NLS2012124 Enclosure NLS2012124 ENCLOSURE COOPER NUCLEAR STATION FLOODING WALKDOWN REPORT
H Nebraska Public Power District "Always there when you need us" CNS Memo 12-0002 To: Cooper Nuclear Station Licensing Department From: Cooper Nuclear Station Design Engineering Department CC: N/A Date: 11/26/2012 Re: Response to 10 CFR 50.54(f) Section 2.3 Flooding Validation and Acceptance of Vendor Provided Evaluations In response to the nuclear fuel damage at Fukushima Daiichi due to earthquake and subsequent tsunami, the United States Nuclear Regulatory Commission (NRC) is requesting information pursuant to Title 10 of the Code of Federal Regulations, Section 50.54 (f). As part of this request which is as defined in the Recommendation 2.3, Flooding, Enclosure 4 of the 50.54(f) Letter dated March 12, 2012, CNS was required to perform walkdowns to verify that plant features credited in the current licensing basis (CLB) for protection and mitigation from external flood events is available, functional, and properly maintained. In addition, the purpose of the walkdowns was to identify and address plant-specific degraded, non-conforming, or unanalyzed conditions (through the corrective action program) and associated APM (Available Physical Margin) and verify the adequacy of monitoring and maintenance procedures. This information was obtained in accordance with NEI 12-07, "Guidelines for Verification Walkdowns of Plant Flood Protection Features". This memo is being written for CNS Design Engineering to formally accept the walkdown packages, and final walkdown report as being technically accurate.
The walkdowns were developed with APM determined from 906', which is what CNS is committed to the NRC to protect up to. CNS licensing basis is 903'.
During the walkdowns many features were found to be non-conforming to the design basis. CR's were written for all non-conforming features as is stated in the NEI 12-07 guidance. DED determined whether the feature was deficient or not. If a feature was determined deficient, a recovery plan was created to correct the deficiency. These deficiencies are included in the Final Walkdown Report.
The attached walkdown packages and final walkdown report are found technically accurate with the CNS design and licensing bases and will be appropriate for a response to Recommendation 2.3, Flooding, of the 50.54(q Letter dated March 12, 2012. The information collected in this evaluation will not impact the existing design basis as recommendation 2.3 is a review of current CNS flood mitigation strategies. Any change to the licensing basis will come out of Recommendation 2.1 which will reference the material from Recommendation 2.3.
CNS Memo 12-0002 Revision 0 Page 1 of 2
ATTACHMENTS:
Final walkdown report Walkdown packages Walkdown team credentials CNS Design Engineer Matthew Nienaber
/if26 2ý CNS Design Engineering Brian T. Wolken Supervisor CNS Design Engineering IfZ~
Roman M. Estrada Manager CNS Memo DED 12-0002 Revision 0 Page 2 of 2
Page I of 36 CNS Flooding Walkdown Submittal Report LIST OF ACROMYMS Abbreviation Description AEC Atomic Energy Commission APM Available Physical Margin B&R Burns and Roe CA Corrective Action CAP Corrective Action Program CED Change Evaluation Document CFR Code of Federal Regulation CLB Current Licensing Basis CNS Cooper Nuclear Station COE Corps of Engineers(USACE)
CR Condition Report DB Design Basis ECCS Emergency Core Cooling System EE Engineering Evaluation ERP Elevated Release Point FSAR Final Safety Analysis Report HPCI High Pressure Core Injection IPEEE Individual Plant Examination of External Events IER INPO Industry Event Report MPF Multi-Purpose Facility MSL Mean Sea Level (based on NGVD29)
NGVD29 National Geodetic Vertical Datum of 1929 NEI Nuclear Energy Institute NPPD Nebraska Public Power District NRC Nuclear Regulatory Commission OWC Optimum Water Chemistry PM Preventative Maintenance PMF Probable Maximum Flood PMP Probable Maximum Precipitation PRA Probabilistic Risk Assessment RCA Radiological Controlled Area RCIC Reactor Core Injection Cooling RHR Residual Heat Removal RPS Reactor Protection System SER Safety Evaluation Report TRM Technical Requirements Manual TLCO Technical Requirements Manual Limiting Conditions of Operation URT Unit Reliability Team USACE United States Army Corps of Engineers USAR Updated Safety Analysis Report USNRC United States Nuclear Regulatory Commission Page 2 of 36
CNS Flooding Walkdown Submittal Report TABLE OF CONTENTS SCOPE AND OBJECTIVE ............................................................................................ 5 2 DESIGN BASIS FLOOD HAZARD LEVEL ............................................................... 6 2.1 Probable Maximum Flood (PMF) .......................................................................... 6 2.2 Postulated Dam Failure .......................................................................................... 6 2.3 Probable Maximum Precipitation (PMP) ............................................................... 7 2.4 Other Evaluated Flooding Events .......................................................................... 8 2.5 Original Supporting Evaluations and Methodology ............................................. 8 2.6 Other Analysis and Evaluations ............................................................................ 9 2.7 CLB Flooding Summary Table ............................................................................. 11 3 EXTERNAL FLOOD PROTECTION AND MITIGATION FEATURES ................. 12 3.1 Flood Licensing Basis and Protected SSCs ........................................................ 12 3.2 Plant Operation During Flooding ........................................................................ 13 3.3 Flood D uration .................................................................................................... 14 3.4 Flood Protection Features ..................................................................................... 15 3.5 Procedures ................................................................................................................ 16 3.6 Adverse Weather Conditions .............................................................................. 17 3.7 Groundwater Ingress .......................................................................................... 17 4 INTERNAL WARNING SYSTEMS ..................................... 18 5 EFFECTIVENESS OF FLOOD PROTECTION SYSTEMS ...................................... 22 5.1 A cceptance Criteria .............................................................................................. 22 5.2 Overall Effectiveness of Plant Flood Protection Features .................................. 23 5.3 Other Existing Plant SSCs and Procedures that May Provide Flood Mitigation ..... 23 6 IMPLEMENTATION OF WALKDOWNS ................................................................. 24 6.1 Walkdown Package Development ..................................................................... 24 6.2 Team O rganization .............................................................................................. 24 6.3 Training A pproach ............................................................................................. 25 6.4 Peer Review Process ........................................................................................... 25 7 WALKDOWN RESULTS ........................................................................................... 26 7.1 Incorporated or Exterior Passive Features .......................................................... 26 7.2 Incorporated or Exterior Active Features ............................................................ 27 7.3 Temporary Passive Features ................................................................................ 27 7.4 Temporary Active Features ................................................................................ 27 Page 3 of 36
CNS Flooding Walkdown Submittal Report 7.5 Procedural Review .............................................................................................. 28 7.6 Inaccessible Features ........................................................................................... 29 7.7 Deficient Features ................................................................................................ 29 7.8 D elayed Inspection Features ............................................................................... 32 8 AVAILABLE PHY SICA L M ARG IN .......................................................................... 33 9 NEW FLOOD PROTECTION SY STEM S ................................................................. 34 10 REFEREN CES ................................................................................................................. 35 10.1 Regulatory Docum ents, Codes and Guidance .................................................... 35 10.2 NPPD Docum ents ................................................................................................ 35 Page 4 of 36
CNS Flooding Walkdown Submittal Report 1 SCOPE AND OBJECTIVE This Flooding Walkdown Report is prepared in accordance with the request from the U.S.
Nuclear Regulatory Commission as defined in the Recommendation 2.3, Flooding, Enclosure 4 of the 50.54(f) Letter dated March 12, 2012.
In response to the nuclear fuel damage at Fukushima Daiichi due to earthquake and subsequent tsunami, the United States Nuclear Regulatory Commission (NRC) is requesting information pursuant to Title 10 of the Code of Federal Regulations, Section 50.54 (f). As part of this request, CNS was required to perform walkdowns to verify that plant features credited in the current licensing basis (CLB) for protection and mitigation from external flood events is available, functional, and properly maintained. In addition, the purpose of the walkdowns was to identify and address plant-specific degraded, non-conforming, or unanalyzed conditions (through the corrective action program) and associated APM (Available Physical Margin) and verify the adequacy of monitoring and maintenance procedures.
This information obtained and presented in this report is in accordance with NEI 12-07, "Guidelines for Verification Walkdowns of Plant Flood Protection Features" (Ref. 10.1.2) with no exceptions to the guidance. The scope of the report is further described in the subsequent sections of this document.
Page 5 of 36
CNS Flooding Walkdown Submittal Report 2 DESIGN BASIS FLOOD HAZARD LEVEL The CNS USAR (Ref. 10.2.2) Vol. II, Station Site and Environs, Hydrology Section 4.2.2.1 states that the maximum river level established by studies by the Corps of Engineers was at 899 ft MSL during the flood of record in 1952 prior to the installation of the upstream river controls. The USAR projected upper limit of elevation for a 1,000-year flood discharge is 900 ft MSL and for a 10,000-year flood discharge is 902 ft MSL.
2.1 Probable Maximum Flood (PMF)
The CNS USAR Section 4.2.2.1 states "....The ProbableMaximum Flood (PMF)is establishedat 903 feet MSL with a projected returnfrequency estimated to be in excess of 1,000,000 years. The PMF is derived by centering a probable maximum rainstorm critically over the drainageareaabove Brownville. The Corps of Engineershas estimated that the peak dischargefor the PMFis 600,000 cubicfeet per second. This estimate is based on a qualitativejudgment that the peak of a PMFevent should be between two to three times the peak of a standardprojectflood.Preliminaryestimates of standardproject conditions on the Missouri and PlatteRivers were used in estimating the probable maximum flood peak of 600,000 cfs at CNS. "
CNS USAR Vol. II - Section 4.2.2.2 states; " the stationsite grade level of903feet MSL has been raised 13feet above the naturalgradelevel of 890feet MSL, in order to bringfinal grade onefoot above the existing 902feet MSL levee constructed by the Corps ofEngineers.
