Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09147068231 December 2008R. E. Ginna Nuclear Power Plant, Annual Radioactive Effluent Release Report for 2008Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
IR 05000244/200830129 December 2008Er 05000244-08-301; October 27 - November 7, 2008; R. E. Ginna Nuclear Power Plant; Initial Operator Licensing Examination Report
ML08366025329 December 2008Final Qa/Related Operator Licensing Exam Forms (Folder 1)
ML09006074119 December 2008R. E. Ginna - Application to Revise Technical Specification Limiting Conditions of Operation (Lcos) 3.3.2, 3.3.4, and 3.8.1Anticipated operational occurrence
ML08353007218 December 2008Clarification to Application for Ginna Relief Request No. 19Dissimilar Metal Weld
IR 05000244/200800717 December 2008IR 05000244-08-007, on 11/20/2008, Ginna Nuclear Plant, Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies. - Letter OnlyB.5.b
ML08364030417 December 2008Independent Spent Fuel Storage Installation and Nine Mile Point, Units 1 & 2 and R. E. Ginna, Withdrawal of the Application for Approval of 10 CFR 50.80 and 10 CFR 72.50 Indirect Transfers of Control of Licenses
ML11011003116 December 2008Quality Assurance Topical Report, Revision 2Fitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fire Protection Program
Grace period
ML08346003311 December 2008Acceptance Review for Relief Request No. 22
ML0834003135 December 2008Requalification Program Inspection - R. E. Ginna Nuclear Power Plant, LLC
ML0835101115 December 2008R. E. Ginna Nuclear Power Plant, LLC, NRC Operator Licensing Initial Exam Results, (Cover Letter Publicly Available; Enclosures Withheld from Public)
ML0831902484 December 2008Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Nine Mile Point Nuclear Station Units 1 and 2, and R. E. Ginna Nuclear Power Plant
TAC:ME02034 December 2008
ML0834600514 December 2008R. E. Ginna Nuclear Power Plant - License Amendment Request: Revision of Tech Spec. 3.9.3 to Allow Refueling Operations Inside Containment with Both Personnel Hatch Air Lock Doors Open Under Administrative Control, and Obtain Regulatory RevAnticipated operational occurrence
Tornado Generated Missile
Deep Dose Equivalent
ML0833802061 December 2008R. E. Ginna, Supplemental Information for Approval of 10 CFR 50.80 and 10 CFR 72.50 Indirect Transfers of Control of License Application
ML08319017625 November 2008Request for Withholding Information from Public Disclosure (R. E. Ginna Nuclear Power Plant)
ML12220A10124 November 2008Constellation Energy Group, Inc. Definitive Proxy Statement Schedule 14AIncorporated by reference
Grace period
Stolen
TAC:ME015421 November 2008
ML08354009821 November 2008First Interval Iwe/Iwl Containment Program Submittal of Relief Request Number 22
ML08318014220 November 2008R. E. Ginna Nuclear Power Plant-Evaluation of the Request for an Extension of Enforcement Discretion in Accordance with the Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 80Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
TAC:MD972820 November 2008
ML08304060519 November 2008Notice of Consideration of Approval of 10 CFR 50.80 Indirect Transfer of Control of License and Opportunity for a Hearing - R.E. Ginna Nuclear Power Plant
ML08323050819 November 2008Notice of Consideration of Approval of 10 CFR 50.80 Indirect Transfer of Control of License and Opportunity for a Hearing
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
ML09210005410 November 2008Submittal of Licensing Documents, Including Revision 51 to the Technical Specification Bases, Revision 21 to the Updated Final Safety Analysis Report, Revision 5 to the Fire Protection Program, and Revision 7 to the Fourth ISI ProgramFire Protection Program
ML09210007410 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 3, Design of Structures, Components, Equipment, and Systems, Section 3.8.1.4.4.3 Through Appendix F, Table 3F.5-1Safe Shutdown
Boric Acid
Loop seal
Grab sample
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Tornado-Generated Missile
Operability Determination
Earthquake
Liquid penetrant
Flow Induced Vibration
Power Uprate
ML09210030110 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 4, Reactor Through Chapter 6, Engineered Safety FeaturesSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Anchor Darling
