IR 05000397/1995018

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/95-18 on 950629
ML17291A951
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/10/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9508160078
Download: ML17291A951 (5)


Text

RIDRIT'Y Z REGULAT BQI!8$% DfH!IBIVTZONTEM (RIDE)

ACCESS1ON NBR:9508160078 DOC.DATE: 95/08/10 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

~

~

AUTH.NAME AUTHOR AFFILZATION WYNN,T.P.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.

Washington Public Power Supply System SUBJECT:

Ack receipt of 950728 ltr informing NRC of steps taken to correct violations noted in insp rept 50-397/95-18 on 950629.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

DOCKET 05000397 RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRCH/HHFB OE DIR RGN4 FILE

'ERNAL: LITCO BRYCEgJ H

NRC PDR COPIES LTTR ENCL

1

2

1

1

1 l.

1

1

1

1

RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/DEIB AEO3)

E CE AR'R DORS/OEAB NUDOCS-ABSTRACT OGC/HDS3 NOAC COPIES LTTR ENCL

1

1

1

1

1

1

1

1 VOTE TO ALL"RIDS" RECIPIEii'TS:

PLEASE HELP US TO REDUCE iVASTE!COYTACTTHE DOCL'!iIENTCOYTROL DESK, ROOii! Pl-37 (EXT. 504-TOS3 ) TO ELI!iIIKATEYOUR YAiiIEFROi!

DIS1'RIDl"I'I04 LISTS FOR DOCI.'NIE41 S YOL'- DOY'1 iEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

~AI7 = 0 ST~ T =>>

.L: '

0:Gv'l0. '+BY COt"'lilllSSI+

~"=isis.iV i,'R'm 0'v, ~='~~S

~

G011.8Cii-'ashington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023 Richland, Washington 99352 SUBJECT:

NRC INSPECTION REPORT 50-397/95-18 AND NOTICE OF VIOLATION Thank you for your letter of July 28 '995, in response to our letter and Notice of Violation dated June 29.

1995.

We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation.

We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely, Docket:

50-397 License:

NPF-21

/ ca--r

. C~lri~~

omas wy~0irector Division of Reactor Safety CC:

Washington Public Power Supply System ATTN:

J.

H. Swai les, WNP-2 Plant Manager P.O.

Box 968, MD 927M Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, MD 396 Richland.

Washington 99352-0968 Energy Facility Site Evaluation Counci 1 ATTN:

Frederick S. Adair, Chai rman P.O.

Box 43172 Olympia. Washington 98504-3172 f

/'l

~ ~ LJQ (k

~ (j 9508160078 950810 PDR ADOCK 05000397 PDR

~PP

-2-Washington Public Power Supply System ATTN:

P.

R.

Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Mail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190 Prosser.

Washington 99350-0190 Winston 8 Strawn ATTN:

M. H.

Phi lips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502 Washington Public Power Supply System C

Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Mail Drop PE20)

Richland, Washington 99352-0968

Washington Public Power Supply System-3-E-Hail report to D. Sullivan (DJS)

E-Hail report to NRR Event Tracking System (IPAS)

bcc to DMB (IE01) -

DRS bcc distrib. by RIV:

L. J. Callan DRSS-FIPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E.

WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

DRS AI File (95-078)

Resident Inspector MIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUMENT NAME: 0:'tWN518AK.LTR To receive copy of document, Indicate In box: "C" ~ Copy without enclosures

"E" ~ Co with enclosures "N" ~ No copy RIV:RI PHQualls 8/08/95 C:PSB WPAng 8/08/95 D:DRS TPGwynn 08/ 0/95 D:DRP JEDyer 08/0/

D:DRS PGwynn 08/(J /95

Washington Public Power Supply System-3-E-Hail report to D. Sullivan (DJS)

E-Mail report to NRR Event Tracking System (IPAS)

bcc to DHB ( IE01)

-

DRS bcc distrib.

by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

ORS AI File (95-078)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUMENT NAME: 0:NWN518AK.LTR To receive copy of document, Indicate in box: "C" Copy without enclosures

"E" ~ Co with enclosures "N" ~ No copy RIY:RI PMQualls 8/08/95 C:PSB WPAng 8/08/95 D:DRS, TPGwynn 08/ 0/95 AL D:DRP JEOyer 08/0/

0:DRS TPGwynn 08/lJ /95