Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000269/201201331 December 2012IR 05000287-12-013; 05/07/2012 - 10/09/2012; Oconee Nuclear Station, Unit 3; Digital Instrumentation and Control Modification InspectionTime of Discovery
ML13007A09931 December 2012Annual Letter - Generic Fundamentals Examination (GFE) Section for Region IIGeneric Fundamentals Examination
ML13029A49430 December 2012G20130076/LTR-13-0072 David and Penny Nett Ltr. Duke Power Company Relicensing Agreement in Reference to Lowering of Lake Keowee Water Levels
ML12363A17127 December 2012Letter Requalification Program Inspection - Oconee Nuclear PlantJob Performance Measure
ML13002A13421 December 2012License Amendment Request on Purification of the Borated Water Storage Tanks, Acceptance Review, ME9877Manual Operator Action
ML12354A27220 December 2012Request for Additional Information and Suspension of Review of License Amendment Request for Revised Licensing Basis for High-Energy Line BreaksThermal fatigue
ML12334A54919 December 2012Relief from the Requirements of the ASME Code (TAC Nos. ME8010-ME8036)Nondestructive Examination
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML12353A60718 December 2012Notification of Licensed Operator Initial Examination - 05000269-13-301, 05000270-13-301, and 05000287-13-301
ML13011A21817 December 2012Slides for Public Meeting on NFPA-805 Fire Protection ProgramFire Protection Program
ML12363A16414 December 2012(Ons), Units 1, 2 and 3 - Submittal of Evacuation Time Estimates (ETE) Analysis
ML12363A16614 December 2012Development of Evacuation Time Estimates, Appendix J - Appendix N
ML12363A16514 December 2012Development of Evacuation Time Estimates, Section 9 - Appendix H, Page H-29
ML12359A03914 December 2012Additional Information License Amendment Request for Temporary Tech Spec Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Field Pole Rewinds License Amendment Request..Safe Shutdown
Probabilistic Risk Assessment
Maintenance Rule Program
Offsite Circuit
ML12354A21714 December 2012Response to NRC Question Regarding Flood Modification Implementation TimelineFukushima Dai-Ichi
ML12355003914 December 2012Updated Plans and Schedule for ONS Standby Shutdown Facility Design Review Project
ML12352A12513 December 2012Submittal of Emergency Plan, Volume a, Revision 2012-04Minimum staff
Siren
RA-12-043, Decommissioning Funding Plan for Interim Spent Fuel Storate Installations (Isfsls)13 December 2012Decommissioning Funding Plan for Interim Spent Fuel Storate Installations (Isfsls)Decommissioning Funding Plan
License Renewal
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12349A21112 December 2012Selected Licensee Commitments Manual (SLC)
ML12349A26412 December 2012Transmittal of Selected Licensee Commitments Manual (SLC)Safe Shutdown
Shutdown Margin
Fire Barrier
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Time Critical Operator Action
License Renewal
Earthquake
Recently irradiated fuel
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Overspeed trip
ML12346A06311 December 2012Forthcoming Meeting with Duke Energy to Discuss NFPA-805 License Condition for Oconee Nuclear Station, Units 1, 2, and 3Fire Protection Program
ML12346A40411 December 2012License Amendment Request Related to Keowee Hydro Units, Acceptance Review
ML12346A48511 December 2012Operator Licensing Written Examination Approval Letter 05000269-12-302, 05000270-12-302, and 05000287-12-302
ML13112A26610 December 2012Letter by David Lochbaum, Union of Concerned Scientists, Regarding Timing of Operator Actions Needed for Reactor Core ProtectionEarthquake
ML12348A0557 December 2012Response to RAI Regarding 10 CFR 50.46 Notification of Change in Peak Cladding Temperature for Large Break Loss of Coolant Accident Analysis
ML12363A16730 November 2012Development of Evacuation Time Estimates, Cover - Section 8Siren
IR 05000269/201201029 November 2012IR 05000269-12-010; Duke Energy Carolinas, LLC; 11/5-9/2012; Oconee Nuclear Station Unit 1, NRC Post-Approval Site Inspection for License Renewal, Inspection ReportFire Barrier
Coatings
Aging Management
License Renewal
Fire Protection Program
ML16272A22027 November 2012Enclosure 1: Flood Walkdown Report (NRC 50.54(f) NTTF Recommendation 2.3), Dated November 27, 2012 (Redacted)Safe Shutdown
Unanalyzed Condition
B.5.b
Fukushima Dai-Ichi