This levee was raisedabove its originaldesign level andpresently has a threefoot minimum free board over the 1952flood of record(899feet MSL). Floodingof the station is considered to be extremely unlikely due to the combination of upstream Missouri River flood control and the high final site grade. With respect to the 1,000 year, 10,000 year and 1,000,000 year (PMF)floods, these water levels will provide 3 /2feet, 11/22feet,and 6 inches offreeboardrespectively below the 903'6" gradefloor elevation of the principle structures....... "
.... The wave
.. action discussed within Subsection 4.2.2.1 (6.7feet on a smooth vertical wall and 4.8feet on a riprappedslope), in conjunction with a PMFwill not affect the plantproper since the nearest building is located about 200feet from the river edge and is surroundedby grade to elevation 903'-0". Wave energy would be dissipatedbefore reachingany of the main buildings. Wave action at the Intake Structure will not affect the safe shutdown ofthe plant since the Service Water pumps and controls areprotected by massive reinforcedconcrete walls andslab up to elevation 919"-0" ...... "
".... The Atomic Energy Commission (AEC) staff independently evaluated theflooding potentialat CNS. They estimated PMFto be 901.2feet MSL, which concurrentwith wind effects would result in a maximum water level on the outside of the Intake Structure at 909.2 feet MSL (PMFplus wave effects) and 905 feet MSL (PMFplus surge effects) on other exposed safety relatedstructures. The AEC staff requiredprotection of safety related structures andsystems against these levels in order to ensure the capabilityto place and maintain the plant in a safe shutdown under theflooding conditions described above....
2.2 Postulated Dam Failure CNS USAR Section 4.2.2.1 states ". The failure ofa large upstream dam is not consideredprobable. These dams are massive earth structures with impervious core walls, Page 6 of 36
CNS Flooding Walkdown Submittal Report largefreeboardfor wave action, andadequatespillways. The dams are located in a zone of low seismic activity. The Gavins Point Dam, closest to the site is over 275 miles upstream. It is approximately 8,100feet long with a height of 74 feet. It is 35feet wide at the top and up to 850feet wide at the base. The top of the dam is at 1,234feet MSL with a water level of 1,205 feet MSL indicatinga freeboardof29 feet. Its storage capacity is approximately 500,000 acrefeet. These dams are under constant inspection by local Corps of Engineers personneland are inspected once a year by a team ofprofessionals.If seismicfailure occurredin spite of these circumstances,the failure would most probably be other than instantaneousfailureof a major portion of the dam. Under these circumstances,overtopping of Gavins PointDam, although conceivable, is not likely to occur.
The 901.2foot
....... MSL water surface elevation and the 905foot MSL (PMFplus surge effects for safety related structuresother than the Intake Structure) estimated by the AEC staff are below the 906foot MSL projectedfor the unlikely combination of an upstream dam failure concurrent with the maximum naturalflood .... "
2.3 Probable Maximum Precipitation (PMP)
CNS USAR Vol. II - Section 3.0 Meteorology, Sub-Section 3.1.3 Precipitation states U.S. Department
....... of Commerce - Weather Bureau and U.S. Department ofArmy Corps of Engineers,HydrometeorologicalReport No. 33 datedApril, 1956,from which it was determined that the "probablemaximum precipitation"for the site area,23.5 inches total rainfallfor a 24-hourperiod. This value has been determinedfrom Figure 17 (August) ofthe aforementionedreport. Converting this value to a rate equivalent to a one-hour rainfall, by using the Civil EngineeringBulletin No. 52-8, revised March, 1965, published by the Departmentof the Army, office of the Chiefof Engineers which determines a rainfallrateper hourfrom a 24-hourperiod,the "probablemaximum precipitation"forthe site area was conservatively determined to be 3.56 inches per hourfor a ten year returnperiod.... "
In addition, CNS USAR Vol. II - Section 3.0 Meteorological Design Bases, sub-section 3.2.3 Precipitation states; "....... Class land Class II buildings areprotectedfrom the effects of precipitationthrough the use ofroofdrains and overflow scuppers. The Reactor Building, Diesel GeneratorBuilding, and Control Building use 4 inch roofdrains and 6 inch scuppers.
Using the dischargerates in drainsprovided in the 1971 issue of the National Standard Plumbing Code, with fullflow from the vented systems, the roofdrainageand overflow capacityfrom these buildings can sustain a rainfallrate ofover 10 inches ofwater per hour.
The roofdrainsare designed to eventually be carriedthrough undergroundpiping into the MissouriRiver. The remaininglocal site drainageis designed such that any excess rainfall not immediately absorbed into the ground will flow awayfrom the buildings to be discharged into drywells or low lying areas adjacentto the plant site. Accordingly, these designs can safely remove the accumulatedwaterfrom the probable maximum precipitationrate described in Section 11-3.1.3, and can also accommodate the AEC 's estimated 9.7 in./hr in one hour rainfallrate without adverse effects on the safety-relatedsystems necessaryfor safe shutdown. "
Page 7 of 36
CNS Flooding Walkdown Submittal Report 2.4 Other Evaluated Flooding Events The CNS USAR and associated original FSAR question responses evaluated several other flooding events which were concluded as bounded by the establish PMF. These included:
Ice Blockage or Damming - The USAR Section 4.2.2.1 states" ... .Floodingcaused by ice blockage is consideredcredible only at riverlevels significantly lower than the PMF.
Floodingcaused by ice blockage would cause water surface elevations below those of the PMF."
> River Diversion Due to Flooding - USAR Vol. II, Section 4.2.3.2 states; "...afailure of the Oahe or Ft. Randallflood control dams is the most likely initiatorof a river diversion. The closer of the two, FortRandall, is almost 350 miles upstreamfrom the plant site and there would be a three day warning before the river reaches a peakflood stage at CNS. During this peakflood stage, shutdown procedures to the reactorcould begin and continue as the flood waters slowly recede. After the river diversion occurs, the resulting isolatedbody of water in the vicinity ofthe site,fed by ground water inflow, would retain essentially the same stage characteristicsthat apply to the present open river as long as the main channel was retainedin the existing valley. Minor variations resultingfrom elimination ofsome bends would be of no consequence to the safe operation of the plant. Extreme low water stages which might be attained in the natural channelwould not occur under these circumstances because ofthe lag in response of groundwaterto short term changes in the riverchannel. It is concluded, therefore, that there would be an adequatesupply of water to effect a safe shutdown of the plant."
2.5 Original Supporting Evaluations and Methodology Various supporting analysis and evaluations were performed during development of the original FSAR and follow up responses to original AEC review questions through amendment.
Corps of Engineers Study - According to FSAR Question No. 2.1 (Ref. 10.2.3) the USACE estimated a Probable Maximum Flood (PMF) elevation between 902-ft and 903-ft Mean Sea Level (MSL), in practice CNS typically regards 903-ft MSL as its PMF value. The USACE also calculated wave heights occurring coincident with the 903-ft MSL PMF event. It estimated a shallow water "significant wave height" of 4-ft, a "one-percent wave height" of 6.7-ft, and the "wave run-up" against a vertical wall (Intake Structure) of 6.7-ft. The calculation used a wind speed of 45 mph as prescribed by the NRC in FSAR Question No. 2.2 (Ref. 10.2.3). The response to FSAR Question No. 2.2 noted that the relationships used to estimate these wave heights were derived from studies made on lakes and oceans, and that it is not believed that waves of this magnitude could be generated in a river flood setting. The FSAR Question No. 2.2 response noted that waves could only impact the intake structure, with the run-up reaching an elevation of 909.7 ft MSL. The response states that wave energy would be dissipated before reaching the other Class I Buildings (Main Building Complex). The Main Building Complex is approximately 200' away from the river channel edge, with the surrounding grade elevated to 903 +/- ft MSL.
The USACE had reported (stated in CNS USAR Section 4.2.2.2) that a major dam break coincident with a PMF event was not credible; however, a maximum flow rate for a dam Page 8 of 36
CNS Flooding Walkdown Submittal Report break event and resulting surface water elevation was estimated. As described in the USAR, the maximum natural flood combined with a "...failure of a major flood control dam - either Oahe or Fort Randall" could produce river flows of 1,250,000 cfs. A water surface elevation based on this flow rate was predicted to reach elevation 906 ft MSL.
The evaluation did not consider wave action coincident with a 906 ft MSL flood event.
Atomic Energy Commission Study - As previously outlined in the USAR Section above, the Atomic Energy Commission reported in the Safety Evaluation Report (SER)
(Ref. 10.2.7) that its conservative estimation of the PMF Elevation at CNS was 901.2 ft MSL, based on a River flow rate of 1,000,000 cfs. AEC calculated coincident wave crests could reach an elevation of 909.2 ft MSL at the intake structure, and 905 ft MSL at the other structures across the site (located away from the river channel). The AEC also concluded that seismically induced dam failure coincident with a PMF is not credible but did consider a dam break concurrent with a 2 PMF event. Their results indicated that the resulting flood elevation was lower than the PMF event alone.
2.6 Other Analysis and Evaluations IPEEE -Individual Plant Examination of External Events In 1991, in accordance with 10CFR50.54(f), the NRC issued Generic Letter 88-20, Supplement 4 based on staff and industry experience with plant-specific probabilistic risk assessments (PRAs), that systematic examinations are beneficial in identifying plant-specific vulnerabilities to severe accidents which could be fixed with low-cost improvements. The supplement was focused on external events that could be significant contributors to core damage in some instances. Section 5 of the CNS IPEEE report (Ref.
10.2.9) submitted to the NRC addresses the occurrence of high winds, floods, and other weather related events with regard to probability of beyond design basis effects.
