|
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARNLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays ML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19219A1522019-07-22022 July 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0125, Rev. 0, Signal Converter Transmitter P/N SCT/4-20MA/4-20MA/24DC/-LIM-TA(DCM) ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19165A0272019-06-0505 June 2019 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0125-INT, Rev. 0 ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17114A0702017-04-13013 April 2017 Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards ML17090A3972017-03-28028 March 2017 Part-21 Notification - Willful Misconduct and Falsification of Records ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16321A4512016-10-21021 October 2016 Part 21 Reporting of Defects and Noncompliance ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16243A4722016-08-25025 August 2016 Part 21 Reporting of Defects and Noncompliance ML16139A8342016-05-10010 May 2016 Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833 ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14134A1212014-05-0909 May 2014 Notification of Potential Part 21 - Potential Defect in General Electric Type CR120AD Control Relays W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML14101A3432014-04-10010 April 2014 Notification of Part 21 - Potential Defect in General Electric Type CR120 AD Control Relays ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14069A4682014-03-0202 March 2014 Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13073A1072013-03-12012 March 2013 Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13024A0302013-01-0909 January 2013 MPR Associates Inc., Interim Report in Accordance with 10 CFR Part 21 ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12342A3732012-12-0606 December 2012 Notification of Potential Part 21 Report Re ESI Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12045A5272012-02-0303 February 2012 Part 21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR-0104, Rev. 0, NPPD Fuel Hose, P/N 2-01H-050-003 ML12038A0292012-02-0303 February 2012 Part 21 Report- Foreign Material Found in Emergency Diesel Generator High Pressure Fuel Hose ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld 2023-09-06
[Table view] Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML19295D7322019-10-11011 October 2019 Engine Systems, Inc. Report No. 10CFR21-0125, Rev. 1 - Signal Converter Transmitter ML19207A0562019-07-19019 July 2019 Engine Systems, Inc. - Part 21 Report 10CFR21-0125, Rev. 0, for a 10CFR21 Reportable Notification on a Signal Converter Transmitter ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML15217A3092015-08-0101 August 2015 Notification of Part 21 - Report Involving Limit Switches EA180 and EA170 Manufactured in a Specific Date Range ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV W3F1-2014-0026, Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation2014-04-11011 April 2014 Notification of Potential Part 21 Report of Time-Delay Relays Spurious Actuation ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13094A1772013-03-18018 March 2013 Notice to the U.S. Nuclear Regulatory Commission of a Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters Manufactured by Aaf ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13010A5182013-01-0909 January 2013 Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12342A3732012-12-0606 December 2012 Notification of Potential Part 21 Report Re ESI Refurbished Emergency Diesel Generator Cylinder Head with Foreign Material in Intake Port ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12045A5272012-02-0303 February 2012 Part 21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR-0104, Rev. 0, NPPD Fuel Hose, P/N 2-01H-050-003 ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm NLS2008101, 10 CFR 21 Notification - Identification of Defect2008-12-0202 December 2008 10 CFR 21 Notification - Identification of Defect ML0810701722008-04-0909 April 2008 Notification of Potential Part 21 Regarding Torus Immersion/Vapor Phase Coatings 2019-07-19
[Table view] |
Text
12/10612012 U.S. Nuclear Regulatory Commission Operations Center Event Report Pa,-e I Part 21 (PAR) Event# 48564 Rep Org: ENGINE SYSTEMS, INC Notification Date / Time: 12/06/2012 11:01 (EST)
Supplier: ENGINE SYSTEMS, INC Event Date I Time: 12/06/2012 (EST)
Last Modification: 12/06/2012 Region: 1 Docket #:
City: ROCKY MOUNT Agreement State: Yes County: License #:
State: NC NRC Notified by: TOM HORNER Notifications: ALAN BLAMEY R2DO HQ Ops Officer: BILL HUFFMAN RICK DEESE R4DO Emergency Class: NON EMERGENCY PART 21 GROUP E-MAIL 10 CFR Section:
21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE ESI REFURBISHED EMERGENCY DIESEL GENERATOR CYLINDER HEAD WITH FOREIGN MATERIAL IN INTAKE PORT The following information is a summary of a Part 21 Report from Engine Systems, Inc. (ESI) concerning a condition reportable under 10 CFR 21.
ESI reports that they received notification about foreign material found within a refurbished cylinder head supplied to the Cooper Nuclear Station by ESI. Specifically, Cooper discovered two hand tools (picks) within the intake port on the cylinder head. The tools were discovered by Cooper after installation of the head onto the diesel engine and while attempting to adjust the intake valve backlash.
ESI supplied the refurbished cylinder head for a Cooper-Bessemer KSV engine to Cooper Nuclear Station (Part Number 13-KSV-1 1-6, Serial Number 6K2201) in August 2010. The refurbishment activity was performed at the Cameron Compression (OEM) facility in Casper, Wyoming.
The most likely scenario is that the cylinder head was oriented with the inlet port facing up during installation of the valve spring keeper seals. After installation of the seals, the tools were placed on top of the cylinder head. It is presumed the tools fell into the inlet port and settled in the intake valve seating area. The tools are small in size (approximately 5 inches long with a 5/8 inch handle) and were not visible from the exterior of the head.
ESI considers this occurrence to be an isolated incident and that Cooper Nuclear Station is the only affected customer. Previous shipments of similar cylinder heads are not suspect.
MRL
. 12-06-12;11:13AM; # 1/ 5 la7 ENGINE SYSTEMS, INC.
