ML12341A11131 December 2012Correction to Safety Evaluation Pages Issued with Amendment No. 243 Dated 11/9/2012, Revise TS 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific CalculationAnticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
ML13151A45831 December 2012Radiological Environmental Monitoring Program 2012 Annual Report January 1, 2012 to December 31, 2012Chernobyl
ML13002A35421 December 2012Submittal of Evacuation Time Estimate Report
NLS2012134, Independent Spent Fuel Storage Installation Decommissioning Funding Plan17 December 2012Independent Spent Fuel Storage Installation Decommissioning Funding PlanDecommissioning Funding Plan
ML12349A20013 December 2012IR 05000298-13-002; 02/19/2012 - 03/15/2013; Cooper Nuclear Station - Notification of Inspection (NRC Inspection Report and Request for InformationCommercial Grade Dedication
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12318A16013 December 2012Issuance of Amendment No. 244, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation Schedule Milestone 6Safe Shutdown
Cyber Security
Fire Protection Program
NLS2012130, Problem Identification and Resolution P. 1(c) Substantive Cross-Cutting Issue13 December 2012Problem Identification and Resolution P. 1(c) Substantive Cross-Cutting Issue
ML12347A05912 December 2012Generic Fundamentals Section of the Written Operator Licensing ExamGeneric Fundamentals Examination
ML12347A30812 December 2012Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology
NLS2012127, Reply to Notice of Violation IR 05000298-12-004-02; EA-12-20610 December 2012Reply to Notice of Violation IR 05000298-12-004-02; EA-12-206Condition Adverse to Quality
Significance Determination Process
IR 05000298/20120086 December 2012IR 05000298-12-008, on 10/29 - 11/01/2012; Cooper Nuclear Station, Post-Approval Site Inspection for License RenewalAging Management
Significance Determination Process
License Renewal
ML12342A3736 December 2012Notification of Potential Part 21 Report Re ESI Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port
ML12338A2643 December 2012Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs
NLS2012135, Kld TR-520, Rev. 1, Cooper Nuclear Station, Development of Evacuation Time Estimates, Final Report30 November 2012Kld TR-520, Rev. 1, Cooper Nuclear Station, Development of Evacuation Time Estimates, Final Report
NLS2012125, Seismic Walkdown Report - Nebraska Public Power District'S Response to Nuclear Regulatory Commission Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Revie27 November 2012Seismic Walkdown Report - Nebraska Public Power District'S Response to Nuclear Regulatory Commission Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review.Fukushima Dai-Ichi
ML12340A26927 November 2012Engineering Evaluation 12-E18, Revision 0, Attachment C - Page 76 of 322
ML12340A26827 November 2012CNS Memo DED12-0003 Response to 10 CFR 50.54(f) Section 2.3 Seismic, Enclosing Engineering Evaluation 12-E18, Revision 0
ML12340A27327 November 2012Engineering Evaluation 12-E18, Revision 0, Attachment D - Area Walk-By ChecklistsSafe Shutdown
Fire Barrier
Scaffolding
ML12340A27527 November 2012Engineering Evaluation 12-E18, Revision 0, Attachment E Through JSafe Shutdown
Boric Acid
Time of Discovery
High winds
Mission time
Stroke time
Safe Shutdown Earthquake
Past operability
Probabilistic Risk Assessment
Operating Basis Earthquake
Functionality Assessment
Finite Element Analysis
FLEX
Aging Management
Earthquake
Scaffolding
ML12333A31927 November 2012Flooding Walkdown Report in Response to Nrc'S Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentFukushima Dai-Ichi
NLS2012124, Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report26 November 2012Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown ReportSafe Shutdown
Unanalyzed Condition
High winds
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML22346A05922 November 2012News Release-IV-22-014: NRC Names New Senior Resident Inspector at the Cooper Nuclear StationNew Resident Inspector
NLS2012122, Rev. 55 to Emergency Plan Implementing Procedures EPIP 5.7.6, Notification, Rev. 38 to EPIP 5.7.17, Dose Assessment, and Rev. 18 to EPIP 5.7COMMUN, Communications21 November 2012Rev. 55 to Emergency Plan Implementing Procedures EPIP 5.7.6, Notification, Rev. 38 to EPIP 5.7.17, Dose Assessment, and Rev. 18 to EPIP 5.7COMMUN, CommunicationsSafe Shutdown
Time of Discovery
Health Physics Network
High winds
Fire Barrier
Met Tower
Fukushima Dai-Ichi
Earthquake
Pressure Boundary Leakage
Minimum staff
Siren
ML12319A05521 November 2012Correction to Amendment No. 242 Technical Specification (TS) and Safety Evaluation, Revise TSs to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option aReactor Vessel Water Level
