e
~
PRIORIT'Y Z
REGULATIIRiRIIRHStT TIN'&lRTZCSTEM
(RIDE)
','CCESSION
NOR:9508290034
DOC.DATE: 95/08/24
NOTARIZED: NO
DOCKET I
FACIL 50-397
WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
'CARANO,R.A.
Region
4 (Poyt 820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH J.V.
Washington Public Power Supply System
SUBJECT:
Forwards
insp rept 50-397/95-21
on 950717-20
& notice of
P
violation.
R
DISTRIBUTION CODE'E06D
COPIES
RECEIVED LTR L ENCLj
SIZE 5 +
TITLE: Environ
& Radiological
(50 DKT)-Insp Rept/Notice of Violation Respons
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: AC
LE CENTE
P/PIPB
OE DIR
EXTERNAL: NOAC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CLIFFORD,J
AEOD/TTC
NMSS/SGTB
T8F5
NUDOCS-ABSTRACT
OGC/HDS3
RGN4
FILE
01
NRC PDR
COPIES
LTTR ENCI
1
1
1
1
1
1
1
1
1
1
1.
1
1
1
D
0
U
E
N
VOTE TO ALL"RIDS" RECIPIENTS:
PLE,USE IIELP US TO REDUCE iYASTE!CONTACTTHE DOCL'XIEi'TCONTROL
DESK, ROOiI Pl -97 (EXT. 504-20S3
) TO ELIMIYATEYOUR KAME FROi1
DIS'I'RIDl"I'IOYLISTS FOR DOCL'MERITS YOU DOi "I FLIED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
15
ENCL
15
~p,R REC(g(
~
(4
i t~f:,
+**++
UNITE D STATES
LEAR REGULATORY COMMISS
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLING ON, TEXaS 76011 8064
August 24,
1995
Washington Public Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George
Way
P.O.
Box 968,
HD 1023
Richland,
99352
SUBJECT:
NRC INSPECTION'EPORT 50-397/95-21
This refers to the inspection
conducted
by Messrs.
L. T. Ricketson
and
H.
P.
Shannon of this office on July 17-20,
1995.
The inspection
included
a
review of activities authorized for your Washington Nuclear Project-2
facility.
At the conclusion of the inspection,
the findings were discussed
with you and those
members of your staff identified in the enclosed
report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted
safely
and in
accordance
with NRC requirements.
Based
on the results of this inspection,
certain licensed activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violations are of concern
because
they involved
failures to control high radiation areas
and implement timely corrective
actions.
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous docketed
correspondence, if the correspondence
adequately
addresses
the required response.
After reviewing your response
to this
Notice, including your proposed
corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10
CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosure(s),
and your response will be placed in the
NRC
Public Document
Room
(PDR).
To the extent possible,
your response
should not
include
any personal
privacy, proprietary,
or safeguards
information so that
it can
be placed
in the
PDR without redaction.
However, if you find it
necessary
to include
such information, you should clearly indicate the
specific information that you desire
not to be placed in the
PDR,
and provide
the legal basis to support your request for withholding the information from
the public.
9'508290034
950824
ADQCK 05000397
8
Public
Power
Supply System
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Hanagement
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Docket:
50-397
License:
Enclosures:
1.
2.
NRC Inspection
Report
50-397/95-21
Ro
A. Scarano,
Director
Division of Radiation Safety
and Safeguard's
cc w/enclosures:
Washington Public Power Supply System
ATTN:
J.
H. Swailes,
WNP-2 Plant Hanager
P.O.
Box 968,
HD 927H
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chairman
P.O.
Box 43172
Olympia, Washington
98504-3172
'ashington
Public Power Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Hanager
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public Power
Supply System
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser,
99350-0190
Winston
8 Strawn
ATTN:
H.
H. Philips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power
Supply System
E-Hail report to D. Sullivan
(DJS)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IE06)
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
B. Murray,
FIPB
H.
P.
Shannon,
FIPB
WNP-2 Resident
Inspector
HIS System
RIV File
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
L. T. Ricketson,
FIPB
DOCUMENT NAME:
0: iFIPBiLTRiWN2521RP. LTR
RIV:FIPB
FIPB
C: FIPB
DD:
D:DRP
LTRicketson:
MPShannon
BMurray
erl ain
QEDyer
08/~95
D:DR
RASc
08/
/95
08/
/95
08/
i /95
CO
0
08/23/95
08
95
Washington Public
Power
Supply System
E-Mail report to D. Sullivan
(DJS)
E-Mail report to
NRR Event Tracking System
( IPAS)
bcc to
DMB (IE06) ygy
bcc distrib.
by RIV:
L. J. Callan
DRSS-FIPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
B. Hurray,
FIPB
M.
P.
Shannon,
FIPB
WNP-2 Resident
Inspector
MIS System
RIV Fil e
Branch Chief (DRP/TSS)
B. Henderson
(PAO,
WCFO)
L. T. Ricketson,
FIPB
DOCUMENT NAME:
0: iFIPBiLTRiWN2521RP. LTR
RIV:FIPB
FIPB
C:FIPB
DD:
D:DRP
LTRicketson:
08/~95
D:DR
RASc
08/
/95
HPShannon
08/
/95
BMurray
08/
/95
CO
08
95
08/Zg/95
erlain
3EDyer