Issue date | Title | Topic | |
---|---|---|---|
IR 05000382/2023010 | 31 January 2024 | Comprehensive Engineering Team Inspection Report 05000382/2023010 | Stroke time Arc flash Significance Determination Process Foreign Material Exclusion Power Uprate |
IR 05000382/2023003 | 23 January 2024 | Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 | |
ML24012A196 | 12 January 2024 | Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and | |
PMNS20231406, Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request | 11 January 2024 | Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request | |
ML23340A233 | 28 December 2023 | Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-FRN | |
ML23340A229 | 28 December 2023 | Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR | |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
W3F1-2023-0056, Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 | 19 December 2023 | Owner'S Activity Report Form for Inservice Inspection Performed During Operating Cycle 24 / Refuel 24 | |
W3F1-2023-0055, Reply to a Notice of Violation | 14 December 2023 | Reply to a Notice of Violation | Significance Determination Process Grace period |
ML23348A122 | 14 December 2023 | NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems | Internal Flooding Probabilistic Risk Assessment |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A144 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23312A183 | 14 November 2023 | Integrated Inspection Report 05000382/2023003 and Notice of Violation | Offsite Dose Calculation Manual Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination Earthquake Fire Protection Program Overexposure Overspeed trip |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
W3F1-2023-0052, Core Operating Limits Report (COLR) - Cycle 26, Revision O | 7 November 2023 | Core Operating Limits Report (COLR) - Cycle 26, Revision O | Shutdown Margin Coatings |
ML23296A100 | 24 October 2023 | Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR | |
IR 05000382/2023401 | 4 October 2023 | Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) | Cyber Security Affidavit |
PMNS20231101, Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal License Amendment Request for Arkansas Nuclear One, Unit 2 and Waterford Steam Electric Station, Unit 3 | 2 October 2023 | Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal License Amendment Request for Arkansas Nuclear One, Unit 2 and Waterford Steam Electric Station, Unit 3 | |
W3F1-2023-0049, Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal | 28 September 2023 | Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability - Withdrawal | |
W3F1-2023-0048, Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | 25 September 2023 | Special Report SR 2023-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | |
ML23261B185 | 14 September 2023 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination Scaffolding |
IR 05000382/2023005 | 21 August 2023 | Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) | Fitness for Duty Cyber Security License Renewal |
IR 05000382/2023301 | 15 August 2023 | NRC Initial Operator Licensing Examination Approval 05000382/2023301 | |
IR 05000382/2023002 | 8 August 2023 | Integrated Inspection Report 05000382/2023002 | Ultimate heat sink Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Continuous fire watch Fire Protection Program Fire Watch Siren Overspeed trip |
IR 05000382/2023402 | 7 August 2023 | NRC Security Inspection Report 05000382/2023402 (Full Report) | Fitness for Duty |
W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program | 26 July 2023 | Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program | Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program |
IR 05000382/2023040 | 12 July 2023 | Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter | Past operability Enforcement Discretion |
ML23191A456 | 10 July 2023 | Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information | Commercial Grade Dedication Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
ML23158A104 | 8 June 2023 | Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 | Cyber Security |
ML23145A227 | 2 June 2023 | 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion | Past operability Enforcement Discretion |
ML23146A134 | 26 May 2023 | Information Request, Security IR 2023402 | Fitness for Duty |
ML23130A273 | 10 May 2023 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
W3F1-2023-0036, Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | 4 May 2023 | Special Report SR-2023-003-01 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days | Offsite Dose Calculation Manual |
PMNS20230582, Presentation to the St. Charles Parish Council of the Nuclear Regulatory Commission'S 2022 Annual Assessment of Safety Performance at Waterford Unit 3 Steam Electric Station | 2 May 2023 | Presentation to the St. Charles Parish Council of the Nuclear Regulatory Commission'S 2022 Annual Assessment of Safety Performance at Waterford Unit 3 Steam Electric Station | |
ML23122A101 | 2 May 2023 | Assessment Presentation 2022 | |
ML23117A217 | 1 May 2023 | Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment | |
W3F1-2023-0033, Submittal of Annual Radiological Environmental Operating Report - 2022 | 27 April 2023 | Submittal of Annual Radiological Environmental Operating Report - 2022 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
W3F1-2023-0032, Annual Radioactive Effluent Release Report (ARERR) 2022 | 27 April 2023 | Annual Radioactive Effluent Release Report (ARERR) 2022 | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium |
IR 05000382/2023001 | 24 April 2023 | Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion | Unanalyzed Condition High winds Tornado Missile Enforcement Discretion Temporary Modification Functionality Assessment Tornado-Generated Missile Tornado Missile Protection Operability Determination Earthquake Fire Protection Program Power change Unidentified leakage |
ML23111A213 | 21 April 2023 | Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities | Incorporated by reference |
ML23110A112 | 20 April 2023 | Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G | |
ML23108A254 | 18 April 2023 | WCGS Information Request, Security IR 2023401 | Fitness for Duty |
IR 05000382/2023403 | 17 April 2023 | Security Baseline Inspection Report 05000382/2023403 | Affidavit |
W3F1-2023-0025, Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 | 11 April 2023 | Annual Report of Individual Monitoring of Radiation Exposure for 2022 Per 10 CFR 20.2206 | |
ML23097A041 | 6 April 2023 | June 2023 Emergency Preparedness Exercise Inspection - Request for Information | |
ML23093A212 | 3 April 2023 | Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 |