Post Accident Monitoring
Scram Discharge Volume
ML12340A52621 November 2012Emergency Plan Revisions and Emergency Plan Implementing Procedure, Rev. 55, EPIP 5.7.6, Notification, to Rev. 38, EPIP 5.7.17, Dose Assessment, Rev. 18, EPIP 5.7COMMUN, CommunicationsSafe Shutdown
Time of Discovery
Health Physics Network
High winds
Fire Barrier
Met Tower
B.5.b
Fukushima Dai-Ichi
Earthquake
Pressure Boundary Leakage
Minimum staff
Siren
ML12289A07115 November 2012Request for Withholding Information from Public Disclosure - 9/13/12 Affidavit Executed by L. Trosman, Global Nuclear Fuel - Americas LLC VSP-NPP-HP1-12-087 - Response to RAIs
ML12291A81315 November 2012Request for Withholding Information from Public Disclosure - 5/11/2007 Affidavit Executed by Thomas Smed, Studsvik Scandpower Gardel BWR-Cooper Nuclear Station Power Distribution Uncertainties
ML12285A14115 November 2012Request for Withholding Information from Public Disclosure - 4/25/12 Affidavit Executed by L. Trosman, Global Nuclear Fuel - Americas LLC GNF-A Report No. S-0000-0140-2518-R0-P
ML12314A27615 November 2012Relief Request RI-06, Revision 1, from ASME Code Requirements for Reactor Vessel Lower Head Circumferential and Meridian Welds, 4th 10-Year Inservice Inspection IntervalIncorporated by reference
ML12312A28114 November 2012Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating PlantsHot Short
Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Thermoset
Large early release frequency
Maintenance Rule Program
Power Operated Valves
Hardened vent
Fire Protection Program
Very Early Warning Fire Detection
IR 05000298/201240314 November 2012IR 05000298-12-403, 10/04/2012, Cooper Nuclear Station - NRC SecurityAffidavit
ML12314A3729 November 2012IR 05000298-12-004; 06/27/2012 - 09/26/2012; Cooper Nuclear Station, Integrated Resident and Regional Report; Equipment Alignment, Licensed Operator Requalification Program and Licensed Operator Performance, Maintenance Risk Assessments andSafe Shutdown
Mission time
Stroke time
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Corrosion bonding
Significance Determination Process
Earthquake
Maintenance Rule Program
Fuel cladding
Scaffolding
Power change
Coast down
ML12299A0929 November 2012Issuance of Amendment No. 243, Revise Technical Specification 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific CalculationSafe Shutdown
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Cyber Security
Fuel cladding
Fire Protection Program
ML12318A0418 November 2012Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly ValvesCommercial Grade Dedication
Condition Adverse to Quality
NLS2012121, Data from Metamic Coupon Sampling Program5 November 2012Data from Metamic Coupon Sampling Program
NLS2012119, Notification of Changes to Emergency Response Data System Data Point Library1 November 2012Notification of Changes to Emergency Response Data System Data Point LibraryReactor Vessel Water Level
TAC:MF000531 October 2012
NLS2012112, Nebraska Public Power District'S Response to the March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Recommendation 9.3 for Completing Emergency Communication Assessments31 October 2012Nebraska Public Power District'S Response to the March 12, 2012, Information Request Pursuant to 10 CFR 50.54(f) Recommendation 9.3 for Completing Emergency Communication AssessmentsSafe Shutdown
Health Physics Network
High winds
Met Tower
FLEX
Fukushima Dai-Ichi
NLS2012099, Response to Nuclear Regulatory Commission Request for Additional Information License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio31 October 2012Response to Nuclear Regulatory Commission Request for Additional Information License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power RatioMinimum Critical Power Ratio
ML12297A41030 October 201210 Draft Outline Comments
ML12297A45030 October 201210 Draft Ops TestShutdown Margin
Reactor Vessel Water Level
High Radiation Area
Half scram
Time to boil
Squib
Job Performance Measure
Overtravel
Earthquake
Power change
ML12297A45130 October 20122012-10 - Draft Ops Test Comments
ML12297A44330 October 201210 Draft Written Exam Comments
ML12297A40830 October 201210 Draft Outlines
ML12297A43930 October 20122012-10 Draft Written ExamSafe Shutdown
Fitness for Duty
Reactor Vessel Water Level
High Radiation Area
Half scram
Time to boil
Hydrostatic
Squib
Locked High Radiation Area
Rod Drop Event
Overtravel
Deep Dose Equivalent
Power change
Flow Induced Vibration
ML12348A56930 October 20122012-10 Post-Exam Comments
ML13101A41330 October 20122012-10 Exam Public Forms
ML12353A48530 October 201210 Final as Given Ops TestShutdown Margin
Reactor Vessel Water Level
High Radiation Area
Half scram
Time to boil
Squib
Job Performance Measure
Earthquake
Power change