Potential Dam Failures - This section of the report states" The location of the upstream dams are listed together with their river mile in Table 5.8. Section 11-4.2.1 of the CNS USAR provides a discussion of dam failure scenarios.An analysis of the FortRandall Dam failure showed that waters releasedwould requireat leastfour days to reach the CNS site. If this event occurs, river elevations of 904 feet MSL would be expected, a maximum of 0.5 ft above the groundfloor elevation of 903.5 feet MSL. An emergency procedure is in place to install sandbagsand wood planks to combat theflood. Such actions are effective to protect the plant to water levels up to 907.6'. The procedure was successfully implemented at CNS during the flood in 1993. As such there is confidence in the ability of the plant staff andpersonnel to mitigate the flood event. The elevation of 906 feet MSL is calculated by postulatinga damfailure concurrent with the maximum naturalflood. The effects of wind generatedwave action in the determination of the water level at the plant site were not considered.
This is acceptablefrom previous discussions on the wave height development which concluded that wave height would substantiallydissipateprior to reachingthe plant structures.
Failureof the Oahe Dam upstreamfrom the Fort Randall Dam is discussed in NUREG/CR-4767. According to a recent study, the US. Army Corps ofEngineers Page 9 of 36
CNS Flooding Walkdown Submittal Report has estimated that a peak-water surface elevation of 922 feet MSL (18.5feet above groundfloor) will be reached if the Oahe Dam fails. It would take approximately 3.5 daysfor thefirstfloodwave resultingfrom the dam failure to reach CNS.
NUREG/CR-4767 based thefailurefrequency estimatefor the Oahe Dam on historicaldatafor internalfailuresof earth dams. Studies suggested that earth dams fail due to internalevents with afrequencyfrom 1.OE-OS/yr to 1.OE-04/yr. The NUREG analyses used 5. OE-05 per year as a best estimate. The District reviewed the supporting COE analyses and noted that a 100 year returnfrequency flood event at the Oahe dam site was assumed coincident with dam failure. Assuming that these independent events would have to occur during the same seven day periodand based on the conclusion that core damage would result from a flood to elevation 922feet MSL, the contribution to core damagefrequency due to the Oahe Damfailure was estimated as 9.OE-09/yr.
In the NUREG estimate it was conservatively assumed that the dam was completely full at the time of the failure (concurrentwith a spillway designflood) and that the dam was assumed to fail catastrophically.These two assumptions are very unlikely.
Additionally, the Oahe Dam and reservoirlevel is closely managed by the COE.
Therefore, it isjudged that this event can be screenedper NUREG-1407 andno further actions to reduce the CNS vulnerabilityto the Oahe Dam failure are warranted.... "
NPPD Calculation NEDC 11-076 In preparation for the NRC 50.54(f) response, CNS has directly developed and/or contracted the services of vendors to perform various evaluations and analysis of current potential flooding impact on the plant. These analyses do not change the plant's CLB but serve to provide significant information in support of the established PMF going forward.
Calculation NEDC 11-076 (Ref. 10.2.11) was developed for informational use only, to evaluate issues regarding CNS external flooding eventsas initiated by and described in condition report CR-CNS-2010- 01630. It was also utilized in the disposition of the CR's associated corrective actions CA-6, CA-8, CA-10, and CA- 11. The calculation evaluated against the hydraulic (i.e. stage discharge) of three scenarios including (1) an estimated 500-year event based on the peak flow reported in the Corps of Engineers 2004 Upper Mississippi Flood Frequency Study, (2) the Probable Maximum Flood event established in the CNS USAR, and (3) a Ft. Randall Dam Break Event at the Maximum High Pool Condition as provided by the Corps of Engineers. The calculation assumes that no levees failed during each flood scenario considered. CNS grade is elevated above the tops of adjacent levees, a conservative assumption in terms of maximum flood height (much larger flood area would be available behind the levees resulting in a lower flood level).
The calculation concluded that the predicted stage of the Missouri River estimated in the calculation compared favorably with the river stages determined during the stations original design. It was concluded that the river stage (water level) discussed in the USAR remains a conservative estimate for the flow scenarios considered with respect to this methodology. However, the flow scenarios themselves, while not discounted, could not be verified. A new PMF hydrologic study using current methodology was recommended Page 10 of 36
CNS Flooding Walkdown Submittal Report and is currently being performed in response to Recommendation 2.1, Flooding enclosure of the 50.54(f) Letter. This effort will also include reevaluation of the current site drainage when subjected to a PMP event. The PMP study is due to be completed before the end-of-year.
2.7 CLB Flooding Summary Table The below table summarizes the CNS CLB based upon the information as presented in this report.
PMF Peak Flow Rate' 600,000 CFS PMP Event centered above Brownville, NE PMF Still Water Plant site elevated 903 +/- ft MSL. First Floor of all Class Surface Elevation 903 ft MSL' I building at 903.5 ft MSL.
Flood Barriers not needed at intake since critical PMF + Wave Run Up equipment is elevated above 906 ft and protected from at Intake Structure 909.7 ft MSL wave impacts.
Class I buildings grade level openings at 903.5 ft MSL, PMF + Wave Action Protected by Flood Barriers from standing water to Main Plant Complex No Impact elevation 906 ft Notes:
I. The USACE estimated a higher river stage during the PMF than the AEC, despite the fact it used a lower flow rate (600,000 cfs vs. 1,000,000 cfs). Details of the methodology utilized by the AEC to develop its stage-flow relationship were not described, except for a statement in the SER text that the AEC constructed an "Analytical Model". The analysis conducted by CNS in 2011 is consistent with the USACE estimates stage-discharge estimates - see NEDC 11-076 (Ref. 10.2.11).
- 2. This elevation is based on a steady flow Rate of 600,000 cfs
- 3. This elevation is based on a peak flow rate of 1,000,000 cfs.
Therefore in summary, the Current Licensing Basis as stated in the CNS USAR provides for a value of 903.0 MSL for the Maximum Probable Flood.
Page 11 of 36
CNS Flooding Walkdown Submittal Report 3 EXTERNAL FLOOD PROTECTION AND MITIGATION FEATURES 3.1 Flood Licensing Basis and Protected SSCs The general ground elevation surrounding CNS Class I Structures is elevated 13-ft above the natural floodplain to 903 ft MSL. The finished floor elevation of all Class I Structures is placed at elevation 903.5 ft MSL, or 1/2 ft above the PMF event. These structures were designed for a hydraulic load equivalent to a groundwater elevation of 903-ft and reviewed for integrity for a river elevation up to 906 ft MSL. Grade level openings on exterior walls of the buildings (except for the intake structure) are protected from wave effects and water surface elevations up to 906 ft MSL with flood barriers erected per CNS Procedure 7.0.11 (Ref. 10.2.14) and 5.1 Flood (Ref. 10.2.13).
The following CNS safety-related plant structures have been identified as protected from flooding as noted:
Intake Structure - As stated in the USAR; the service water motors and controls in the Intake Structure are located above elevation 908-ft MSL. These motors and controls are protected from the predicted wave effects by 24-in thick concrete walls extending up to elevation 919-ft MSL. The Intake Structure need not be isolated due to the fact that there is no essential equipment located there at or below 906 ft MSL that will be adversely affected in performance of a safe shutdown function in the event of flooding.
Reactor Building - Protected from wave effects and flood water by grade level building walls and by temporary flood barriers to elevation 906 ft MSL Emergency Diesel Generator Building - Protected from wave effects and flood water by grade level building walls and by temporary flood barriers to elevation 906 ft MSL Radwaste Building - Protected from wave effects and flood water by grade level building walls and by temporary flood barriers to elevation 906 ft MSL Control Building - Protected from wave effects and flood water by grade level building walls and by temporary flood barriers to elevation 906 ft MSL Controlled Corridor - Protected from flood water by grade level Reactor and Turbine Building walls to elevation 906 ft MSL Turbine Building - Protected from wave effects and flood water by grade level building walls and by temporary flood barriers to elevation 906 ft MSL Z-Sump (Below ERP Tower) - As stated in the USAR; the top of floor drain sump Z, at the base of the Elevated Release Point tower, is located at 891 ft MSL and therefore is within postulated flood levels. The Z Sump contains equipment essential to the operation of SGTS (Standby Gas Treatment System), and therefore the sump must remain functional whenever Secondary Containment is required. Although the ground elevation at the sump is only 890 ft MSL, the Z Sump will not be affected by flooding since the sump penetrations are sealed and the proper functioning of the sump is monitored when flood levels reach 890 ft MSL.
Diesel Fuel Storage Tanks - As stated in the USAR; there is sufficient fuel in the Diesel Oil Storage Tanks to assure seven days of operation of a single diesel generator powering a single critical division of safe shutdown loads. This time duration is sufficient to obtain more Page 12 of 36
CNS Flooding Walkdown Submittal Report fuel, if needed. The two storage tanks are buried and their appendages are protected by a substantial cover. The manholes providing access to the Diesel Oil Transfer Pumps, the capped fill connections and the tank vents are all located above 906 ft MSL. The design and installation of the tanks assure flotation does not occur when empty during the PMF.
The following CNS plant structures have been identified as important to the protection of the various safety-related structures and equipment and are also protected from flooding as noted:
Augmented Radwaste Building - Protected from wave effects and flood water by grade level building walls and by temporary flood barriers to elevation 906 ft MSL Boiler Room - Protected from wave effects and flood water by grade level building foundation walls and by temporary flood barriers to elevation 906 ft MSL Fan Room - Protected from wave effects and flood water by grade level building foundation walls and by temporary flood barriers to elevation 906 ft MSL Water Treatment Plant - Protected from wave effects and flood water by grade level building foundation walls and by temporary flood barriers to elevation 906 ft MSL Tool Crib - Protected from wave effects and flood water by grade level building foundation walls and by temporary flood barriers to elevation 906 ft MSL Machine Shop - Protected from wave effects and flood water by grade level building foundation walls and by temporary flood barriers to elevation 906 ft MSL MPF Building - Protected from wave effects and flood water by grade level building foundation walls and by temporary flood barriers to elevation 906 ft MSL Other Site Structures - Various site out buildings and structures classified as not important to safe operation and shutdown of the plant are located at base elevations lower than the PMF elevation of 903 ft MSL. CNS Procedure 5.1 FLOOD, evaluation of the protection these assets is determined by NPPD plant management by implementing actions based on various parameters including; plant safety, asset value, importance to overall long term power generation, etc.
