MONTHYEARML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML22098A0042022-04-0808 April 2022 2022 10 CFR 50.46 Annual Report ML21098A0212021-04-0808 April 2021 2021 10 CFR 50.46 Annual Report ML20099A0982020-04-0808 April 2020 R. E. Ginna Nuclear Plant - 2020 10 CFR 50.46 Annual Report ML19098A6892019-04-0808 April 2019 2019 10CFR 50.46 Annual Report ML18096A0042018-04-0606 April 2018 Submittal of 2018 10 CFR 50.46 Annual Report ML18142A6002018-02-14014 February 2018 Annual Report #12, January 1, 1976 to December 31, 1976 Inclusive ML18011A6252017-12-11011 December 2017 the 2017 Annual Report of the Ceng Independent Nuclear Advisory Committee to the Ceng Board of Directors ML17097A0942017-04-0707 April 2017 Submittal of 2017 10 CFR 50.46 Annual Report ML16145A5062016-05-12012 May 2016 Annual Radioactive Effluent Release Report and Annual Radiological Environment Operating Report ML16126A1942016-04-29029 April 2016 Report of Facility Changes, Tests and Experiments Conducted Without Prior Commission Approval and Report of Commitment Changes Performed in Accordance with NEI 99-04 ML16098A1462016-04-0707 April 2016 Submittal of 2016 10 CFR 50.46 Annual Report ML16011A0032016-01-0707 January 2016 Submittal of Annual Report of the Nuclear Advisory Committee ML15099A0082015-04-0909 April 2015 Submittal of 2015 10 CFR 50.46 Annual Report RS-15-104, Annual Property Insurance Status Report2015-04-0101 April 2015 Annual Property Insurance Status Report ML14105A0152014-04-0909 April 2014 10 CFR 50.46 Annual ECCS Report ML13094A0752013-04-0101 April 2013 CFR 50.46 Annual ECCS Report ML13037A3802012-12-17017 December 2012 Attachment 1b, 2012 Annual Report of the Ceng Independent Nuclear Advisory Committee ML12142A2972012-05-31031 May 2012 Annual Radiological Environmental Operating Report: January 1, 2011 - December 31, 2011 ML1014101042010-05-14014 May 2010 Annual Radiological Environmental Operating Report: January 1, 2009 - December 31, 2009 ML1009001532010-03-26026 March 2010 CFR 50.46 Annual Emergency Core Cooling System (ECCS) Report ML1014101022009-12-31031 December 2009 Annual Radioactive Effluent Release Report ML0831801342008-11-0707 November 2008 Submittal of Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval ML0807206682008-03-0404 March 2008 10CFR50.54(w)(3) Annual Reporting of Property Damage Insurance ML0615301132006-05-26026 May 2006 Annual Financial Report ML0513001382005-05-0404 May 2005 10CFR50.46 30 Day and Annual ECCS Report ML0513805292004-12-31031 December 2004 Annual Radiological Environmental Operating Report 2024-04-10
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] |
Text
Joseph E. Pacher R.E. Ginna Nuclear Power Plant, LLC Manager, Nuclear Engineering Services 1503 Lake Road Ontario, New York 14519-9364 585.771.5208 585.771.3392 Fax joseph. pacher@constellation.com Nuclear Generation Group ConuteGlation Energy November 7, 2008 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Report of Facility Changes. Tests, and Experiments Conducted Without Prior Commission Approval The subject report is hereby submitted as required by 10 CFR 50.59(d)(2). The enclosed report contains descriptions and summaries of the 10 CFR 50.59 evaluations conducted in support of proposed changes to the facility and procedures described in the UFSAR and special tests, from January 2007 through June 2008, performed under the provisions of 10 CFR 50.59. Also, for the period of January 2007 through June 2008 no regulatory commitment changes were made that met the threshold for notification to the NRC when evaluated per the guide lines of NEI-99-04, "Guidelines, for Managing NRC Commitment Changes", that have not been previously submitted.
If you should have any questions regarding this submittal, please contact David Wilson at (585) 771-5219.
Very truly yours, "oseph E. Pacher
Attachment:
(1) Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval for January 2007 through June 2008 under the Provisions of 10 CFR 50.59 cc: S. J. Collins, NRC D. V. Pickett, NRC Resident Inspector, NRC C-j(c-7 10o0gC-0 CI
K ATTACHMENT (1)
REPORT OF FACILITY CHANGES, TESTS, AND EXPERIMENTS CONDUCTED WITHOUT PRIOR NRC APPROVAL FOR JANUARY 2007 THROUGH JUNE 2008 UNDER THE PROVISIONS OF 10 CFR 50.59
Report of Facility Changes, Tests, and Experiments Conducted Without Prior NRC Approval for January 2007 through June 2008 under the Provisions of 10 CFR 50.59 50.59 EvaluationNo: 2008-0001 Title of Change: Non-LOCA Gap Release Fractions Implementation Document: None UFSAR Affected Sections: None System: Reactor Coolant System Descriptionof Change:
A small number of fuel rods in the Cycle 33 and 34 reactor cores (2.45% and 0.48%
respectively) will exceed the Regulatory Guide (RG) 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, 1.183 Footnote 11 criterion for use of Table 3 non-LOCA gap release fractions. Dose analyses for the impacted accidents (fuel handling, tornado missile, and locked rotor) have been revised by doubling the gap release fractions for rods that violate the RG 1.183 criterion.
EvaluationSummary:
All dose consequences are not more than minimal due to the small number of rods that violate the RG 1.183 criterion. The changes to the gap release fractions for the fuel handling accident and the tornado missile accident can be performed under 10 CFR 50.59.
The changes to the locked rotor accident (LRA) are a departure from a method of evaluation and cannot pass criterion (c)(2)(viii) of 10 CFR 50.59, so a License Amendment will be required for permanent use of revised gap release fractions. Since the LRA dose consequences are not more than minimal when the gap fractions are doubled in accordance with guidance in NUREG/CR-5009, Assessment of the Use of Extended Burnup Fuel in Light Water Power Reactors, there is a reasonable expectation of operability once the RG 1.183 criterion is violated. This will be addressed as a nonconforming condition with appropriate compensatory actions within the Ginna corrective action program pending issuance of a License Amendment.