Foreign Material Exclusion
Earthquake
Minimum staff
ML12347A25227 November 2012Seismic Walkdown Information Request for Information Pursuant to Title 10 of Code of Federal Regulations Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident 3/12/12Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Seismic Walkdown Report
ML12338011127 November 2012Flooding Walkdown Information Requested by NRC Letter, Request for Information Pursuant to 10CFR50.54(f) Re Recommendations 2.1, 2.3 and 9.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentFukushima Dai-Ichi
ML12333A31527 November 2012Technical Specification Bases (Tsb) ChangesSurveillance Frequency Control Program
TAC:MF368926 November 2012
ML12347A25316 November 2012Attachment 6: Nttp 2.3 Seismic Peer Review Report Oconee Nuclear Station Units 1,2 and 3Safe Shutdown
Unanalyzed Condition
High Radiation Area
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Seismically rugged
Scaffolding
Seismic Walkdown Report
ML12333A31716 November 2012Response to Request for Additional Information for Time Limited Aging Analysis on Reactor Vessel InternalsLicense Renewal
Earthquake
Exclusive Use
Affidavit
IR 05000269/200600215 November 2012IR 05000269-06-002, IR 05000270/2006002, IR 05000287/2006002, 01/01/2006 - 03/31/2006; Oconee Nuclear Station, Units 1, 2, and 3; Other Activities, (Errata)Safe Shutdown
Boric Acid
Mission time
Fire Barrier
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Stress corrosion cracking
Operability Assessment
ML12314A43413 November 2012Request for Additional Information Regarding Amendment Application for a Revision to the Technical Specification on the Emergency Power SystemSafe Shutdown
ML12319A47912 November 2012Technical Specification Bases (Tsb) ChangesSafe Shutdown
Tornado Missile
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Battery sizing
ML12319A47812 November 2012Site - Core Operating Limits Report (COLR)Shutdown Margin
ML12314A2549 November 2012E-mail Oconee Nuclear Station, Units 2 & 3, Reactor Containment Building Test Extension, ME9777 & ME9778, Acceptance Review (E-mail)
ML13004A3658 November 2012Slides for Public Meeting on Mitigation Strategies for NRC Order EA-12-049High winds
Ultimate heat sink
Mission time
FLEX
Tornado Generated Missile
ML12321A0298 November 2012Notification of Deviation from EPRI Steam Generator Management Program: Pressurized Water Reactor Steam Generator Examination Guidelines, Revision 7, Section 6.3.3.2Stress corrosion cracking
Eddy Current Testing
ML12307A3697 November 2012Request for Additional Information Regarding Revision 18 to the Physical Security Plan (TAC No. D91660)
ML12312A0312 November 2012Licensing Basis for the Protected Service Water System - Responses to Request for Additional Information - Supplement 3Safe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML12307A3051 November 2012Confirmation of Requested Initial Operator License Examinations for Oconee Nuclear Station
IR 05000269/201200431 October 2012IR 05000269-12-004, 05000270-12-004, 05000287-12-004, 07/01/2012 - 09/30/2012, Oconee Nuclear Station, Units 1, 2 and 3, Fire ProtectionHot Short
Safe Shutdown
Unanalyzed Condition
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Fukushima Dai-Ichi
Significance Determination Process
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Annual Radiological Effluent Release Report
Fire Protection Program
Fire Watch
Downpower
ML12311A02831 October 2012Emergency Preparedness Information Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1,...
IR 05000369/201200431 October 2012IR 05000369-12-004, IR 05000370-12-004; 07/01/2012 - 09/30/2012; McGuire Nuclear Station; Licensed Operator Requalification ProgramFire Barrier
Functionality Assessment
Fukushima Dai-Ichi
Significance Determination Process
Job Performance Measure
Operability Determination
Offsite Circuit
Fire Protection Program
Unidentified leakage
TAC:ME987730 October 2012
ML12307A21930 October 2012License Amendment Request for Approval to Operate a Reverse Osmosis System to Remove Silica from the Borated Water Storage Tanks and Spent Fuel Pools During Unit Operation and Associated Proposed Tech Specs and Bases..Boric Acid
Anticipated operational occurrence
Incorporated by reference
Surveillance Frequency Control Program
Time Critical Operator Action