3.2 Plant Operation During Flooding The operation of the plant based on a forecasted or eminent flooding event is addressed by CNS TRM (Technical Requirements Manual) Section T 3.7 Plant Systems, sub-section T3.7.1 River Level, limiting condition of operation TLCO 3.7.1. TLCO 3.7.1 states, "The River Level shall be < 895 ft MSL and not forecast to be> 902 ft MSL" at all times.
Page 13 of 36
CNS Flooding Walkdown Submittal Report The conditions are set as follows:
CONDITION REQUIRED ACTION COMPLETION TIME A. River level is > 895 ft MSL A. 1 Implement CNS Site Flood Immediately Procedure 5.1 FLOOD B. River Level is > 902 ft MSL B. 1 Implement CNS Site Flood Immediately or forecast Ž_902 ft MSL Procedure 5.1 FLOOD.
within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
AND B.2 Be in MODE 3 (Hot 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Shutdown)
AND B.3 Be in MODE 4 (Cold 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Shutdown)
The TRM BASES states:
The river level of the Missouri River is controlled by the U.S. Army Corps of Engineers using dams. The closest upstream major flood control dam is approximately 350 miles upstream. The use of these dams reduces the possibility of a site flood. However, should a dam break or in case of a river level of 895 ft MSL, the CNS Site Flood Procedure will be put into effect.
Should the level reach 902 ft MSL or a forecast issued by the official government agency indicates expected levels of 902 ft MSL or greater within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, the reactor will be shutdown and vented to atmosphere.
A plant shutdown is initiated under any of the following conditions:
- 1. Floodwaters either reach 902 ft MSL, or are forecast to reach 902 ft MSL within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (as from the 10,000 year flood or an upstream dam failure).
- 2. Floodwater accumulates in either Diesel Generator Room, any of the four Reactor Building Quads, or the Control Building Basement.
- 3. Plant conditions warrant reactor to be shut down.
3.3 Flood Duration There is no specifically stated time(s) associated with the PMF event provided within the CNS CLB. CNS USAR Figure 11-4-7, Platte Plus Missouri River (s) Hydrograph, displays the projected river discharge at Cooper Nuclear Station for the PMF in Time in Days versus CFS. Inspection of the hydrograph indicates an approximate duration of 5 1/22 days of flood conditions may be expected from a river flow of 200,000 CFS peaking to 600,000 CFS and back down to 200,000 CFS. Initial inspection of USAR Figure 11-4-8, Estimated Stage Discharge Relation Missouri River at Brownville Nebraska, would correlate to an Page 14 of 36
CNS Flooding Walkdown Submittal Report approximate minimum flood level of 895 ft MSL to the maximum projected PMF value at CNS.
3.4 Flood Protection Features Various methods of protection are specifically detailed within the CNS USAR Section 4.2.2.2 as to the plant's response to an imminent flooding event. The USAR states that material and equipment necessary to perform these protective measures are available at CNS and inventoried on an annual basis. As an example; special equipment includes; two portable gasoline powered pumps and 100 ft minimum (per pump) of 2 1/2/2-inch non-collapsible hose.
The CNS USAR specifically addresses various actions that will be taken to protect safety related SSCs located below the PMF plus wave effects level of 905 ft MSL. The original response to FSAR Question 2.34, Amendment 17 (Ref. 10.2.5) identified specific equipment and components to be protected including the:
" RHR Service Water Booster pumps located at Elevation 882'-6" MSL in the Control Building basement.
" RHR pumps 1A and IC in the northwest quadrant room of the Reactor Building at Elevation 859-'9" MSL.
" RHR pumps 113 and ID in the southwest quadrant room of the Reactor building at Elevation 859-'9" MSL.
- RCIC turbine pump set in the northeast quadrant room of the Reactor building at Elevation 859-'9" MSL.
" Diesel generator water tight junction boxes at Elevation 904' MSL.
- D.C. switchgear and battery chargers in Control Building 903'-6" level at less than 905' MSL.
- RPS M-G set at the 903'-6" level of the Control Building.
Building Features A comprehensive review of all potential CNS external flood barriers and features as originally defined in Regulatory Guide 1.102 (Ref. 10. 1.3) was performed by reviewing all available plant drawings and documentation and performing initial walk downs of all accessible plant areas. These barriers/features include the permanent flood protection provided by the structural walls, penetrations, doors, hatches, water-stops incorporated in the construction of the penetrations and construction joints, special rubber boots, and other related barriers. Temporary flood protection, such as sand bagging, stop logs for specific areas and openings as needed were also included.
The following is a breakdown by area of the number of flood barriers/features identified during the development of the features database contained in the Flood Walkdown CNS DED Correspondence 12-0002 (Ref. 10.2.19) and confirmed by the formal feature walkdown process:
" Turbine Building - 22 Exterior building walls and 76 piping and conduit penetrations
" Radwaste Building - 11 Exterior building walls and 32 piping and conduit penetrations Page 15 of 36
CNS Flooding Walkdown Submittal Report
- Augmented Radwaste Building - 13 Exterior building walls and 27 piping and conduit penetrations
- Reactor Building - 12 Exterior building walls and 15 piping and conduit penetrations
" Control Building - 9 Exterior building walls and 65 piping and conduit penetrations
- Machine Shop - 2 Exterior building walls and 6 piping and conduit penetrations
" Water Treatment Building - 2 Exterior building walls and 23 piping and conduit penetrations
" Exhaust Fan Room - 2 Exterior building walls and 2 piping penetrations
- Heating Boiler Room- 1 Exterior building walls and 8 piping penetrations
" Emergency Diesel Generator Rooms - 8 Exterior building walls and 31 conduit penetrations
" Intake Structure - 4 Building walls
- Site:
> Manholes - 9 conduit penetrations
> Z Sump - I conduit penetration
" Temporary Features:
> Exterior barrier walls/stop logs - 44
" Site Drainage System:
> Dry Wells- II
> Catch Basins - 7
> Area Inlets - 20 3.5 Procedures CNS has established two primary procedures for guidance in the station's response to an external flooding event.
- 5. IFLOOD - This is the primary procedure used for response to river level increase and is entered at a rising river level of greater than or equal to 895 ft MSL, notification of upstream dam failure and/or the river level is forecast to rise above a greater than or equal to value of 902 ft MSL within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The procedure invokes numerous flood response measures and activities in addition to the other main response procedure 7.0.11 Flood Control Barriers (Ref. 10.2.14) which directs the CNS Maintenance department in the installation of temporary flood control barriers and features.
This procedure requires specific review during formal Flooding Walkdown Inspections performed in accordance with NEI 12-07 activities to evaluate the practicality of the associated actions performed by site personnel with regard to response timing and equipment staging and implementation.
7.0.11, FLOOD CONTROL BARRIERS - As mentioned previously this Maintenance Procedure directs the CNS maintenance personnel in the installation of temporary flood control barriers and features. The procedure provides a system of primary barriers at the openings of the outside walls of the main buildings complex to seal the buildings up to elevation 906 ft MSL. Secondary barriers are provided strategically inside the buildings to Page 16 of 36
CNS Flooding Walkdown Submittal Report control any minor leakage past the primary barriers and to break the building complex up into small areas that can be more easily protected.
3.6 Adverse Weather Conditions Emergency Procedure 5.1FLOOD and other supporting procedures and documents do not specifically address the intensity of potential adverse weather conditions on the execution or deployment of external flood mitigation activities. The procedures do however provide for the assessment of the severity of conditions which may lead to immediate actions to bring the plant to cold shutdown in a timely manner.
Adverse weather is not an aspect of CNS site design basis. The worst expected weather would be heavy rainfall which will not be a hindrance to stop log barrier construction.
These activities are well established and practiced using procedures and standard physical measures (addressed further in Section 7.5) that can be implemented based on their simplistic nature and design.
3.7 Groundwater Ingress The CNS CLB does not specifically address or quantify ground water inleakage from the site subsurface water table. Groundwater level is monitored/logged once per shift based on level indication located within site well(s) providing plant water supply. According to CNS OPS personnel, site groundwater level normally fluctuates between 875' MSL to 885' MSL with the highest recorded level of 900.8' during the 2011 May flooding event.
USAR Section XII-2.4.4.2 (Ref. 10.2.20) Design Considerations, Statement 5 second to last paragraph states, ".... Where penetrationsenter buildings through sleeves; details relating to the methods of waterproofingandmaintaining buildingintegrity have been developed.".
The above statement is based on CNS original response to FSAR Question/Answer 12.2 Amendment #9 (Ref. 10.2.2 1) which states, "........Membrane waterproofingmaterialused on the exteriorfoundation walls of the Reactor, Turbine, Control and Radwaste Buildings is the same as describedin the answer to Question 12.1 with the exception that integrally moldedprotrusionswere used to obtain a cast-in-place barrierwith the concretefoundation wall. This barrierwas sealed at the top just below grade into a reglet, and at the bottom was sealed to the mat material by the same adhesives and tape strips outlined in the answer to Question 12.1. With respect to in-service inspection of the vertical waterproofingbarrierthe same controlled applicationas describedin the answer to Question 12.1 is applicable, except that the 2 inch protective cover has been deleted. Therefore, no provisionshave been made to check the integrity of the membrane during the life of the plant. Drainsare provided in the base slab ofall buildings to collect any water which may accumulate on the slabfor any reaso n........................................................................................................................................
