Letter Sequence Other |
---|
|
|
MONTHYEARML0829710362008-10-28028 October 2008 Acceptance Review Application for Approval of 10 CFR 50.80 and 10 CFR 72.50 Indirect Transfers of Control of Licenses-Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Nine Mile Point Nuclear Station, Units 1 and 2, and R.E. Ginna Project stage: Acceptance Review ML0832305082008-11-19019 November 2008 Notice of Consideration of Approval of 10 CFR 50.80 Indirect Transfer of Control of License and Opportunity for a Hearing Project stage: Other ML0830406052008-11-19019 November 2008 Notice of Consideration of Approval of 10 CFR 50.80 Indirect Transfer of Control of License and Opportunity for a Hearing - R.E. Ginna Nuclear Power Plant Project stage: Other ML0831902482008-12-0404 December 2008 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Nine Mile Point Nuclear Station Units 1 and 2, and R. E. Ginna Nuclear Power Plant Project stage: Withholding Request Acceptance 2008-11-19
[Table View] |
Similar Documents at Ginna |
---|
Category:Federal Register Notice
MONTHYEARML24010A2072024-01-25025 January 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - December 2023 ML21330A0432021-12-15015 December 2021 Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR Part 50, Appendix E, Section IV.F.2.C (EPID L-2021-LLE-0044) (FRN) ML21294A3762021-11-16016 November 2021 Federal Register Notice for Order Approving Indirect Transfer of Licenses ML21277A0772021-10-21021 October 2021 FRN - Notice of Issuance of COVID-19 Exemption Issued in September 2021 ML21145A0152021-05-26026 May 2021 FRN Exelon License Transfer - Extend Comment Period ML21145A0142021-05-26026 May 2021 Fleet and the Associated Independent Spent Fuel Storage Installations - Extension of Comment Period for Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity to Request a Hearing EPID L-2021-L ML21102A0752021-04-28028 April 2021 Fleet - Notice of Consideration of Approval of Transfer of Licenses and Conforming Amendments and Opportunity for a Hearing (FRN) ML21063A0052021-04-14014 April 2021 Federal Register Notice, Exemption from the Requirements of 10 CFR 2.109(b) Related to Subsequent License Renewal Application ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML20055E4282020-02-26026 February 2020 R. E. Ginna Nuclear Power Plant - Cover Letter with Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License and Opportunity for a Hearing ML20055E3922020-02-26026 February 2020 R. E. Ginna Nuclear Power Plant - Individual Federal Register Notice Add a One-Time Note for Use of Alternative Residual Heat Removal Loop ML19238A3692019-09-0303 September 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 09/10/2019 ML19170A3192019-07-23023 July 2019 R. E. Ginna Nuclear Power Plant - Environmental Assessment and Finding of No Significant Impact Related to Changes to Emergency Plan Staffing Requirements ML19162A1642019-07-23023 July 2019 FRN - R. E. Ginna Nuclear Power Plant - Emergency Plan Resource Environmental Assessment-FONSI ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18002A3812018-01-24024 January 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: February 6, NRC-2018-0011, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: Februar2018-01-24024 January 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: February 6, ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17248A2262017-09-15015 September 2017 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: October 3, 2017 ML17131A1132017-06-21021 June 2017 R. E. Ginna Nuclear Power Plant - Transmittal Letter Re. Exemption from Requirements of 10 CFR Section 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Clad Fuel Rods NRC-2017-0124, FRN: Exemption, Issuance - R. E. Ginna Nuclear Power Plant - Request for Exemption from 10 CFR 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Fuel Rod Cladding2017-06-19019 June 2017 FRN: Exemption, Issuance - R. E. Ginna Nuclear Power Plant - Request for Exemption from 10 CFR 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Fuel Rod Cladding ML17136A2212017-06-19019 June 2017 FRN: Exemption, Issuance - R. E. Ginna Nuclear Power Plant - Request for Exemption from 10 CFR 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Fuel Rod Cladding ML16004A1182016-01-0707 January 2016 FRN, Issuance of Confirmatory Orders, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended ML15320A0362015-12-0808 December 2015 Cover Letter Transmitting Ginna Fonsi Preemption Authority Request Final EA NRC-2015-0269, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 20152015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15328A5502015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15182A0262015-10-22022 October 2015 Draft Environmental Assessment and Finding of No Significant Impact (MF2618 and MF2623) ML15182A0232015-10-22022 October 2015 Draft Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Request ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML15120A2272015-05-0101 May 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015 ML14303A3812014-10-31031 October 2014 Biweekly Sholly FRN - Application and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: November 12, 2014 NRC-2014-0229, Federal Register Notice License Amendment Application, Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Exelon Generation Company, LLC, R. E. Ginna Nuclear Power Plant2014-10-21021 October 2014 Federal Register Notice License Amendment Application, Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Exelon Generation Company, LLC, R. E. Ginna Nuclear Power Plant ML14282A5672014-10-21021 October 2014 Federal Register Notice License Amendment Application, Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Exelon Generation Company, LLC, R. E. Ginna Nuclear Power Plant NRC-2014-0917, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 20142014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 ML14247A1542014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 NRC-2013-0252, R.E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment2014-03-25025 March 2014 R.E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment ML14063A2112014-03-25025 March 2014 Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment ML13294A0702013-12-18018 December 2013 Consideration of Approval of Transfer of Renewed Facility Operating Licenses, Materials Licenses, and Conforming Amendments Containing SUNSI ML13294A0392013-11-0707 November 2013 Notice of Consideration of Approval of Transfer of Renewed Facility Operating Licenses and Conforming Amendments,.. ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit NRC-2013-0127, Order Designating an Interim Class of NRC Licensed Facilities That Are Eligible to Apply to the Commission for Authorization to Use the Authority Granted Under the Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended2013-06-0505 June 2013 Order Designating an Interim Class of NRC Licensed Facilities That Are Eligible to Apply to the Commission for Authorization to Use the Authority Granted Under the Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended ML13121A4592013-06-0505 June 2013 Order Designating an Interim Class of NRC Licensed Facilities That Are Eligible to Apply to the Commission for Authorization to Use the Authority Granted Under the Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status 2024-01-25
[Table view] Category:Letter
MONTHYEARIR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators 2024-09-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 19, 2008 Mr. Louis S. Larragoite Manager - Nuclear Safety and Security Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 SUB..IECT: NOTICE OF CONSIDERATION OF APPROVAL OF 10 CFR 50.80 INDIRECT TRANSFER OF CONTROL OF LICENSE AND OPPORTUNITY FOR A HEARING - R.E. GINNA NUCLEAR POWER PLANT (TAC NO. MD9788)
Dear Mr. Larragoite:
Enclosed is a copy of a "Notice of Consideration of Approval of 10 CFR 50.80 Indirect Transfer of Control of License," related to the application dated October 3, 2008, filed by Constellation Energy Nuclear Group, LLC and MidAmerican Energy Holdings Company (MEHC). The application, pursuant to 10 CFR 50.80, seeks approval of the proposed indirect transfer of R.E.
Ginna Nuclear Power Plant, Facility Operating License DPR-18, as a result of the proposed acquisition of Constellation Energy Group, Inc. by MEHC.
This notice is being forwarded to the Office of the Federal Register for publication.
Sincerely,
.~~~ ',.j P,-c-~,-;X\
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Notice cc: Distribution via ListServ
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION RE. GINNA NUCLEAR POWER PLANT. LLC R.E. GINNA NUCLEAR POWER PLANT DOCKET NO. 50*244 NOTICE OF CONSIDERATION OF APPROVAL OF 10 CFR 50.80 INDIRECT TRANSFER OF CONTROL OF LICENSE AND OPPORTUNITY FOR A HEARING The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering the issuance of an Order under 10 CFR 50.80 approving the indirect transfer of Facility Operating License No. DPR-18 for the R E. Ginna Nuclear Power Plant, currently held by R E. Ginna Nuclear Power Plant, LLC, as owner and licensed operator. RE. Ginna Nuclear Power Plant, LLC is owned by Constellation Nuclear Power Plants, Inc., which is owned by Constellation Energy Nuclear Group, LLC (CENG).
According to an application for approval dated October 3, 2008, filed by CENG and MidAmerican Energy Holdings Company (MEHC), the indirect transfer of control would result from the proposed acquisition by merger of CENG's parent corporation, Constellation Energy Group, Inc. (CEG) by MEHC. MEHC will indirectly own 100 percent of CEG through its direct wholly owned subsidiary Constellation Energy Holdings, LLC, a holding company.
CEG will remain as the parent company of CENG and CENG will remain as the parent company of the licensee. There will be no direct transfer of the license. RE. Ginna Nuclear Power Plant, LLC, will continue to own and operate the facility. No physical changes to the facility or operational changes are being proposed in the application.
Pursuant to 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission shall give its consent in writing. The Commission will approve an application for the indirect transfer of a
-2 license, if the Commission determines that the proposed transfer will not affect the qualifications of the licensee to hold the license, and that the transfer is otherwise consistent with applicable provisions of law, regulations, and Orders issued by the Commission pursuant thereto.
The filing of requests for hearing and petitions for leave to intervene, and written comments with regard to the license transfer application, are discussed below.
Within 20 days from the date of publication of this notice, any person(s) whose interest may be affected by the Commission's action on the application may request a hearing and intervention via electronic submission through the NRC E-filing system. Requests for a hearing and petitions for leave to intervene should be filed in accordance with the Commission's rules of practice set forth in Subpart C "Rules of General Applicability: Hearing Requests, Petitions to Intervene, Availability of Documents, Selection of Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings," of 10 CFR Part 2. In particular, such requests and petitions must comply with the requirements set forth in 10 CFR 2.309. Untimely requests and petitions may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for failure to file on time is established. In addition, an untimely request or petition should address the factors that the Commission will also consider, in reviewing untimely requests or petitions, set forth in 10 CFR 2.309(c)(1 )(i)-(viii).
