Accepts Licensee Schedule for Replacement of Required Thermo-Lag 330-1 Matl.Requests That Licensee Advise NRC in Writing of Change in Schedule or Resolution Plans Described in Submittals
ML17291A950
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/10/1995
From: Clifford J
NRC (Affiliation Not Assigned)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
GL-92-08, GL-92-8, TAC-M85624, NUDOCS 9508150160
Download: ML17291A950 (7)


Text

C gp,'tl R5CII I

vg ~4 0

A.0O Ich Cy

+~

~O

++**+

UNITED STATES NUCLEAR REGULATORY COMMISSlON WASHINGTON, D.C. 20555-0001 August 10, 1995 Mr. J.

V. Parrish (Hail Drop 1023)

Vice President Nuclear Operations 3000 George Washington Way Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968

SUBJECT:

COMPLETION OF GENERIC ACTION FOR GENERIC LETTER 92-08, "THERMO-LAG 330-1 FIRE BARRIERS" FOR THE WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

NUCLEAR PROJECT NO.

2 (WNP-2)

(TAC NO. M85624)

Dear Hr. Parrish:

By letter dated March 24, 1995 (G02-95-057),

as supplemented by letter dated April 27, 1995 (G02-95-082),

the Supply System responded to our December 29, 1994, request for additional information regarding the use of Thermo-Lag 330-1 at WNP-2.

Your responses stated that you will reassess the required fire

barriers, and expect to significantly reduce the required fire barriers to protect safe shutdown capability.

You also stated that you will use alternate acceptable fire barrier materials where fire barriers cannot be eliminated, and will not use 3H or Thermo-Lag 330-1 fire barrier materials to protect the capability to safely shut down WNP-2 in the event of a fire.

You further stated that alternate acceptable materials, where required, will be installed to replace 3H and Thermo-Lag 330-1 by the end of the spring 1997 refueling outage.

Your April 27, 1995, letter stated that the remaining Thermo-Lag and 3M fire barriers material will be abandoned in place unless combustible loading or physical interference issues require removal.

The NRC staff has reviewed your letters.

Based on this review, we have determined that, except for an assessment of the ampacity impact of the previously installed Thermo-Lag 330-1 material on cable life of safety-related circuits, your letters provided the information requested in Generic Letter 92-08, and our action tracked by TAC No. H85624 is complete.

The NRC considers your schedule for replacement of required Thermo-Lag 330-1 material acceptable.

Please advise us, in writing, if you change your schedule or the resolution plans described in your submittals.

In addition, please advise us, in writing, when the modifications described in your April 27, 1995 letter have been implemented.

This request for confirmation is discussed in Generic Letter 92-08, dated December 17,

1992, which provides the Office of Management and Budget clearance for the information.

9508i50i60 9508i0 PDR ADOCK 05000397 P

PDR,~

Hr. J.

V. Parrish August 10, 1995 The Supply System should retain all documentation related to the resolution of the concerns with Thermo-Lag 330-1 fire barrier systems for future NRC audits or inspections.

This documentation should include an evaluation of the ampacity impact of Thermo-Lag 330-1 material on cable life for previous operation of safety-related circuits.

Please contact me at 301-415-1352 if you have any questions.

Sincerely, ORIGINAL SIGNED BY:

James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-397 cc:

See next page DIS NZON:

Docket File UB JRoe EAdensam WBateman CHcCracken JClifford EPeyton CMcCracken ACRS(4),

TWFN PDIV-2 Reading

OGC, 015B18
KPerkins, WCFO
JDyer, RIV CBerlinger
HWong, RIV HGamberoni H

]I I

i g

DOCUMENT NAME: WNP85624.LTR

~ l,"See, Previous 'Sheet OFC DATE BC:EELB*

PDIV-2/LA.

BC:SPLB" CMcCracken JCalvo ey on 8/8/95 8/1 0/95 8/4/95

OFFICIAL RECORD COPY MDIV-2/PH JCl ord:pk 8/(0/95

y~ ~

n

/

I Ij iI ll I

JI I

'l l I

Mr. J.

V. Parrish The Supply System should retain all documentation related to the resolution of the concerns with Thermo-Lag 330-1 fire barrier systems for future NRC audits or inspections.

This documentation should include an evaluation of the ampacity impact of Thermo-Lag 330-1 material on cable life for previous operation of safety-related circuits.

Please contact me at 301-415-1352 if you have any questions.

Sincerely, Docket No. 50-397 cc:

See next page J

mes W. Cliff d, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Mr. J.

V. Parrish August 10, 1995 The Supply System should retain all documentation related to the resolution of the concerns= with Thermo-Lag 330-1 fire barrier systems for future NRC audits or inspections.

This documentation should include an evaluation of the ampacity impact of Thermo-Lag 330-1 material on cable life for previous operation of safety-related circuits.

Please contact me at 301-415-1352 if you have any questions.

Sincerely, ORIGINAL SIGNED BY:

James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-397 cc:

See next page DISTRIBUTION:

Docket File PUBLIC JRoe EAdensam WBateman CHcCracken JClifford

. EPeyton CHcCracken ACRS(4),

TWFN PDIV-2 Reading

OGC, 015B18
KPerkins, WCFO
JDyer, RIV CBerlinger
HWong, RIV MGamberoni z

~vP~p1 f

C DOCUMENT NAME: WNP85624.LTR

  • See Previous Sheet OFC NAME DATE BC:SPLB*

PD IV-2/LA BC:EELB*

JCalvo CHcCracken ey on 8/) 0/95 8/4/95 8/8/95 OFFICIAL RECORD COPY PD IV-2/PH JCl ord:pk 8//D /95

Hr. J.

V. Parrish CC:

Hr. J.

H. Swailes WNP-2 Plant General Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352-0968 Chief Counsel (Mail Drop 396)

Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Hr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.

Box 43172 Olympia, Washington 98504-3172 Mr.

D. A. Swank (Hail Drop PE20)

WNP-2 Licensing Manager Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352-0968 Hr. Paul R.

Bemis (Hail Drop PE20)

Director, Regulatory and Industry Affairs Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower

& Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Chairman Benton County Board of Commissioners P.O.

Box 69

Prosser, Washington 99350-0190 Hr.

R.

C. Barr, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 69

Richland, Washington 99352-0968 M. H. Philips, Jr.,

Esq.

Winston

& Strawn 1400 L Street, N.W.

Washington, DC 20005-3502

V