Where penetrationsenter buildings through sleeves, details relatingto the methods of waterproofingand maintainingbuilding integrity have been developed and are shown in Figure 12.2-1. "
(Note: Figure 12.2-1 is CNS B & R Drawing 2299 (Ref. 10.2.22).)
Page 17 of 36
CNS Flooding Walkdown Submittal Report 4 INTERNAL WARNING SYSTEMS Currently there are no official plant internal warning systems dedicated specifically to detection of water infiltration related to an External Flooding Event in the current licensing basis. However various level alarms are provided for sumps, low building elevations and yard manholes which provide annunciation in the CNS Control Room (Panel B-3 and S-1 annunciator windows). These include the following: (Note: All reactor building and turbine building sumps are HI-HI alarms which signal the control room at the setpoint when one pump is overloaded and will concurrently call the second pump into service)
Reactor Building Sumps - EL. 859'-9" Sump 1-A: is located in the RHR Pump Room in northwest Quad of the Reactor Building at elevation 859'-9". The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Reactor Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps (1-SP- lA1 & 1-SP- 1A2) which controls sump water level with discharge to the radioactive floor drain line (FDR-1). Setpoint is 34" of water in the sumnp.
" Sump I-B: is located in the Core Spray Pump Room in northeast Quad of the Reactor Building at elevation 859'-9". The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Reactor Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A.
The sump contains dual sump pumps (l-SP- IBI & I-SP- 1B2) which controls sump water level with discharge to the radioactive floor drain line (FDR-1). Setpoint is 34" of water in the sump.
" Sump 1-C: is located in the RHR Pump Room in southeast Quad of the Reactor Building at elevation 859'-9". The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Reactor Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps (1-SP- ICI & l-SP- 1C2) which controls sump water level with discharge to the radioactive floor drain line (FDR-1). Setpoint is 34" of water in the sump.
" Sump l-D: is located in the Core Spray Pump Room in southeast Quad of the Reactor Building at elevation 859'-9". The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Reactor Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A.
The sump contains dual sump pumps (l-SP- IDI & l-SP- 1D2) which controls sump water level with discharge to the radioactive floor drain line (FDR-1). Setpoint is 34" of water in the sump.
Sump 1-E: is located in the Core Spray Pump Room in southeast Quad of the Reactor Building at elevation 859'-9". The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Reactor Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A.
The sump contains dual sump pumps (l-SP- IEI & 1-SP- 1E2) which controls sump water level with discharge to the radioactive floor drain line (PW-1). Setpoint is 24" of water in the sump.
Page 18 of 36
CNS Flooding Walkdown Submittal Report Turbine Building Sumps - Basement (EL. 882'-6")
Sump I M: is located in the northeast comer of the Turbine Generator Equipment Area at elevation 882'-6" in the bay between column lines 14-E and 14-F. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Turbine Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the non-radioactive floor drain line (FDN- 1).
Setpoint is at 3'6" of water in the sump.
- Sump I P: is located in the northwest comer of the Turbine Generator Equipment Area at elevation 882'-6" in the bay between column lines 14-F and 14-G. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Turbine Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the radioactive floor drain line (PW-2).
Setpoint is at 3'6" of water in the sump.
Sump 1Q: is located in the northeast comer of the Turbine Generator Equipment Area at elevation 882'-6" in the bay between column lines 14-E and 14-F. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Turbine Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the radioactive floor drain line (FDR-2).
Setpoint is at 3'6" of water in the sump.
" Sump IR: is located in the northeast comer of the Turbine Generator Equipment Area at elevation 882'-6" in the bay between column lines 14-C and 14-D. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Turbine Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the radioactive floor drain line (FDR-2).
Setpoint is at 3'6" of water in the sump.
- Sump 1S: is located in the southwest comer of the Turbine Building Hold-up Decontamination & Sample Room at elevation 882'-6" in the bay between column lines 7-G and 7-F. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Turbine Building , noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the radioactive floor drain line (FDR-2). Setpoint is at 3'6" of water in the sump.
" SumpI T: is located in the southwest comer of the Turbine Generator Equipment Area at elevation 882'-6" in the bay between column lines 7-C and 7-D. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Turbine Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the radioactive floor drain line (PW-2).
Setpoint is at 3'6" of water in the sump.
Page 19 of 36
CNS Flooding Walkdown Submittal Report Sump IU: is located in the southeast comer of the Turbine Building Equipment Area at elevation 882'-6" in the bay between column lines 5-C and 6-C. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Turbine Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the non-radioactive floor drain line (FDN-1).
Setpoint is at 3'6" of water in the sump.
Sump IV: is located in the southeast comer of the Turbine Building Equipment Area at elevation 882'-6" in the bay between column lines 5-G and 6-G. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Turbine Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the non-radioactive floor drain line (FDN-1).
Setpoint is at 3'6" of water in the sump.
Diesel Building Sumps - EL. 903'-6" Sump DG- 1: is located in the northeast comer of the Diesel Generator Equipment Room at elevation 903'-6" in the bay between column lines 15.5-B and 15.5-B.4. The sump receives discharge from various plumbing fixtures and floor drains located on the main floor of the Diesel Generator Building. The sump contains a single sump pump which controls sump water level with discharge to the non-radioactive floor drain line (FDN-1).
Setpoint is at 30" of water in the sump.
Sump DG-2: is located in the northeast comer of the Diesel Generator Equipment Room at elevation 903'-6" in the bay between column lines 12.8-B and 12.8-B.4. The sump receives discharge from various plumbing fixtures and floor drains located on the main floor of the Diesel Generator Building. The sump contains a single sump pump which controls sump water level with discharge to the non-radioactive floor drain line (FDN- 1).
Setpoint is at 30" of water in the sump.
Control Building Sumps - Basement (EL. 882'-6")
" Sump 1L: is located in the northeast comer of the Emergency Condensate Storage Area at elevation 877'-6" in the bay between column lines 15.4-J.8 and 16.2-J.8. The sump receives discharge from various plumbing fixtures and floor drains located on multiple elevations of the Control Building, noted in CNS Procedure 2.2.27 "Equipment, Floor, and Chemical Drain System", Attachment A. The sump contains dual sump pumps which controls sump water level with discharge to the non-radioactive floor drain line (FDN-1). Setpoint is at 3'6" of water in the sump.
- Sump 1X: Control Building Electrical Vault Sump is located in the southeast comer of manhole C2 sump of the Control Building at elevation 882'-6". The sump receives discharge from the adjacent electrical vaults (P2, C3, & P3). The sump contains a single sump pump (l-X) which controls sump water level with normal discharge to the non-radioactive floor drain line (FDN-1). Setpoint is at 2' of water in the sump.
Page 20 of 36
CNS Flooding Walkdown Submittal Report Yard Manhole Sumps -EL. 903'-6" Sump 1W: is located along the east side of the Diesel Generator Building at elevation 903'-6". The sump is located at the base of electrical manhole C3 and receives discharge from the adjacent electrical manhole P3. The sump contains a single sump pump (I -W) which controls sump water level with normal discharge to the roof drain line (RD-2).
Setpoint is at 2' of water in the sump.
Sump 1Y: is located along the east side of the Diesel Generator Building at elevation 903'-6". The sump is located at the base of electrical manhole C4 and receives discharge from the adjacent electrical manhole P4. The sump contains a single sump pump (l-Y) which controls sump water level with normal discharge to the roof drain line (RD-2).
Reactor Building Torus Area - EL. 859'-9" Level alarm / indication is located at the basement elevation of the Torus area to indicate water accumulation. The alarm will sound in the control room when 4" have accumulated.
Control Building Level - Basement (EL. 882'-6")
Level alarm / indication is located at the basement elevation of the Control Building to indicate water accumulation. Alarms are sent to the control room at 2", 5" and 8".
Z-Sump Trouble (EL. 890'-0")
Z-sump is located at 890' at the base of the ERP tower. Setpoint is at 3' - 9" of water in the sump or loss of power to ZI sump pump and essential controls or loss of power to Z2 sump pump and essential controls.
Operator Rounds Normal plant operator rounds also provide for detection of water inleakage within the various areas of the plant. This is being a manual mechanism in the overall effort of providing warning of external water inleakage or potential flooding.
Page 21 of 36
CNS Flooding Walkdown Submittal Report 5 EFFECTIVENESS OF FLOOD PROTECTION SYSTEMS As outlined previously, the various CNS flood protection systems are comprised of numerous features including the building external structural walls, penetrations, doors, hatches, water-stops incorporated in the construction of the penetrations and construction joints, special rubber boots, and other related barriers. Temporary flood protection, such as sand bagging, aluminum stop logs for specific areas and openings, as needed, are also utilized for the mitigation of external flooding. The purpose of the flood features walkdown was to verify the conformance of external flood features with the CLB. In addition to visual inspection of features, a review of their associated preventative maintenance and surveillance programs was performed as applicable in all to determine overall effectiveness of the CNS to external flooding.
5.1 Acceptance Criteria The acceptance criteria for the walkdowns are described in Section 6 of the NEI 12-07 guidance. This approach is consistent with Requested Information Item 1.h. from the Recommendation 2.3 Flooding Enclosure of the 50.54(f) Letter. Acceptance Criteria was delineated within each associated CNS Walkdown Package specific to the features addressed for that plant area.
The detailed Inspection Methodology & Acceptance Criteria Checklist included the following:
Incorporated or Exterior Passive Features
" Penetration Seal
" Concrete or Steel Barrier Bldg. Structures
" Piping and Cable Manholes/Vaults/Tunnels
- Earthen Exterior Site Barrier
- Site Area Drainage Systems and Catch Basins Incorporated or Exterior Active Features
- Flood Barrier Doors
" Pumps
" Water Level Indication
" Back Flow Valves Temporary Passive Features 0 Portable Flood Barriers Temporary Active Features
- Pumps and Related Accessories The specific acceptance criteria associated with each of the above categories was listed directly across for each feature type within the checklist. The criteria considered the following:
" Flood protection configuration is in accordance with as-built drawings, as-built installation records, inspection records, vendor documents, etc.
