Text
REGULATOR'5~7$@9%4REMtg EIFBSIBIIIBUTION SYSTEM
( RIDS )
4
ACCESSION NBR:9508220014
DOC.DATE: 95/08/17
NOTARIZED: NO
DOCKET I
FACIL:50-397
WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
SCARANO,R.A.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/95-23
on 950817.No violations
noted.
DISTRIBUTION CODE:
IE06D
COPIES
RECEIVED:LTR
ENCL
SIZE:
R
TITLE: Environ
& Radiological
(50 DKT)-Insp Rept/Notic
of Violation Respons
I
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
NTER
D
PUB
OE DIR
EXTERNAL: NOAC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/TTC
NMSS/SGTB
T8F5
NUDOCS-ABSTRACT
OGC/HDS3
RGN4
FILE
01
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
U
NOTE TO ALL"RIDS" RECIPIENT'S:,
PLEASE HELP US TO REDI.'CE O'ASTE! COiTACTTHE DOCL'NIEiTCOiTROL
DESK, ROOi! Pl-37 IEXT. 504-20S3 ) TO ELIiIINATE YOL'R iAiIE,FROiI
DISTRIBI."I'IOY,LISTS FOR DOCI:NIENTS YOL'Oi "I'
L'ED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
15
ENCL
15
<pS >EGA~
0
rr
~
-"
0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE. SUITE 400
ARLINGTON,TEXAS 76011 6064
August 17,
1995
Washington Public Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
MD 1023
Richland,
99352
SUBJECT:
NRC
INSPECTION
REPORT 50-397/95-23
This refers to the inspection
conducted
by Mr. Gilbert L. Guerra, Jr., of this
office on July 17-20,
1995.
The inspection
included
a review of activities
authorized for your Washington Nuclear Project-2 facility.
At the conclusion
of the inspection,
the findings were discussed
with you and those
members of
your staff identified in the 'enclosed
report.
The disposition of the
notification made to the
NRC on July 12,
1995,
regarding radioactive material
found in the spray
pond drain field trench,
was discussed
during
a telephone
conversation
on August 9,
1995,
between
Mr.
W. Kiel of your staff and
Mr.
G. Guerra of this office.
Areas
examined during the inspection
are identified in the report.
These
included the radiological
environmental
monitoring program.
Within these
areas,
the inspection consisted of selective
examination of procedures
and
representative
records,
interviews with personnel,
and observation of
activities in progress.
The results of this inspection
are documented
in the
enclosed
report.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Ross
A. Scarano,
Director
Division of Radiation Safety
and Safeguards
Docket:
50-397
License:
Enclosure:
NRC Inspection
Report
50-397/95-23
p
95082200i4 9508i7
ADOCK 05000397
6
Washington Public Power
Supply System
cc w/enclosure:
Washington Public Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Manager
P.O.
Box 968,
HD 927M
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympi a, Washington
98504-3172
Washington Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Manager
P.O.
Box 968 (Mail Drop PE20)
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
8 Strawn
ATTN:
M. H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Public
Power
Supply System
E-Mail report to D. Sullivan
(DJS)
E-Hail report to
NRR, Event Tracking System
( IPAS)
DISTRIBUTION:
DHB (IE06)
L. J. Callan
WNP-2 Resident
Inspector
DRSS-FIPB File (Hodges)
HIS System
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9EIO)
B. Henderson
(PAO,
WCFO)
RIV File
B. Hurray,
FIPB
G.
L. Guerra,
FIPB
DOCUMENT NAME:
0: iF IPBttGLGttWN2523RP. GLG
To receive copy cf document, indicate in box: "C" ~ Copy without enclosures
"E" ~ Copy with enclosures "N" ~ No copy
RIV: F IPB
- GLGuerra:nh
08/
/95
C: F IPB
- BMurray
08/
/95
- Previously concurred
DD:DRSS
Ds
08/
/95
0
C A
C
08/
/95
- DDChamberlain
J
er
D:DR
a
08/
/95
I
Washington Public Power
Supply System
E-Hail report to D. Sullivan
(DJS)
E-Hail report to
NRR Event Tracking System
(IPAS)
DISTRIBUTION:
DMB (IE06)
L. J. Callan
WNP-2 Resident
Inspector
DRSS-FIPB File (Hodges)
HIS System
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
RIV File
B. Murray,
FIPB
G.
L. Guerra,
FIPB
DOCUMENT NAME:
0: iFIPBiGLGiWN2523RP. GLG
To receive copy of document, lndicste in box: "C" ~ Copy without enclosures
"E
~ Copy with enclosures
N
~ No copy
RIV:FIPB
C: FIPB
DD: DRSS
D:
D:DR
- GLGuerra:nh
08/
/95
- BMurray
08/
/95
08/
/95
08/
/95
- DDChamberlain
J
er
a
08/
/95
- Previously concurred