All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in accordance with the NRC E-Filing rule, which the NRC promulgated in August 2007,72 Fed. Reg. 49139 (Aug. 28, 2007). The E-Filing process requires participants to submit and serve documents over the internet or in some cases to mail copies on electronic storage media. Participants may not
-3 submit paper copies of their filings unless they seek a waiver in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least ten (10) days prior to the filing deadline, the petitioner/ requestor must contact the Office of the Secretary bye-mail at HEARINGDOCKET@NRC.GOV, or by calling (301) 415-1677, to request (1) a digital 10 certificate, which allows the participant (or its counselor representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and/or (2) creation of an electronic docket for the proceeding (even in instances in which the petitioner/requestor (or its counselor representative) already holds an NRC-issued digital 10 certificate). Each petitioner/requestor will need to download the Workplace Forms Viewer" to access the Electronic Information Exchange (EIE), a component of the E-Filing system. The Workplace Forms Viewer' is free and is available at http://www.nrc.qov/site-help/e submittals/install-viewer.html. Information about applying for a digitallD certificate is available on NRC's public website at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate, had a docket created, and downloaded the EIE viewer, it can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC public website at http://www.nrc.qov/site-help/e-submittals.html.
A filing is considered complete at the time the filer submits its documents throuqh EIE. To be timely, an electronic filing must be submitted to the EIE system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The EIE system also distributes an e-mail notice that provides access to the document to the !'JRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on
-4 those participants separately. Therefore, applicants and other participants (or their counselor representative) must apply for and receive a digitallD certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system.
A person filing electronically may seek assistance through the "Contact Us" link located on the NRC website at http://www.nrc.gov/site-help/e-submittals.htrnl or by calling the NRC technical help line, which is available between 8:30 a.m. and 4:15 p.m., Eastern Time, Monday through Friday. The help line number is (800) 397-4209 or locally, (301) 415-4737.
Participants who believe that they have a good cause for not submitting documents electronically must file a motion, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants.
Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service.
Documents submitted in adjudicatory proceedings will appear in NRC's electronic hearing docket which is available to the public at http://ehd.nrc.qov/EHD Proceeding/home.asp, unless excluded pursuant to an order of the Commission, an Atomic Safety and Licensing Board, or a Presiding Officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their
-5 filings. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submissions.
The Commission will issue a notice or order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held and designating the Presiding Officer. A notice granting a hearing will be published in the FEDERAL REGISTER and served on the parties to the hearing.
As an alternative to petitions to intervene and requests for hearing, within 30 days from the date of publication of this notice, persons may submit written comments regarding the indirect license transfer application, as provided for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise constitute part of the decisional record. Comments should be submitted to the Secretary, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, and should cite the publication date and page number of this FEDERAL REGISTER notice.
For further details with respect to this indirect license transfer application, see the application dated October 3, 2008, available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agency wide Documents Access and Management System's (ADAMS)
Public Electronic Reading Room on the Internet at the NRC web site, http://www.nrc.qov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or bye-mail to pdr.resource@nrc.gov.
- 6 Attorneys for applicants: Daniel F. Stenger, Hogan & Hartson LLP, 555 Thirteenth Street, NW, Washington, DC 20004, tel: 202.637.5691, email: DFStenger@hhlaw.com (counsel for CENG); and John O'Neill, Pillsbury Winthrop Shaw Pittman LLP, 2300 N Street, NW, Washington, DC 20037, tel. 202.663.8148, email: john.o.neill@pillsburylaw.com (counsel for MEHC).
Dated at Rockville, Maryland this 19Uday of November 2008.
FOR THE NUCLEAR REGULATORY COMMISSION
'0 ......\
'17L~ "-J r~\.-zs..-v \
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
November 19, 2008 Mr. Louis S. Larragoite Manager - Nuclear Safety and Security Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
NOTICE OF CONSIDERATION OF APPROVAL OF 10 CFR 50.80 INDIRECT TRANSFER OF CONTROL OF LICENSE AND OPPORTUNITY FOR A HEARING - R.E. GINNA NUCLEAR POWER PLANT (TAC NO. MD9788)
Dear Mr. Larragoite:
Enclosed is a copy of a "Notice of Consideration of Approval of 10 CFR 50.80 Indirect Transfer of Control of License," related to the application dated October 3, 2008, filed by Constellation Energy Nuclear Group, LLC and MidAmerican Energy Holdings Company (MEHC). The application, pursuant to 10 CFR 50.80, seeks approval of the proposed indirect transfer of R.E.
Ginna Nuclear Power Plant, Facility Operating License DPR-18, as a result of the proposed acquisition of Constellation Energy Group, Inc. by MEHC.
This notice is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/raJ Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Notice cc: Distribution via ListServ Distribution:
PUBLIC RidsNrrDorlLpll-1 RidsNrrLASLitttle LPLI-1 rlf RidsNrrPIVIDPickett RidsOgcMailCenter Resource RidsNrrPMRGuzman ADAMS Accession No. ML083040605 OFFICE LPLI-1/PM LPLI-1/LA OGC LPLI-1/BC NAME DPickett SLittie BMizuno MKowal DATE 11/4/08 11/4/08 11/4/08 11/19/08