- Visual inspection does not identify any material degradation Page 22 of 36
CNS Flooding Walkdown Submittal Report In addition, the specific licensing and design basis information required to support evaluation of the various features was also included within each applicable Walkdown Package.
Observations that identified various features as having potential deficiencies were evaluated in accordance with the CNS Corrective Action Program (CAP). A CNS condition report (CR) was assigned to each specific feature as identified. The CR process provides for an assessment of the features condition to determine whether the feature can meet its required licensing / design basis function(s). Features determined by the CAP to be deficient are presented in Section 7.7 of this report.
5.2 Overall Effectiveness of Plant Flood Protection Features Overall assessment of the current CNS external flood protection system included the features as previously noted. The general ground elevation surrounding the CNS Class I Structures is elevated 13-ft above the natural floodplain to 903 feet MSL. The finished floor elevation of all Class I Structures is placed at elevation 903.5 feet MSL, or 1/2 feet above the PMF event.
These structures were designed for a hydraulic load equivalent to a groundwater elevation of 903-ft and reviewed for integrity for a river elevation up to 906 feet MSL. Grade level openings on exterior walls of the buildings (except for the intake structure) are protected up to 906 feet MSL. In addition to permanent features, temporary harden flood barriers (aluminum stop logs, etc.) are also erected per CNS Procedure to protect doorways and normal access opening within structures from a PMF.
Recent flooding experienced by CNS during the 2011 overflow of the Upper Mississippi River Basin including the Missouri River (approximately 901 ft MSL) has provided significant evidence as to the effectiveness of the current level of protection at CNS.
Section 7 of this report provides a detailed discussion of the results from the flood features and procedures walkdown assessment.
5.3 Other Existing Plant SSCs and Procedures that May Provide Flood Mitigation The current basis for protection and mitigation of an external flooding event, including plant equipment, structures, and procedures, is discussed in Section 3 of this report. No other existing plant equipment, structures, or procedures were identified as being able to mitigate an external flooding event than that which are not already credited in the CLB.
It is important to note however that various other features not credited by CNS for mitigation during a PMF provide protection from flooding. These features include rejection of ground water infiltration within the lower elevations of the Class I and II structures by sump pumps (previously described in Section 4) and various berms / levees located within the perimeters of the site boundaries.
Page 23 of 36
CNS Flooding Walkdown Submittal Report 6 IMPLEMENTATION OF WALKDOWNS Implementation of the Flooding Inspection Walkdowns was performed in accordance with NEI-12-07, Rev 0-A Guidance with no exceptions.
6.1 Walkdown Package Development Documentation for conducting the Walkdowns was developed in accordance with NEI 12-07 to incorporate both generic and site-specific information. The Walkdown Packages were developed specific to various areas of the plant considering; building area and elevation, accessibility during plant operation, radiological conditions, procedure or barrier/feature, active versus passive, and permanent versus temporary.
The following elements were addressed and/or included as part of the Walkdowns packages in accordance with NEI 12-07 Guidance Document:
- Pre-Job Training and Brief- As outlined in Section 5.4 of the guidance
- Walkdown Guidance and Acceptance Criteria - Guidance and documentation for the conduct of the Walkdowns developed to incorporate both generic and site-specific infornation. The technical members of the Walkdowns teams first performed reviews of design and licensing documents and site procedures directly provided or referenced in each specific Walkdown Package to establish the flood protection CLB for the subject items identified.
" Walkdown Record - Part A and B of the Walkdown Record Form (NEI 12-07, Appendix B) was prepared for all flood protection features that fell within the scope of the guidance were and completed prior to the actual physical Walkdowns inspections. The balance of the form Parts C & E were completed during the walkdown process.
" Design Drawings and General Arrangement Drawings - This information was obtained from the original CLB and design basis scoping efforts and development of an Adobe Drawing Navigation File. Specific drawing close-ups and details of the subject flood barrier/penetration/feature were included in each package.
" Flood Protection Strategy Implementation Procedures - Part D of the Walkdown Record Form (NEI 12-07, Appendix B) was prepared for all applicable procedural documents.
" Inclusion of digital photos and other field obtained information - A minimum of 1 photograph was provided for each penetration/ barrier/feature along with various observation notes and sketches as applicable to the detail require for any specific feature.
The results of all final Walkdown Package information were electronically scanned and provided as a Quality record within the CNS engineering document files and Engineering Memo 12-002 (Ref. 10.2.19).
6.2 Team Organization The Walkdown Teams were formed based on Section 5.3 of the guidance in NEI 12-07. Two sets of walkdown teams were assembled in order to more effectively inspect (within a reasonable time period) all identified Flood Features, totaling approximately 450 in number.
The teams were composed of the following:
Page 24 of 36
CNS Flooding Walkdown Submittal Report Technical Team Members -Civil and Mechanical Professional Engineers and a Civil support engineer (Note: Resumes, qualifications, and training are documented in CNS engineering records.)
- CNS maintenance and craft personnel as needed to obtain access to features for inspection (i.e., electrical cabinets, manhole and ladder deployment, scaffolding erection, etc.)
6.3 Training Approach The Technical Team Members obtained further Flood Walkdown Training (through INPO's NANTEL website) developed by the NEI Fukushima Flooding Task Force. The technical team members also attended Site Specific Training in order to:
" Become knowledgeable of site current licensing basis and site specific flood protection features
- Information required to locate existing preventive maintenance (PM) for SSCs credited in the CLB for flood protection
" Information required to locate existing periodic Record Form tests that may include a SSCs credited in the CLB for flood protection.
" Expectations for the review of PMs and periodic tests to ensure flood protections features are adequately tested.
" Expectations and methods to be followed when recording observations and findings during visual inspections
" Quality expectations for documentation associated with NEI 12-07 0-A, Appendix B, Walkdown Record Forms.
6.4 Peer Review Process Following completion of each specific Walkdown Package, all non-conformances and potential deficiencies were evaluated through the CNS CAP system, including the aggregate effect on CNS plant operations and technical walkdown team reviews (performed by NPE Consultants) which satisfied the "peer review" activities requested by the NRC in Reference 10.1.1 and as outlined in NEI 12-07, (Ref. 10.1.2)
Page 25 of 36
CNS Flooding Walkdown Submittal Report 7 WALKDOWN RESULTS As described in Section 5, results of the assessment revealed various non-conforming penetration seals that were identified and documented. These features included; open penetrations, significantly degraded to the point of evidenced and/or quantifiable water inleakage seals having undocumented changes per their original design basis configurations, negative APM by design and open pathways through piping systems which communicate with building and site areas unprotected from flood waters. All deficiencies are summarized in Section 7.7 including initial associated recommendations for repair or correction.
A total of 479 flood protection features (477 physical features and 2 procedures) were identified and evaluated. The results of the flooding walkdown inspections and evaluations revealed that various external flood protection features (penetration seals) within the majority of the CNS essential plant structures were identified as nonconforming or deficient overall in meeting their CLB function based upon the defined acceptance criteria stated within the walkdown package. In those cases where observations suggested that acceptance criteria were not met or required further evaluation, the potential issues were captured in the CNS CAP to determine what actions are to be taken.
7.1 Incorporated or Exterior Passive Features Penetration Seals and Walls - The majority of the incorporated passive features at CNS are pipe penetrations, conduit penetrations and exterior walls within the subject Class I and II structures. The following is a summary of the walkdown inspection results by essential structure:
Various non-conforming penetration seals were identified and documented within the inspection record forms during the flooding walkdowns. These penetration seals included; open conduit penetrations, significantly degraded (to the point of evidenced and/or quantifiable water inleakage), undocumented per their original design basis configurations, negative APM by design and open pathways through piping systems which communicate with building and site areas unprotected from flood waters.
Site Drainage System - A walkdown of the site yard was performed to identify overall changes to site building elevations and site layout including buildings that were added or modified or significant changes to land use (e.g., additional paved areas) since the most recent licensing basis flood evaluation was completed. A review of the current site topography and any changes that may have affected the topography was performed. A detailed review of the original site drainage system design basis calculation developed by Bums & Roe and found in Civil Book 88 (Ref. 10.2.10) was also performed.
Walkdown observations indicate that the current site elevations and features have changed to some extent since the original flood analyses were performed. These changes include:
> Drop Inlets No. 1, No. 2, and No. 3 in front of the Administration Building were found to have concrete security barriers placed over the grates. The barriers restrict the inlets ability to convey storm water into the storm sewer pipes.
> Concrete barriers have also been placed over Catch Basins 3, 4, 5 and 6 south and east of the Reactor Building, as well as over several drop inlets in the former parking lot south of the Training Center.
Page 26 of 36
CNS Flooding Walkdown Submittal Report The engineering walkdown also found that a number of physical changes to the plant yard are not reflected on the Civil Paving, Grading, and Drainage Plans (Bums & Roe drawings 4004, 4005, 4006, 4007, & 4045) have not been routinely updated to reflect all changes in the plant yard These observations have been previously captured within CNS Condition Reports CR 2011-03751 and CR 2011-02507 and evaluated in Corrective Action CAl lof CR 2011-02507.
The CR action plan analyses concluded that based on the available information reviewed on current drawings, and the visual observations made of the site conditions, the potential for significant storm water to enter buildings during a local intense rainfall event is very low.
The concrete barricades over the drop inlets and catch basins do reduce their capacity to collect storm water; however, surface overflow paths are available to convey storm water away from CNS structures. Corrective Action CA 18 of CR 2011-02507 was generated to address as-built current CNS topographic information. This is necessary to fully evaluate the conditions and to positively identify and quantify flow paths away from the main buildings.
This as-built effort in conjunction with the re-analysis of the site drainage system is currently being performed by CNS in conjunction with vendor assistance and is scheduled for completion before the end-of-year 2012.
