

installation.

Your continued vigilance in eliminating

human performance

errors is warranted.

Based

on the results of this inspection,

certain of your activities

appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

The first two violations are of concern

because

they

resulted

in an unanticipated

reactor water level transient

and

a failure to

provide

an adequate

procedure for verification of the control

rod drive

housing

support installation.

The third violation,

a failure to perform

a

10 CFR 50.59 evaluation for a temporary modification, is of concern

because

of the inadequate

process

used to determine

whether to perform the safety

evaluation.

You are required to respond

to this letter

and should follow the instructions

specified

in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

In your response

to these violations

please

address

the apparent

differences

between

our inspectors'indings

and

your followup of this issue.

Your response

may reference

or include previous

9508220i54

950816

PDR

ADQCK 05000397

8

PDR

Washington

Public

Power

Supply System

docketed

correspondence, if the correspondence

adequately

addresses

the

required

response.

After reviewing your response

to this Notice, including

your proposed

corrective actions

and the results of future inspections,

the

NRC will determine

whether further

NRC enforcement

action is necessary

to

ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room

(PDR).

To the extent possible,

your response

should not include any

personal

privacy, proprietary,

or safeguards

information so that it can

be

placed

in the

POR without redaction.

However, if you find it necessary

to

include

such information, you should clearly indicate the specific information

that you desire

not to be placed in the

POR,

and provide the legal basis to

support your request for withholding the information from the public.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Docket:

50-397

License:

NPF-21

J.

E.

yer, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

50-397/95-20

cc w/enclosures:

Washington Public

Power Supply System

ATTN:

J.

H. Swailes,

WNP-2 Plant

Manager

P.O.

Box 968,

MO 927M

Richland,

Washington

99352-0968

Washington Public

Power Supply System

ATTN:

Chief Counsel

3000 George

Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Washington

Public

Power

Supply System

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Manager

P.O.

Box 968 (Mail Drop 'PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

P.

RE Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser,

Washington

99350-0190

Winston

& Strawn

ATTN:

M. H. Philips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public

Power

Supply System

AUG

I 6 l995

E-Mail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IEOI)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TWFN 9EIO)

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:i wn2iwn520rp.rcb

To receive

copy of document,

indicate in box:

"C" = Copy without

enclosures

"E" = Copy with enclosures

"N" = No copy

RIV: SRI

RCBarr*

8/8/95

C:DRP

E

HJWong*

8/9/95

D:DRP

E

JEDyer

8/lk /95

  • reviou

urr

p

s y conc

e

OFFICIAL RECORD

COPY

Washington Public

Power

Supply System

AUG

I 6 l995

E-Hail report to D. Sullivan

(DJS)

E-Hail report to

NRR Event Tracking System

( IPAS)

bcc to

DHB ( IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

Resident

Inspector

HIS System

RIV'ile

Branch Chief (DRP/TSS)

B. Henderson

(PAO,

WCFO)

DOCUMENT NAME:

R:g wn2(wn520rp.rcb

To receive

copy of document,

indicate in box:

"C"

= Copy without

enclosures

"E"

= Copy with enclosures

"N" = No copy

RIV:/SRI

RCBarr*

8/8/95

  • revious y concurre

f )

Qe

C:DRP

E

HJWong*

8/9/95

0:DRP

E

JEDyer

8/Ib/95

OFFICIAL RECORD