MONTHYEARML0829504322008-09-0101 September 2008 R. E. Ginna Draft - Section C Operating Exam (Folder 2) Project stage: Draft Other ML0829504252008-09-0101 September 2008 R. E. Ginna Draft - Section B Operating Exam (Folder 2) Project stage: Draft Other ML0829504222008-09-0101 September 2008 R. E. Ginna Draft - Section a Operating Exam (Folder 2) Project stage: Draft Other ML0829503892008-09-0101 September 2008 R. E. Ginna Draft - RO & SRO Written Exam (Folder 2) Project stage: Draft Other ML0829503842008-09-0101 September 2008 R. E. Ginna Draft - Outlines (Folder 2) Project stage: Draft Other ML0829503492008-09-17017 September 2008 NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (Folder 2) Project stage: Draft Other ML0831106652008-10-17017 October 2008 R. E. Ginna Final - Operating Exam, Sections a, B, and C (Folder 3) Project stage: Other ML0831106592008-10-17017 October 2008 R. E. Ginna Handouts to Applicants (Folder 3) Project stage: Other ML0831106192008-10-17017 October 2008 R. E. Ginna Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML0831105902008-10-17017 October 2008 R. E. Ginna Final Outlines (Folder 3) Project stage: Other ML0835101112008-12-0505 December 2008 R. E. Ginna Nuclear Power Plant, LLC, NRC Operator Licensing Initial Exam Results, (Cover Letter Publicly Available; Enclosures Withheld from Public) Project stage: Other ML0836602532008-12-29029 December 2008 Final Qa/Related Operator Licensing Exam Forms (Folder 1) Project stage: Other 2008-12-05
[Table View] |
Similar Documents at Ginna |
|---|
|
Text
2008 Ginna NRC Exam 2008 Ginna NRC Exam RO Portion Provide the following references to the Students:
- 1.
- 2.
- 3.
- 4.
- 5.
Generator Capability Curve (Q #16) [already on exam]
Fig-13, Figure Back Pressure (Q #21) [already on exam]
Steam Tables (Q #26)
Fig - 1.0, Figure Min Subcooling (Q #58)
ES-0.2, Natural Circulation, Foldout Page only (Q #58)
RO
2008 Ginna NRC Exam SRO 2008 Ginna NRC Exam SRO Portion Provide the following references to the Students:
- 1. EPIP-1.O, Ginna Station Event Evaluation and
- 2. AP-SG. 1, Steam Generator Tube Leak (Q # 83)
- 3. Fig-21 Fig Cnmt Spray Restart Criteria pg. 1 (Q # 89)
- 4. Steam Tables (Q # 89)
- 5. EPIP-2.1, Protective Action Recommendations (Q # 99)
Classification (Q # 82)