7.2 Incorporated or Exterior Active Features The Z Sump was identified as the only active feature required to function during a postulated PMF. As previously described, the sump contains equipment essential to the operation of the SGTS (Standby Gas Treatment System), and therefore must remain functional whenever Secondary Containment is required. Although the ground elevation at the sump is only 890 ft MSL, the Z Sump was determined by Walkdown Inspection not be affected by flooding since the sump penetrations were verified as sealed and the proper functioning of the sump was verified to be monitored by current PM and surveillance procedures.
These procedures include:
" Surveillance Procedure 6.SUMP. 101; "Z Sump and Air Ejector Holdup Line Drain Operability Test (IST)"
- System Operating Procedure 2.2.27; "Equipment, Floor, and Chemical Drain System" 7.3 Temporary Passive Features As previously described, temporary harden flood barriers (aluminum stop logs, etc.) and secondary protection through the deployment of sand bags are erected per CNS Procedure 7.0.11 (Ref. 10.2.14) to protect doorways, normal access openings within structures and other critical site assets from a PMF. The results of these walkdown inspections are discussed further in Section 7.5 of this report.
7.4 Temporary Active Features Temporary active features and methods of protection are specifically mentioned within the CNS USAR Section 4.2.2.2 as to the plant's response to an imminent flooding event. The USAR states that material and equipment necessary to perform these protective measures are available at CNS and inventoried on an annual basis. As an example; special equipment includes; two portable gasoline powered pumps and 100 feet minimum (per pump) of 2 1/22-inch non-collapsible hose. These components are currently stored within an ISO container Page 27 of 36
CNS Flooding Walkdown Submittal Report on site near the L.L.R.W. facility at CNS. The results of walkdown inspections and reasonable simulation in the deployment of these temporary active features are discussed further in Section 7.5 of this report.
7.5 Procedural Review CNS has established two primary procedures for guidance in the station's response to an external flooding event. These procedures are intended to prevent or mitigate the effects of an external flooding event through various operations and maintenance actions performed in advance of and/or during flooding conditions.
- 5. 1FLOOD, "FLOOD" As previously described, this is the primary (high level) procedure used for response to river level increase and is entered at a rising river level of greater than or equal to 895 ft MSL, notification of upstream dam failure and/or the river level is forecast to rise above a greater than or equal to value of 902 ft MSL within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The procedure invokes numerous flood response measures, actions and activities in addition to the other main response procedure 7.0.11 Flood Control Barriers Reasonable Simulation Credit was taken for the recent previous performance of this procedure during CNS response to the May 2011 major flooding of the Missouri River and associated upper Mississippi River System. Review of the procedure revealed several stated actions which require verification including:
- Section 1 Entry Conditions - Notification of Upstream Dam Failure requires further action to ensure established protocol is in place.
Section 4.8.3 - Verification that subsections 4.8.3.2 and 4.8.3.3 Protection of Main Transformer Yard, including; Main Power Transformer Oil Pumps, Main Power Transformer Control Cabinets, Normal Transformer Control Cabinet and Powerformer Transformer (northwest corner of NSST), Startup and Emergency Transformer Yard, including; TB-YD-122 (east side of ESST) can be executed in a timely manner.
A CR was generated to address these issues within the CNS CAP and assigned various corrective actions (CAs).
7.0.11, "FLOOD CONTROL BARRIERS" As previously described, CNS Maintenance Procedure 7.0.11 (Ref. 10.2.14) provides a system for installing temporary flood barriers at strategic locations in and around the Reactor Building, Turbine Building, Diesel Generator Building, Control Building, Radwaste Building, and the Multi-Purpose Facility (MPF. These barriers protect safety related systems and components up to elevation 906 feet Mean Sea Level (MSL). These flood barriers were originally constructed of sandbags, plywood, and plastic. Recent implementation of CNS CED 6033644 (Ref. 10.2.12) replaces the existing sandbag and plywood flood barriers with engineered flood barriers that are easier to deploy, remove and maintain, are more reliable, and safer to implement.
Reasonable Simulation The results of walkdown inspections associated with simulation in the deployment of these temporary passive features were documented by CNS work order (Ref. 10.2.18). This Page 28 of 36
CNS Flooding Walkdown Submittal Report simulation work plan was a representative check of each type of flood door barrier s to the time associated with installation/deployment. Observational records indicated an implementation time range of as short as 3.5 minutes to as long as 20 minutes for the total of 42 barriers deployed. Two barriers R 115 and R109 were unable to be deployed due to outage restraints requiring continuous temporary hoses running through the access opening.
These two features / barriers are identical to N 103 and T11 which were timed during the test (Ref. 10.2.18) at 4 minutes and 3.5 minutes respectively. Based on this comparison it was therefore determined they could also meet the reasonable simulation criteria as established.
Information obtained from this testing will be used by CNS to determine the person loading needed to deploy all barriers within the required procedural time / action period.
7.6 Inaccessible Features A significant amount of flood features (penetration seals) could only be partially inspected based on the fact that their primary water sealing feature (elastomer boot and sealing clamps) is located exterior to the building foundation wall buried underground within the soil. These features were evaluated based on visual inspection of the condition of the interior building sleeve and seal face and the lack or presence of water leakage.
A total of 14 features (12 pipe penetration seals and two wall surfaces) within the Radwaste Building - Waste Sludge Tank Room Elevation 877'-6" was determined to be inaccessible for walkdown inspections. The room is congested and the last dose rates on the tank were measured in excess of 3 Rem/hr. The room is also classified as a "Highly Contaminated Area" and has the potential to be an airborne area when entered as well. The 12 penetrations located in the room are the same construction and age as other external wall penetrations in the Radwaste Building and therefore should be in the same condition, i.e. some of them are assumed to be non-conforming due to indications of minor ground water in-leakage. This minor leakage is acceptable since it is well within the capabilities of installed plant systems to handle, i.e sump pumps, and there is no safe-shutdown equipment located in the area.
7.7 Deficient Features Flood features were evaluated with regard to being categorized as deficient in accordance with NEI 12-07 (Ref. 10.1.2) guidance criteria. NEI Section 3.8 states, "...a deficiency exists when a flood protectionfeature is unable to perform its intendedflood protectionfunction when subject to a design basisflooding hazard. This condition may also lead to compromisingthe overall ability to provideprotection or mitigation. This concept includes non-conforming conditions as defined in NRC Inspection Manual Part 9900. Observations that may be potentialdeficiencies will be evaluated in accordancewith stationprocesses and entered into the CorrectiveAction Program."
Based on the above criteria all non-conforming flood features identified during the walkdown inspections were entered into the CNS CAP program by initiation of a CR (Condition Report). As part of the CR process, the feature was evaluated with regard to meeting its design basis function and subsequent impact on plant operability. Several features were determined to be deficient based on presenting an open pathway for flooding (absence of sealing device) and/or having a potential impact on an SSC required for safe shutdown by the effects of water infiltration / accumulation. These features are list in Table 7.7.1 below.
Page 29 of 36
CNS Flooding Walkdown Submittal Report pathway (4" drain line) from OWC to Turbine Add barriers for OWC Building Sump TT building or install an Modify Turbine Bldg. Drainage resulting in potential isolation valve in the procedures A potential open external flooding pathway was discovered from MPF floor drain system into Tie CR to modification of the ARW Building through applicable procedures uncontrolled discharge which control the into Sump CC. Valve RW- position of valve RW- Modify 1164, "MPF Floor Drain to 1164. These include procedures ARW Chemical Sump CC CNS procedures 5.1 FLOOD, MPF floor drains and Shutoff", requires further S5FLOOD, 2.2.27 and 2.2.27, &
CNS-CR-2012-O7628 BIO-03-N piping to Sump CC 877'-6" procedural guidance 2.2.27A 2.2.27A completed The bathroom in the old EOF has a lavatory and Short term: revise floor drain that go to 5.1Flood to include Sump AA in ARW with no plugging or blocking off isolation valve. if river (PIG blanket) the floor level were to exceed drain. Long term: install Modify 903'6" water would enter a valve in the vertical procedures the sump and possibly ('4') run of pipe that 5.1 FLOOD, Sump AA - Augmented overwhelm the sump enters the top of the 2.2.27, &
CNS-CR-2012-07666 B1O-04-N Radwaste Bldg. 877'-6" pumps. sump. 2.2.27A completed Table 7.7.1 Page 30 of 36
CNS Flooding Walkdown Submittal Report Sump gravity drains 5.1Flood or MP 7.0.11 to straight to site the sludge include some sort of pond. There is no check dam or bladder to valve, back flow prevent water entry.
preventer or isolation Long term: install a valve Generate Main Sump Water valve to prevent flooding in the line to the sludge and execute CNS-CR-2012-07545 K100-27-F Treatment Facility 903'-6" above 903'-6" elevation oond a new CEO 1SE2R
... - R 28 Perform maintenance on gates to free them up, suggest hydrolyze, Outfall vertical drain Degraded outfall vertical clean and lubricate.
valve 002C in the drain gate valve bypasses Institute a PM to CNS-CR-2012-07894 C1-12-E headwall 890*-0" primary flood barriers maintain them. WO 4919665 10/14/2013 Tie CRto a Global CR which addresses complete extent of Diesel Fuel Tank 1A Conduit penetration seal condition of seals within Manhole, South of D342 was found to be DGStorage Tank and Prepare and Machine Shop, non-conforming based on associated interface implement CNS-CR-2012-09278 C1-10-S Conduit D342 899'-4" lack of waterproof seal. systems/components, conduit CED RE 28 Tie CR to a Global CR which addresses complete extent of Diesel Fuel Tank 1B Conduit penetration seal condition of seals within Manhole, South of D345 was found to be DGStorage Tank and Prepare and Machine Shop, non-conforming based on associated interface implement CNS-CR-2012-09342 Cl-11-S Conduit D345 899'-10' lack of waterproof seal. systems/components. conduit CED RE28 Table 7.7.1 (continued)
Page 31 of36
CNS Flooding Walkdown Submittal Report 7.8 Delayed Inspection Features A list of features that were inaccessible during the period of time in which the walkdown inspections were performed (both non-outage and outage periods) are listed in Table 7.8.1 below along with a justification and scheduled period for inspection.
