IR 05000397/1995025

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/95-25 on 950807-11.No Violations Noted
ML17291A995
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/29/1995
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A996 List:
References
NUDOCS 9508300230
Download: ML17291A995 (5)


Text

~pg AEQUI Wp0 y +c

)f**y4 UNITED STATES t

NUCLEAR REGULATORY COMMISSIO

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 August 29, 1995 Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023 Richland, Washington 99352 SUBJECT:

NRC INSPECTION REPORT 50-397/95-25 This refers to the inspection conducted by A. McQueen and R. Lantz:of this office on August 7-11, 1995.

The inspection included a review of activities authorized for your Washington Nuclear Project-2 facility.

At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.

The results of this inspection are documented in the enclosed report.

In accordance with 10 CFR 2.790 of the NRC's

"Rul.es of Practice,"

a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Docket:

50-397 License:

NPF-21 j~ Ross A. Scarano, Director P

Division of Radiation Safety and Safeguards Enclosure:

NRC Inspection Report 50-397/95-25 cc w/enclosure:

Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-2 Plant Manager P.O.

Box 968, MD 927M Richland, Washington 99352-0968 9508300230 950829 PDR ADOCK 05000397

PDR

Washington Public Power Supply System Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, HD 396 Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R. Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Hail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190 Prosser, Washington 99350-0190 Winston

& Strawn ATTN:

H.

H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502 Larry E. Moore, RAC Chairman FEMA Region X

PT Division (PT-TE-REP)

130 228th Street, S.W.

Bothell, Washington 98021-9796

Washington Public Power Supply System-3-E-Mail report to D. Sullivan (DJS)

E-Hail report to NRR Event Tracking System (IPAS)

DISTRIBUTION:

DMB (IE35)

XX L. J. Callant~

WNP-2 Resident Inspector DRSS-RIB File (Hodges)

MIS System Branch Chief (DRP/E, WCFO)

RIV File Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

H.

Hammond (PAO, WCFO)

J. Clifford, NRR Project Manager (HS 13 E5)

T. Essig, NRR/PERB (HS 9 H15)

T.

W. Dexter, DRSS/RIB A. D. HcQueen, WCFO (DRSS/RIB)

DOCUMENT NAME:

0:iRIBItADMttWN525RP.ADH Nutmeg To receive copy of document, indicate in box: "C" ~ Copy without enclosures

" ~ CdpfQSenciosures

"N" ~ No copy RIV:RIB ADMcQueen:nh 08/4 /95 AC:RIB TWDexter 08/~ /95 D

o erlain 08/2 /95 D

~

08)2

D:D RA car o

08/ 0/95

Washington Public Power Supply System E-Hail report to D. Sullivan (DJS)

E-Hail report to NRR Event Tracking System (IPAS)

DISTRIBUTION:

DHB (IE35)

L. J. Callan WNP-2 Resident Inspector DRSS-RIB File (Hodges)

HIS System Branch Chief (DRP/E, WCFO)

RIV File Senior Project Inspector,(DRP/E, WCFO)

Branch Chief (DRP/TSS)

Leah.Tremper (OC/LFDCB, HS:

TWFN 9E10)

H.

Hammond (PAO, WCFO)

J. Clifford, NRR Project Manager (HS 13 ES)

T. Essig, NRR/PERB (MS 9 H15)

T.

W. Dexter, DRSS/RIB A. D. Mcgueen, WCFO (DRSS/RIB)

DOCUMENT NAME:

0:iRIBiADMiWN525RP.ADH HSulrxe To receive copy of document, indicate in box: "C" ~ Copy without enclosures

" ~ Copf4ISenclosures

"N" = No copy RIV:RIB ADMcQueen:nh 08/W /95 AC: RIB TWDexter 08/

/95 D

o erlain 08/2

/95 D:

08/2

D:D RA car o

08/ 8/95