Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML03058047731 December 2002WCAP-15887, Revision 2, Probabilistic Risk Analysis of the Slave Relay Surveillance Test Interval Extension for Beaver Valley, Unit 2Anticipated operational occurrence
Probabilistic Risk Assessment
Large early release frequency
ML02364034830 December 2002Request for Additional Information Regarding Amendment Request to Increase New Fuel Storage Rack Enrichment Limit
ML02364038730 December 2002RAI, Risk-Informed Inservice Inspection Program Plans Inservice Inspection Program Relief Request, L-02-066Probabilistic Risk Assessment
VT-2
TAC:MB568730 December 2002
ML03010024626 December 2002National Pollutant Discharge Elimination System Monthly Report, EPA Permit No. PA00025615
ML02358000423 December 2002Memorandum to Richard Laufer, Integrated Leak Rate Test (ILRT) Extension Request
TAC:MB666023 December 2002
ML03023013916 December 2002Final - Section C OperatingBoric Acid
ML03022034216 December 2002Final Qa/Related Forms
ML03022035216 December 2002Draft - NRC Comments
ML03022036616 December 2002Draft - Outlines
ML03022039416 December 2002Draft - RO & SRO Written
ML03022041516 December 2002Draft - Section a OperatingSafe Shutdown
High Radiation Area
Locked High Radiation Area
Job Performance Measure
Recently irradiated fuel
Offsite Circuit
ML03022045916 December 2002Draft - Section B OperatingBoric Acid
Shutdown Margin
Job Performance Measure
ML03022049416 December 2002Draft - Section C OperatingBoric Acid
ML03023000716 December 2002Final - Outlines (Change Summaries - Optional)
ML03023009116 December 2002Final - Section B OperatingJob Performance Measure
ML03023007616 December 2002Final - Section a OperatingLocked High Radiation Area
Job Performance Measure
Offsite Circuit
ML03023004616 December 2002Final - RO & SRO WrittenSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Locked High Radiation Area
Maintenance Rule Program
ML03010007411 December 2002Responses to (Request for Additional Information) RAI Questions on MAAP5 Topical Report
L-02-116, November 2002 Monthly Operating Report for Beaver Valley Units 1 & 26 December 2002November 2002 Monthly Operating Report for Beaver Valley Units 1 & 2Packing leak
IR 05000334/20023012 December 2002IR Beaver Valley Unit 1 Reactor Operator & Senior Reactor Operator Initial Examination Report No. 50-334/02-301
L-02-112, Supplement to License Amendment Request Nos. 295 and 1672 December 2002Supplement to License Amendment Request Nos. 295 and 167Shutdown Margin
High Radiation Area
Hydrostatic
Pressure and Temperature Limits Report
L-02-115, Response to a Request for Additional Information in Support of License Amendment Requests Nos. 300 & 1722 December 2002Response to a Request for Additional Information in Support of License Amendment Requests Nos. 300 & 172
ML02333049229 November 2002Draft Request for Additional Information (Rai), Regarding Amendment Request to Allow Plant Operation with Associated Containment at Atmospheric Pressure
ML02333008129 November 2002Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), Westinghouse Electric Company (W), and Fauske & Associates, Inc. (Fai)
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02347014326 November 2002NPDES Permit PA0025615, Notice of Non-Compliance Outfall 211
ML02347013426 November 2002NPDES Permit PA0025615 Outfall 012
ML02357019526 November 2002October 2002 National Pollutant Discharge Elimination System (NPDES) Monthly Report for Beaver Valley, Units 1 & 2
TAC:MB471622 November 2002
L-02-105, Revised Response to Generic Letter 88-14, Instrument Air Supply System Problems Affecting Safety Related Equipment, Related to Condensate Polishing Instrument Air System22 November 2002Revised Response to Generic Letter 88-14, Instrument Air Supply System Problems Affecting Safety Related Equipment, Related to Condensate Polishing Instrument Air System
ML02325051922 November 2002Westinghouse, RAI, Topical Report on Modular Accident Analysis Program Version 5 (MAAP5) Pressurized Water Reactor (PWR) Large Dry Containment Model, WCAP-15844
ML02325050622 November 2002RAI, Amendment Request to Allow Plant Operation with Associated Containment at Atmospheric Pressure (TAC Nos. MB5303 & MB5304)
TAC:MB530322 November 2002
ML02324044120 November 2002Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response for Beaver Valley Power Station, Unit Nos. 1 and 2Boric Acid
VT-2
Pressure Boundary Leakage
ML02324025519 November 2002Ltr Transmitting Exam Certificates Dtd 11/19/2002
ML02323033019 November 2002Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 15-Day Response
ML03010010318 November 2002FEMA Final Exercise Report for June 18, 2002 Beaver Valley
ML03080003017 November 2002Extract from the Minutes of the Meeting of the Board of Directors of Firsenergy Corp. Held November 17, 2002
L-02-108, Emergency Preparedness Plan and Implementing Procedures (Volumes 1, 2 & 3)16 November 2002Emergency Preparedness Plan and Implementing Procedures (Volumes 1, 2 & 3)Safe Shutdown
Boric Acid
Reactor Vessel Water Level
Earthquake
Pressure Boundary Leakage
ML02316039412 November 2002Relief Request, Evaluation of Inservice TestingBoric Acid
Probabilistic Risk Assessment
TAC:MB555812 November 2002
L-02-111, October 2002 Monthly Operating Report for Beaver Valley Units 1 & 27 November 2002October 2002 Monthly Operating Report for Beaver Valley Units 1 & 2
IR 05000334/20020066 November 2002IR 05000334-02-006, IR 05000412-02-006, on 06/30/03 - 09/30/03, Firstenergy Nuclear Operating Company, Beaver Valley Power Station, Units 1 and 2. Personnel Performance During Non-routine Plant Evolutions and Surveillance TestingSafe Shutdown
Unanalyzed Condition
High Radiation Area
Fire Barrier
Internal Flooding
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Process Control Program
Maintenance Rule Program
ML0232402885 November 2002Reported Oil Spill at Beaver Valley Power Station (NPDES No. PA0025615) on 10/30/2002
L-02-106, License Amendment Request Nos. 299 & 17131 October 2002License Amendment Request Nos. 299 & 171Packing leak
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Annual Radioactive Effluent Release Report
Process Control Program
Large early release frequency
Moisture barrier
Maintenance Rule Program
IR 05000334/200201231 October 2002IR 05000334-02-012, IR 05000412/02-012, on 09/16 - 19/2002; Beaver Valley Power Station, Units 1 and 2; Special Inspection of the August 24, 2002, Identification of a Gas Void in the High Head Safety Injection Charging Pump Suction PipingSignificance Determination Process
ML02304059131 October 2002NRC Exam Notification Ltr Dtd 10/31/2002