Nondestructive Examination
Pressure and Temperature Limits Report
Design basis earthquake
License Renewal
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Flow Induced Vibration
Coast down
GOTHIC
Unidentified leakage
Power Uprate
ML09210030210 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 7, Instrumentation and Controls Through Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Unanalyzed Condition
Boric Acid
Health Physics Network
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Ultimate heat sink
Grab sample
Fire Barrier
Stroke time
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Coatings
Met Tower
Zebra Mussel
Emergency Lighting
Pressure and Temperature Limits Report
Frazil ice
Earthquake
Control of Heavy Loads
Biofouling
Offsite Circuit
Fire Protection Program
Fire Watch
Early Warning Fire Detection
Power change
Flow Induced Vibration
GOTHIC
Unidentified leakage
Power Uprate
ML09210030310 November 2008Updated Final Safety Analysis Report, Rev. 21, Chapter 11, Radioactive Waste Management Through Chapter 15, Accident AnalysesSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Annual Radioactive Effluent Release Report
Process Control Program
Safeguards Contingency Plan
Rod Drop Event
Earthquake
Fuel cladding
Fire Protection Program
Power change
Coast down
Power Uprate
ML09210044010 November 2008Updated Final Safety Analysis Report, Rev. 21, Cover Through Chapter 3, Design of Structures, Components, Equipment, and Systems, Section 3.8.1.4.4.2Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Tornado-Generated Missile
Pressure and Temperature Limits Report
Tornado Missile Protection
Frazil ice
Earthquake
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Backfit
Power change
Power Uprate
ML0831801347 November 2008Submittal of Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission ApprovalTornado Missile
ML0831703236 November 2008Response to Request for Additional Information Increased Ownership of Constellation Energy Group, Inc
IR 05000244/20080106 November 2008IR 05000244-08-010 on 09/08/08 - 09/26/08 for R.E. Ginna Nuclear Power Plant - Problem Identification and Resolution (Pi&R) ReportEmergency Lighting
IR 05000244/20080045 November 2008IR 05000244-08-004 on 07/01/2008 - 09/30/2008 for R.E. GinnaBoric Acid
Fire Barrier
Stroke time
Temporary Modification
Functionality Assessment
Significance Determination Process
Process Control Program
Operability Determination
TAC:MD99625 November 2008
ML0831009075 November 2008Acceptance Reviews for Ginna Relief Request No. 18 and Accompanying License Amendment
TAC:MD99675 November 2008
ML08311041531 October 2008R. E. Ginna Nuclear Power Plant - Responses to Request for Additional Information Pertaining to Fourth 10-Year Inservice Inspection Program Relief Request Number 19Boric Acid
Hydrostatic
VT-2
Earthquake
TAC:MD978828 October 2008
ML08297103628 October 2008Acceptance Review Application for Approval of 10 CFR 50.80 and 10 CFR 72.50 Indirect Transfers of Control of Licenses-Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Nine Mile Point Nuclear Station, Units 1 and 2, and R.E. Ginna
ML08295044227 October 2008Request for Additional Information Increased Ownership of Constellation Energy Group, Inc. by Electricite DE France-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, R.E. Ginna Nuclear Power Plant, Nine Mile Point (TAC Nos. MD9634-MD96
TAC:MD963427 October 2008
ML08291023323 October 2008Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
ML08311061917 October 2008R. E. Ginna Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)Boric Acid
Shutdown Margin
Fuel cladding
ML08311059017 October 2008R. E. Ginna Final Outlines (Folder 3)
ML08311065917 October 2008R. E. Ginna Handouts to Applicants (Folder 3)
ML08311066517 October 2008R. E. Ginna Final - Operating Exam, Sections a, B, and C (Folder 3)
ML08291014517 October 2008Ltr. to John T. Carlin Operator Licensing Examination Approval R.E. Ginna Nuclear Power Plant
ML08291004213 October 2008R.E. Ginna Nuclear Power Plant, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.Time of Discovery
Condition Adverse to Quality
ML0828204388 October 2008R. E. Ginna Nuclear Power Plant - Notification of Inspection of the Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Using Temporary Instruction 2515/171B.5.b Mitigating Strategies