ML17291A970
| ML17291A970 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/21/1995 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17291A971 | List: |
| References | |
| GL-89-10, NUDOCS 9508240063 | |
| Download: ML17291A970 (6) | |
See also: IR 05000397/1995024
Text
~P,R RtgI
+
0
gy
~
0 Q
UNIT E D STATES
LEAR R EG ULATORY COMMISSI
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
Washington Public Power Supply System
ATTN:
J.
V. Parrish,
Vice President
Nuclear Operations
3000 George Washington
Way
P.O.
Box 968.
MD 1023
Richland.
99352
SUBJECT:
NRC INSPECTION REPORT 50-397/95-24
This refers to the inspection
conducted
by Messrs.
C.
Myers and
M. Runyan of
this office on July 17-21,
1995.
The inspection included
a review of
activities authorized
for your Washington Nuclear Project-2 facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members
of your staff identi f'ied in the enclosed
report.
The inspection involved
a review of activities performed
by your staff to
complete
commitments
made in response
"Safety-Related
Motor-Operated
Valves Testing
and Surveillance."
Within this area,
the
inspection consisted of selective examinations of procedures
and
representative
records
and interviews with personnel.
The results of this
inspection are documented
in the enclosed
report.
With the exception of one valve, the inspection
found that you have completed
your committed testing
and have adequately
demonstrated
the existing design
basis capability for safety-related
valves.
Some long-term aspects
of your
motor-operated
valve program remain to be developed.
Additional review of'he
scope
and completion of your Generic Letter 89-10 program will be performed
before closure of our review of the program.
After the exit meeting for this inspection,
we received your letter dated
July 28,
1995, notifying the
NRC that you had completed your Generic Letter 89-10 commitments to demonstrate
the existing design basis capability
of your safety related motor-operated
valves.
The letter stated that you
planned to use industry test data to demonstrate
the existing design basis
capability of motor-operated
valves which cannot
be tested
under design basis
differential pressure
conditions.
We plan to review this subject in our final
inspection.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
()ch.~
vU IJO M
9508240063
95082i
ADQCK 05000397
6
1
Washington Public Power Supply
System
-2-
Should you have any questions 'concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely
Docket:
50-397
License:
Enclosure:
NRC Inspection
Report
50-397/95-24 w/attachment
Thomas
P.
Gwyn
,
re t
Division of Rea
r Sa
ty
cc w/enclosure:
Washington Public Power Supply System
ATTN:
J.
H. Swai les,
WNP-2 Plant
Hanager
P.O.
Box 968,
HD 927H
Richland,
99352-0968
Washington Public Power Supply System
ATTN:
Chief Counsel
3000 George Washington
Way
P.O.
Box 968,
MD 396
Richland,
99352-0968
Energy Facility Site Evaluation Council
ATTN:
Frederick
S. Adair, Chai rman
P.O.
Box 43172
Olympia. Washington
98504-3172
Washington Public Power
Supply System
ATTN:
D. A. Swank,
WNP-2 Licensing Hanager
P.O.
Box 968 (Hail Drop PE20)
Richland'ashington
99352-0968
Washington Public Power Supply System
ATTN:
P.
R. Bemis, Director
Regulatory
and Industry Affairs
P.O.
Box 968 (Hail Drop PE20)
Richland,
99352-0968
Washington Public
Power
Supply
Syst'm
Benton County Board of Commissioners
ATTN:
Chairman
P.O.
Box 190
Prosser
99350-0190
Winston
8 Strawn
ATTN:
N.
H.
Phi lips,
Esq.
1400
L Street,
N.W.
D.C.
20005-3502
Washington Public Power Supply
System
-4-
E-Mail report to D. Sullivan (DJS)
E-Mail report to
NRR Event Tracking System
( IPAS)
bcc to
DMB (IE01)
bcc distrib.
by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E,
WCFO)
Leah Tremper
(OC/LFDCB,
MS:
TWFN 9E10)
E. Kelly (RI)
I
J.
Jacobson
(RIII DRS)
Resident
Inspector
MIS System
RIY File
Branch Chief (DRP/TSS)
-B. Henderson
(PAO.
WCFO)
C. Casto (RII)
DOCUMENT NAME:
To receive copy of document, indicate in box: "G" ~ Copy without enclosures
"E"
Copy with e
res "N" ~ No copy
RIV:EB: RI
RI
D:DRS
D:DRP
MFRunyan/1mb
08/I p/95
CJMy
08/
5
E
o
ns
08/
95
TPGwyn
JED
08
/95 08/
/9
08/
/95
PGwyn
08
/95
Washington Public Power Supply
System
-4-
E-Mail report to D. Sullivan (DJS)
E-Hail report to
NRR Event Tracking System
(IPAS)
bcc to
DMB (IEOl)
bcc distrib. by RIV:
L. J. Callan
DRSS-F IPB
Branch Chief (DRP/E,
WCFO)
Senior Project Inspector
(DRP/E.
WCFO)
Leah Tremper
(OC/LFDCB, HS:
TWFN 9E10)
E. Kelly (RI)
J.
Jacobson
(RIII DRS)
Resident
Inspector
HIS System
RIV File
Branch Chief'DRP/TSS)
B. Henderson
(PAO,
WCFO)
C. Casto (RII)
DOCUMENT NAME:
To receive copy of document, Indicate In box: "C" ~ Copy without enciosures
"E" ~ Copy with e
res "N" ~ No copy
RIV:EB: RI
RI
D:DRS
D:DRP
- DRS
HFRunyan/
mb
CJMy
08/1
/95
08/
5
E
o
'ns
08/ '5
08
/95
TP&yn
08/
/9
JEDy
PGwyn
08/
/95
08
/95