License Amendment Request Related to Keowee Hydro Units, Acceptance Review
ML12346A404
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/11/2012
From: Boska J
Plant Licensing Branch II
To: Alter K
Duke Energy Carolinas
Boska J
References
TAC ME9880, TAC ME9881, TAC ME9882
Download: ML12346A404 (1)


Text

From:

Boska, John To:

Alter, Kent R

Subject:

Oconee Nuclear Station, Units 1, 2, & 3, License Amendment Request Related to Keowee Hydro Units, Acceptance Review Date:

Tuesday, December 11, 2012 2:45:00 PM By letter dated October 30, 2012, Duke Energy Carolinas, LLC, submitted a license amendment request for Oconee Nuclear Station, Units 1, 2, and 3. This document is available from the Agencywide Documents Access and Management System as accession number ML12307A377. The proposed amendment would revise Technical Specification 3.8.1 to allow each Keowee Hydro Unit (which are the backup power supply for the Oconee Nuclear Station) to be inoperable for 45 days cumulative over a rolling 3 year time period. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to commence its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to commence its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at 301-415-2901.

John Boska Oconee Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission 301-415-2901 email: john.boska@nrc.gov