175 Freight Road Telephone: 252/977-2720 Rocky Mount, NC 27804 Faxc 252/446-1134 TELEFAX Date: December 6, 2012 Company: NRC Operations Center Fax Number: 301/816-5151 Verification No.: 301/816-5100
Reference:
Report No. 10CFR21-0107, Rev. 0 From: Tom Homer Page: 1 of 5
Dear Sir:
Following this cover is a copy of our report 10CFR21-0107, Rev. 0, for a 10CFR21 reportable notification on a KSV cylinder head with foreign material in intake port for Nebraska Public Power District - Cooper Nuclear Station, P/N 13-KSV-1 1-6-RR.
A copy of this report will be mailed to the NRC Document Control Desk and to our affected nuclear customer.
Should you have questions, please let us know.
Sincerely, ENGINE SYSTEMS, INC.
Tom Homer Quality Assurance Manager Quality Performance With Pride
12-06-12;11:13AM; # 2/ 5 ENGINE SYSTEMS, INC.
nESI 175 Freight Road, Rocky Mount, NC 27804 Telephone: 252/977-2720 Fax: 252/446-1134 Report No. 10CFR21-0107 Rev. 0: 12/06/12 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT: KSV Cylinder Head with Foreign Material in Intake Port Part Number 13-KSV-11-6-RR SYSTEM: Emergency Diesel Generator CONCLUSION; Reportable in Accordance With 10CFR21 Prepared By: Date: /Z(/n/2 7 Engineering Manager Reviewed By: /k*2rzf Date: /2-6-12 Quality Assurance Manager Quality Performance With Pride
"12-06-12;11:13AM; # 3/ 5 Report No. 100FR21-0107 Record of Revisions Page: 1 of 1 REV DATE PAGE DESCRIPTION 0 12/06/12 Initial issue.
12-06-12;11':13AM; # 4/ 5 Report No. 100FR21-0107 Revision: 0 Date: 12/06/12 Page: 1 of 2 Component:
KSV Cylinder Head with Foreign Material in Intake Port, part number 13-KSV-1i1-6-RR Summery:
Engine Systems Inc. (ESI) began a 10CFR21 evaluation on 10/23/2012 after receiving notification from NPPD-Cooper Station relative to foreign material (FM) found within a refurbished cylinder head. NPPD discovered two (2) small hand tools (picks) within the intake port on a cylinder head that was refurbished by ESI. After installation of the head into the diesel engine and while attempting to adjust the intake valve lash, the tools were discovered (reference Entergy condition report CR-CNS-2012-07786).
The evaluation was concluded on 12/5/2012 and it was determined that this issue is a reportable defect as defined by 10CFR21. The tools prevented one of the intake valves from closing completely. This condition could have impacted operability of the diesel generator and prevented it from performing its safety related function.
Discussion:
ESI supplied a refurbished cylinder head for a'Cooper-Bessemer KSV diesel engine to the Cooper Nuclear Station (part number 13-KSV-11-6, serial number 6K2201) in August 2010. On October 22, 2012, the customer was installing the cylinder head and was not able to properly adjust intake valve lash. Upon further inspection, two (2) small tools were discovered in the intake port of the cylinder head. The tools were between one of the intake valves and the valve seat, thereby preventing the intake valve from closing completely.
L. Spring Retainer S. Carvrension Spring
- 2. Spring K"eegr Seal 6. Inlet valve
- 3. Spring Keeper 7. Exhaust Valve
- 4. YVlve Cuido 8. Valve $Sat In'sert FIGURE 1: KSV CYLINDER HEAD CROSS SECTION LOCATION OF HAND TOOLS
- 12-06-12;11:13AM; # 5/ 5 Report No. 100FR21-0107 Revision: 0 Date: 12/06/12 Page: 2 of 2 The picks found within the cylinder head are the type used to position the valve spring keeper seals (item 2 of Figure 1) during assembly of the valves within the head. The refurbishment activity was performed at the OEM's facility (Cameron Compression) in Casper, Wyoming. The most likely scenario is that the cylinder head was oriented with the inlet port facing up during installation of the valve spring keeper seals. After installation of the seals, the tools were placed on top of the cylinder head (in this case, the inlet port surface). It is presumed the tools fell into the inlet port and settled near the intake valve seating area. Because of the geometry of the intake port, the tools remained in this area after the head was rotated, The tools are small in size (approx. 5" long with 5/8" wide handles) and therefore they remained within the intake port cavity and were not visible from the exterior of the head.
Impact on Operability:
The presence of the tools in the intake port interfered with operation of an intake valve; specifically the valve was not allowed to close completely. This would have reduced the available compression in the affected cylinder thereby reducing the load carrying capability of the emergency diesel generator, If the tools were to have become dislodged during engine operation, it is possible that cylinder components could have been damaged, resulting in engine shutdown. In either scenario, the ability of the diesel generator to perform its safety related function could have been impacted.
Affected Users:
This occurrence is considered to be an isolated incident and therefore Cooper Nuclear Station is the only affected customer. Previous shipments of similar cylinder heads are not suspect.
Corrective Action:
This condition was discovered during installation of the cylinder head and was subsequently corrected by the customer prior to completing the diesel generator maintenance activity; therefore, no further action is required by the customer.
To prevent recurrence of this issue, ESI has added a step to the dedication process to perform an inspection of the cylinder head intake and exhaust ports upon completion of the assembly process and just prior to covering the ports for shipment.