ML17291A987

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 950831 to Discuss WNP-2 Oversight Committee
ML17291A987
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/23/1995
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9508290140
Download: ML17291A987 (9)


Text

WK,J.H&J. XX J.

CCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9508290140 DOC.DATE: 95/08/23 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 P

AUTH.NAME AUTHOR AFFILIATION DYER,J.E.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION Region 4 (Post 820201)

SUBJECT:

Notification of significant licensee meeting w/util on 950831 to discuss WNP-2 oversight committee.

DISTRIBUTION CODE:

IE45D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Summary of Significant Meeting with Licensee (Part 50)

NOTES:

0 RECIPIENT ID CODE/NAME CLIFFORD,J INTERNAL: DEDRO NRR/DISP/PIPB OGC/ROED RGN4 FILE 01 EXTERNAL: NOAC COPIES LTTR ENCL 1

/

RECIPIENT ID CODE/NAME ILE CE BSTRACT RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 0

N NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5DS (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

I

~PS RE00 'Ip0 op j'g UN IT E D STATES LEAR REGULATORY COMMISSION REGION IV E11 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON.TEXAS 76011 8064 Au(7 23 I995 NOTICE OF LICENSEE MEETING Name of Licensee:

Name of Facility:

Docket No.:

Date and Time of Meeting:

Location of Meeting:

Washington Public Power Supply System Washington Nuclear Plant 2

(WNP-2) 50-397 August 31, 1995 8:30 a.m.

WPPSS Corporate Office, Wakley Room

Richland, Washington Purpose of Meeting:

Discussion of WNP-2 Oversight Commitee NRC Attendees:

Licensee Attendees:

NOTE:

(1)

This meeting is J.

E. Dyer, Director, Division of Reactor Projects W.

H. Bateman, Director, Project Directorate PDIV-2 K.

E.

Brockman, Deputy Director, Division of Reactor Safety D.

D. Chamberlain, Deputy Director, Division of Security and Safeguards K.

E. Perkins, Director, Walnut Creek Field Office H. J.

Wong, Chief, Reactor Projects Branch E

R.

C. Barr, Senior Resident Inspector J.

W. Clifford, Senior Project Manager J.

V. Parrish, Vice President Nuclear Operations J.

P. Burn, Engineering Director G. 0. Smith, equality Assurance Director P.

R. Bemis, Regulatory and Industry Affairs Director R. L. Webring, Support Services Director J.

H. Swailes, Plant General Manager C. J.

Schwarz, Operations Manager J.

P. Albers, Radiation Protection Hanager D. A. Swank, Lic'ensing Manager G.

D. Sanford,

Planning, Scheduling, Outage Hanager H.

M. Honopoli, Maintenance Division Manager J.

A. HcDonald, Technical Services Manager J.

W. Baker, Nuclear Training Director open to attendance by members of the general public.

9508290140 9508=3 PDR ADOCK 05000397 P

PDR

Washington Public Power

'upply System (2)

NRC personnel, not listed above, that desire to attend this meeting should notify H. J.

Wong at 510/975-0296 by COB on August 28.

Approved By:

CC:

Washington Public Power Supply System ATTN:

J.

V. Parrish, Vice President Nuclear Operations 3000 George Washington Way P.O.

Box 968, MD 1023

Richland, Washington 99352 Washington Public Power Supply System ATTN:

J.

H. Swailes, WNP-,2 Plant Manager P.O.

Box 968, HD 927M

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

Chief Counsel 3000 George Washington Way P.O.

Box 968, MD 396

Richland, Washington 99352-0968 Energy Facility Site Evaluation Council ATTN:

Frederick S. Adair, Chairman P.O.

Box 43172 Olympia, Washington 98504-3172 Washington Public Power Supply System ATTN:

D. A. Swank, WNP-2 Licensing Manager P.O.

Box 968 (Nail Drop PE20)

Richland, Washington 99352-0968 Washington Public Power Supply System ATTN:

P.

R.

Bemis, Director Regulatory and Industry Affairs P.O.

Box 968 (Nail Drop PE20)

Richland, Washington 99352-0968 Benton County Board of Commissioners ATTN:

Chairman P.O.

Box 190

Prosser, Washington 99350-0190
yer, erector Division of Reactor Projects

1'

Washington Public Power Supply System Winston

& Strawn ATTN:

H.

H. Philips, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

Washington Public Power Supply System AUG 23 l995 Distribution:

f-Mail to:

CJG (Carol Gordon)

DMK1.(D. M. Kunihiro)

PMNS (Mtg. Announcement Coordinator)

DJS (Dennis Sullivan)

NRC Attendees DMB (IE 45)

J.

L. Milhoan, DEDR (MS 17G21)

H. L. Thompson, DEDS (MS 17G21)

W. T. Russell, D/NRR (MS 12D1)

A. C. Thadani, ADT/NRR (MS 12G18)

R.

P.

Zimmerman, ADP/NRR (MS 12G18)

J.

Lieberman, D/Of (MS 7H5)

L. J.

Chandler, OGC (MS 15B18)

OfDO RIV Coordinator (MS 17G21)

L. J. Callan, RA S. J. Collins, DRA G.

F. Sanborn, EO C. A. Hackney,

RSLO, RIV B. Henderson,
PAO, RIV RA Secretary DRA Secretary Carol Gordon Division Secretary (DRP,
DRS, DRSS)

L. S. Ousley RIV File D. Kunihiro, WCFO M. Hammond, WCFO PAO M. Smith J.

Bianchi DRP File WNP Resident Inspector To receive copy of document, indicate in box: "C" ~ Copy without cl ures "E" ~ Copy osures "N" ~ No copy RIV:C:DRP/E HJWong;df 8/2 7/95 PAO D:WCFO KEPerkins 8/

/95 BHenderson 8/

95 0

C IAL R CORD CO RSLO CAHackney 8/+95 D:DRP JEDyer 8/Q /95

Washington Public Power Supply System AUG 23 I995 Distribution:

E-Mail to:

CJG (Carol Gordon)

DMK1 (D.

M. Kunihiro)

PMNS (Mtg. Announcement DJS (Dennis Sullivan)

NRC Attendees DMB (IE 45)

J.

L. Milhoan, DEDR (MS 17G21)

H.

L. Thompson, DEDS (MS 17G21)

W, T. Russell, D/NRR (MS 12DI)

A. C. Thadani, ADT/NRR (MS 12G18)

R.

P.

Zimmerman, ADP/NRR (MS 12G18)

J.

Lieberman, D/OE (MS 7H5)

L. J.

Chandler, OGC (MS 15B18)

OEDO RIV Coordinator (MS 17G21)

L. J. Callan, RA S. J. Collins, DRA G.

F. Sanborn, EO C, A. Hackney,

RSLO, RIV B. Henderson,
PAO, RIV RA Secretary DRA Secretary Carol Gordon Division Secretary (DRP,
DRS, DRSS)

L. S. Ousley RIV File D. Kunihiro, WCFO M.

Hammond, WCFO PAO M. Smith J.

Bianchi DRP File WNP Resident Inspector Coordinator)

To receive copy of document, indicate in box: "C" ~ Copy without cl ures "E" "- Copy osures "N" ~ No copy RIV:C:DRP/E HJWong;df 8/2 3/95 D:WCFO KEPerkins 8/

/95 RSLO PAO BHenderson CAHackney 8/+95 8/

95 0

C AL CORD CO Y

D:DRP JEDyer 8/A/95

I I]