Forwards Insp Rept 50-397/95-24 on 950717-21.No Violations Noted
ML17291A970
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/21/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291A971 List:
References
GL-89-10, NUDOCS 9508240063
Download: ML17291A970 (6)


See also: IR 05000397/1995024

Text

~P,R RtgI

+

0

gy

~

0 Q

UNIT E D STATES

LEAR R EG ULATORY COMMISSI

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

Washington Public Power Supply System

ATTN:

J.

V. Parrish,

Vice President

Nuclear Operations

3000 George Washington

Way

P.O.

Box 968.

MD 1023

Richland.

Washington

99352

SUBJECT:

NRC INSPECTION REPORT 50-397/95-24

This refers to the inspection

conducted

by Messrs.

C.

Myers and

M. Runyan of

this office on July 17-21,

1995.

The inspection included

a review of

activities authorized

for your Washington Nuclear Project-2 facility.

At the

conclusion of the inspection,

the findings were discussed

with those

members

of your staff identi f'ied in the enclosed

report.

The inspection involved

a review of activities performed

by your staff to

complete

commitments

made in response

to Generic Letter 89-10.

"Safety-Related

Motor-Operated

Valves Testing

and Surveillance."

Within this area,

the

inspection consisted of selective examinations of procedures

and

representative

records

and interviews with personnel.

The results of this

inspection are documented

in the enclosed

report.

With the exception of one valve, the inspection

found that you have completed

your committed testing

and have adequately

demonstrated

the existing design

basis capability for safety-related

valves.

Some long-term aspects

of your

motor-operated

valve program remain to be developed.

Additional review of'he

scope

and completion of your Generic Letter 89-10 program will be performed

before closure of our review of the program.

After the exit meeting for this inspection,

we received your letter dated

July 28,

1995, notifying the

NRC that you had completed your Generic Letter 89-10 commitments to demonstrate

the existing design basis capability

of your safety related motor-operated

valves.

The letter stated that you

planned to use industry test data to demonstrate

the existing design basis

capability of motor-operated

valves which cannot

be tested

under design basis

differential pressure

conditions.

We plan to review this subject in our final

inspection.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

()ch.~

vU IJO M

9508240063

95082i

PDR

ADQCK 05000397

6

PDR

1

Washington Public Power Supply

System

-2-

Should you have any questions 'concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely

Docket:

50-397

License:

NPF-21

Enclosure:

NRC Inspection

Report

50-397/95-24 w/attachment

Thomas

P.

Gwyn

,

re t

Division of Rea

r Sa

ty

cc w/enclosure:

Washington Public Power Supply System

ATTN:

J.

H. Swai les,

WNP-2 Plant

Hanager

P.O.

Box 968,

HD 927H

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

Chief Counsel

3000 George Washington

Way

P.O.

Box 968,

MD 396

Richland,

Washington

99352-0968

Energy Facility Site Evaluation Council

ATTN:

Frederick

S. Adair, Chai rman

P.O.

Box 43172

Olympia. Washington

98504-3172

Washington Public Power

Supply System

ATTN:

D. A. Swank,

WNP-2 Licensing Hanager

P.O.

Box 968 (Hail Drop PE20)

Richland'ashington

99352-0968

Washington Public Power Supply System

ATTN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Washington Public

Power

Supply

Syst'm

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser

~ Washington

99350-0190

Winston

8 Strawn

ATTN:

N.

H.

Phi lips,

Esq.

1400

L Street,

N.W.

Washington,

D.C.

20005-3502

Washington Public Power Supply

System

-4-

E-Mail report to D. Sullivan (DJS)

E-Mail report to

NRR Event Tracking System

( IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

E. Kelly (RI)

I

J.

Jacobson

(RIII DRS)

Resident

Inspector

MIS System

RIY File

Branch Chief (DRP/TSS)

-B. Henderson

(PAO.

WCFO)

C. Casto (RII)

DOCUMENT NAME:

To receive copy of document, indicate in box: "G" ~ Copy without enclosures

"E"

Copy with e

res "N" ~ No copy

RIV:EB: RI

RI

ABC

D:DRS

D:DRP

DRS

MFRunyan/1mb

08/I p/95

CJMy

08/

5

E

o

ns

08/

95

TPGwyn

JED

08

/95 08/

/9

08/

/95

PGwyn

08

/95

Washington Public Power Supply

System

-4-

E-Mail report to D. Sullivan (DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to

DMB (IEOl)

bcc distrib. by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E.

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TWFN 9E10)

E. Kelly (RI)

J.

Jacobson

(RIII DRS)

Resident

Inspector

HIS System

RIV File

Branch Chief'DRP/TSS)

B. Henderson

(PAO,

WCFO)

C. Casto (RII)

DOCUMENT NAME:

To receive copy of document, Indicate In box: "C" ~ Copy without enciosures

"E" ~ Copy with e

res "N" ~ No copy

RIV:EB: RI

RI

ABC

D:DRS

D:DRP

DRS

HFRunyan/

mb

CJMy

08/1

/95

08/

5

E

o

'ns

08/ '5

08

/95

TP&yn

08/

/9

JEDy

PGwyn

08/

/95

08

/95