DELAYED WALKDOWN The PT cabinets associated with EG-i have penetrations WO 4911449 Is in NPLN R28 This package Includes Features located PACKAGE DG-1 in the floor that need to be inspected. In order to access status to perform the in Diesel Generator #1, Rm N100. Total these penetrations the back panel will need to be SWGR inspection, number of features = 3 conduits removed. Per discussion with Electrical Maint. Supt, the buss between EG-Iand IFEwill need to be de-energized to do this safely. This will occur during the R28 cycle when 4160v SWGRDG-I is inspected.
WALKDOWN The PT cabinets associated with EG-2 have penetrations WO 4911449 is in NPLN R28 This package includes Features located PACKAGE DG-2 in the floor that need to be inspected. In order to access status to perform the in Diesel Generator #2, Rm N101. Total these penetrations the back panel will need to be SWGR inspection, number of features = 3 conduits removed. Per discussion with Electrical Maint. Supt, the buss between EG-2 and IFEwill need to be de-energized to do this safely. This will occur during the R28 cycle when 4160v SWGRDG-2 is inspected.
Table 7.8.1 Page 32 of 36
CNS Flooding Walkdown Submittal Report 8 AVAILABLE PHYSICAL MARGIN Available Physical Margins (APMs) have been collected and are documented on the individual Flooding Walkdown Record Forms contained within CNS engineering file records. Condition Reports were generated for items/features identified with indeterminate or negative APMs. A significant number of plant features were found to be indeterminate with regard to defining a specific APM value based on the presence of current or past water leakage/seepage. The original design basis for the various features was determined based on the following:
Exterior Building Walls The NPPD Engineering Criteria Document for Cooper Nuclear Station (Ref. 10.2.8), Section 5.16.2, Hydraulic Loads - Flood, states, . ..... All A structuresshall be designedfor a hydraulic load equivalent to a groundwater elevation of 903 and reviewedfor integrityfor a river elevation of 906."
This statement is supported by the various original structural design calculations for the walls and structures of the various CNS buildings developed by Bums & Roe with the exception of the Intake Structure walls which were additionally analyzed for wave effects up to elevation 919-ft MSL.
Piping Penetration Seals The design criteria for the installed external piping penetration seals was established by the vendor who provided the original boot seals Fuller-Austin Insulation Co. A letter of verification (Ref. 10.2.23) states,
..ooo .oooo .......... ooooo o.o. o......... o°°o°.o ..... ooo,,.... °......... °°,o° ..... ooo o. o...... °,o....... *°°*,*ooo°,°
- 1. All boots were installed under the close supervision and were inspected by our Project SuperintendentMr. Scott Ross.
- 2. The black boots are identicalin materialsand installationtechnique to the boots tested by Bechtel at Arkansas Nuclear One.
- 3. The red boots were installedin the samefashion, the difference being one of temperature limit.
- 4. Based upon previous tests we do not see any difficulty in these boots withstanding a 20 foot head with less than one gallon per day water leakage each.................................. .
Conduit Penetration Seals CNS contract document (Ref. 10.2.24) for underground conduits states,".......Special attention shall be given to the installationat the manholes and at the entrances through building wall."
In addition, a Bums & Roe Inc. transmittal (Ref. 10.2.25) indicates that the open ends of conduits were sealed with CPR Upjohn Urethane. A hydraulic rating for the capability of this seal material was not provided or determined and therefore an associated APM cannot be determined for the existing installed conduit seal features.
APMs for the various features evaluated during the inspection walkdowns were assessed based on the above design basis criteria as applicable.
Page 33 of 36
CNS Flooding Walkdown Submittal Report 9 NEW FLOOD PROTECTION SYSTEMS CNS has recently completed the design of a plant modification described in CED 6033644 -
External Flood Barriers, (Ref. 10.2.12) which evaluates the replacement of the sand bag and plywood barrier construction method with a system of removable pre-engineered aluminum stop log beams at various exterior doors located at ground level. The Modification also includes constructing a reinforced concrete flood wall around the HPCI Access hatch in the plant yard, which historically had also been flood protected by sandbags and plywood. This plant modification is currently being implemented and is expected to be complete by year end (2012).
The new engineered barriers will be installed in the same locations as the previous sandbag and plywood barriers as well as at doors H1100 and H1114 of the MPF building. The installation of the engineered flood barriers is initiated through CNS Emergency Procedure
- 5. IFlood based on existing and projected river elevations. The procedure identifies the measures to be taken based on the potential for flooding at the site. The use of engineering flood barriers in place of sandbag and plywood barriers does not have an adverse impact on the implementation of this procedure.
In addition to implementation of the above mentioned CED, other plant flood protection changes are currently being implemented or analyzed including:
" CNS Fire Pump House Building temporary external flood barrier system and other flood protection modifications including construction of a permanent building located above flood level to house the SAMG Diesel Generator and associated equipment. (This is a result of CNS response actions to IERI 1-4, "Extended Loss of Power").
" Modification of various existing leaking piping penetrations located within Class I and II Building Structures with new internal seals in accordance with specific developed CEDs and work orders identified previous to this inspection walkdown. (This is a result of current 50.54 (f) Recommendation 2.3 walkdown inspections findings).
" Initiation of maintenance work orders to correct non-conformances associated with site manholes, their associated conduit seals, manhole lids, and the seals on manholes lids.
(This is being tracked by URT items for RE28).
" Water level monitoring instrumentation is being installed in Manholes 6 and 6A which will be completed during the next operational cycle. (This is being tracked by URT items for RE27).
Page 34 of 36
CNS Flooding Walkdown Submittal Report 10 REFERENCES 10.1 Regulatory Documents, Codes and Guidance 10.1.1 USNRC Letter Dated March 12, 2012, Addressed To All Power Reactor Licensees, "Request For Information Pursuant To Title 10 of The Code of Federal Regulations 50.54(F) Regarding Recommendations 2.1, 2.3 and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident".
10.1.2 NEI 12-07, Rev. 0-A, "Guidelines for Verification Walkdowns of Plant Flood Protection Features", dated May 2012.
10.1.3 Regulatory Guide 1.102, Rev. 1, September 1976, "Flood Protection for Nuclear Power Plants".
10.2 NPPD Documents 10.2.1 CNS Updated Safety Analysis Report (USAR), Volume II, Section 3.0, Meteorology.
10.2.2 CNS Updated Safety Analysis Report (USAR), Volume II, Section 4.0, Hydrology.
10.2.3 Original Final Safety Analysis Report (FSAR) Question 2.1, 2.2, 2.3, 2.6, 2.7, and 2.8 Response, Amendment 9.
10.2.4 Original Final Safety Analysis Report (FSAR) Question 2.4 and Response, Amendment 11.
10.2.5 Original Final Safety Analysis Report (FSAR) Question 2.33, 2.34, and 2.36 Response, Amendment 17.
10.2.6 Original Final Safety Analysis Report (FSAR) Question 2.35 Response, Amendment 16.
10.2.7 CNS Safety Evaluation Report (SER), Docket 50-298, February 14, 1973.
10.2.8 NPPD Engineering Design Criteria Document for Cooper Nuclear Station, June 3, 1970, Updated, March 15, 1972.
10.2.9 Cooper Nuclear Station, IPEEE "Individual Plant Examination of External Events -
For Severe Accident Vulnerabilities" - IOCFR 50.54(f).
10.2.10 B & R Civil Structural Calculation, Book No. 88, "Yard Site Drainage & Paving".
10.2.11 CNS Calculation, Rev.2, Status 2, NEDC 11-076, "External Flood Hazard Event Review".
10.2.12 CNS, Change Evaluation Document, CED 6033644, External Flood Barriers.
10.2.13 CNS Emergency Procedure 5. 1Flood, Revision 13, "Flood".
10.2.14 CNS Maintenance Procedure 7.0.11, Revision 26, "Flood Control Barriers".
10.2.15 CNS Technical Requirements Manual, T3.7.1, "River Level", Dated 0 1/08/2009.
Page 35 of 36
CNS Flooding Walkdown Submittal Report 10.2.16 CNS Condition Report 2012-613 1, Corrective Action CA-2, CAT C "Fix" Evaluation, Dated 10/16/2012.
10.2.17 CNS Condition Report 2012-7428, Corrective Action CA- I Dated 10/18/2012.
10.2.18 CNS Mechanical Work Plan 4833277 Operation 0070, "Flood Barriers and Acceptance Testing, Dated 05/31/2012.
10.2.19 CNS Design Engineering Department Correspondence Number: 12-0002, "Response to Recommendations 2.3, Flooding, Enclosure 4 of the 50.54(0 Letter Dated March 12, 2012", Dated 11/21/2012.
10.2.20 CNS Updated Safety Analysis Report (USAR), Volume XII, Section 2.0, Structural Design.
10.2.21 Original Final Safety Analysis Report (FSAR) Question 12.2 Response, Amendment 9 10.2.22 B&R Drawing 2299, Rev. NO 1, "Cooper Nuclear Station Water Seals for Exterior
& Torus Wall Sleeve Details and Schedules.
10.2.23 Letter Fuller-Austin Insulation Co. from Mr. William. A. Lotz to Mr. Ed Kuchera/Mr. Lee Howell of Bums and Roe Inc., dated January 9, 1974.
10.2.24 Cooper Nuclear Station Contract Document E-69-17, Electrical Power Installation Section 3.2, "Underground Ducts" 10.2.25 Bums & Roe Inc. Transmittal "W.O. 2593 NPPD Cooper Nuclear Station Sealing Materials" dated March 25, 1975.