Letter Sequence RAI |
---|
|
|
MONTHYEARML0236403872002-12-30030 December 2002 RAI, Risk-Informed Inservice Inspection Program Plans Inservice Inspection Program Relief Request, L-02-066 Project stage: RAI ML0303700792003-02-0606 February 2003 Second RAI, Risk-Informed Inservice Inspection Program Plans Inservice Inspection Program Relief Request L-02-066, (TAC Nos. MB5687 & MB5688) Project stage: RAI ML0323206002003-08-21021 August 2003 Summary of July 10, 2003, Conference Call Beaver Valley, Units 1 & 2 - Risk-Informed Inservice Inspection Relief Request Project stage: Other L-03-174, (Bvps), Unit 1 & 2, Risk-Information Inservice Inspection Program Relief Request2003-10-28028 October 2003 (Bvps), Unit 1 & 2, Risk-Information Inservice Inspection Program Relief Request Project stage: Request L-03-205, Risk-Informed Inservice Inspection Program Relief Request2003-12-19019 December 2003 Risk-Informed Inservice Inspection Program Relief Request Project stage: Request L-04-025, Submittal of Additional Information Regarding Risk-Informed ISI Program2004-02-20020 February 2004 Submittal of Additional Information Regarding Risk-Informed ISI Program Project stage: Other ML0407808052004-04-0909 April 2004 Letter, Risk-Informed Inservice Inspection Program. TAC Nos MB5687 and MB5688 Project stage: Other 2003-02-06
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22278A0972022-10-0606 October 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Fire Protection Program Changes ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML22013A7512022-01-13013 January 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000334/2022010 and 05000412/2022010 ML21292A0482021-10-19019 October 2021 Ti 2515/194 Inspection Documentation Request ML21259A1642021-09-16016 September 2021 NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection ML21102A1542021-04-0909 April 2021 Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR ML21082A4942021-03-23023 March 2021 Final RAIs for GL 04-02 Closure (Email) ML21068A3502021-03-0909 March 2021 Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21015A5762021-01-14014 January 2021 Final RAIs for Steam Generator 180 Day Tube Inspection Report ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20290B0082020-10-0808 October 2020 Draft Request for Additional Information - Steam Generator Letter ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20072N0402020-03-12012 March 2020 Request for Additional Information - Control Envelope Habitability LAR ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18242A3642018-08-29029 August 2018 Request for Additional Information (Final) -Steam Generator Technical Specification LAR ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML18024B3642018-01-24024 January 2018 NRR E-mail Capture - Beaver Valley 10 CFR 50.54(f) - NTTF 2.1 SPRA Review ML18019A0722018-01-18018 January 2018 NRR E-mail Capture - Beaver Valley Unit No. 1: Request for Additional Information - Modified Rtpts Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17353A1582017-12-19019 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17352B2612017-12-18018 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17256A2502017-09-13013 September 2017 NRR E-mail Capture - Beaver Valley Power Station Units 1&2: Request for Additional Information for Emergency Plan EAL Change to Adopt NEI 99-01, Rev. 6, ML17220A2342017-08-0808 August 2017 E-mail Regarding Request for Additional Information for NFPA 805 License Amendment Request ML17093A7622017-04-10010 April 2017 Request for Additional Information Regarding Emergency Action Level Scheme Change License Amendment Request ML17031A0362017-02-0303 February 2017 Request for Additional Information Regarding Relief Request Numbers PR6 and PR7 ML16333A0162016-12-0202 December 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16147A2842016-06-14014 June 2016 Request for Additional Infomation Regarding Fall 2015 Refueling Steam Generator Tube Inspections ML16071A1222016-04-0707 April 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16084A8442016-03-30030 March 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16060A0122016-02-29029 February 2016 FENOC - Email RAI to Licensee Regarding LAR for Changes to TS 5.3.1 CAC Nos. MF7118, MF7119, and MF7120 ML15320A4132015-11-24024 November 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15280A0742015-10-0909 October 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15279A1252015-10-0505 October 2015 Licensed Operator Positive for Fitness-for-Duty-Test ML15181A2142015-07-14014 July 2015 Request for Additional Information Regarding License Amendment Request to Revise Steam Generator Technical Specifications to Reflect TSTF-510 and to Revise Alloy 800 Sleeve Technical Specifications (TAC Nos. MF6054 & MF6055) ML15125A4162015-05-11011 May 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 (TAC Nos. MF3301 & MF3302) ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information ML15007A5582015-01-15015 January 2015 Request for Additional Information Steam Generator Inspection Reports ML14218A7622014-12-11011 December 2014 RAI Request to Implement 10 CFR 50.61a Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events ML14316A3902014-11-14014 November 2014 Request for Additional Information Review of Licensee Security Plans 2023-05-05
[Table view] |
Text
December 30, 2002 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 and 2)
REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING RISK-INFORMED INSERVICE INSPECTION PROGRAM PLANS INSERVICE INSPECTION (ISI) PROGRAM RELIEF REQUEST, L-02-066 (TAC NOS.
MB5687 AND MB5688)
Dear Mr. Bezilla:
By letter dated July 24, 2002, FirstEnergy Nuclear Operating Company (FENOC) submitted a relief request to allow implementation of a Risk-Informed ISI Program as an alternative to the current American Society of Mechanical EngineersSection XI ISI requirements for piping at the Beaver Valley Power Station, Unit Nos. 1 and 2.
The Nuclear Regulatory Commission (NRC) staff has conducted an initial review of your submittal and has determined that additional information is required in order for the NRC staff to complete its review. Enclosed is the NRC staffs RAI associated with your application. The questions in the enclosed RAI were discussed with the BVPS-1 and 2 staff in a conference call on November 26, 2002. Subsequent to that call, the tentative schedule for your response was discussed with Mr. B. Sepelak of your staff, and 45 days from the date of your receiving this RAI was agreed to as a target date for submittal of FENOCs response. Please contact me as soon as possible if circumstances arise that require changes to this proposed schedule. If you have any questions, please contact me at 301-415-1427.
Sincerely,
/RA/
Daniel S. Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
RAI cc w/encl: See next page
Mr. Mark B. Bezilla December 30, 2002 Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 and 2)
REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING RISK-INFORMED INSERVICE INSPECTION PROGRAM PLANS INSERVICE INSPECTION (ISI) PROGRAM RELIEF REQUEST, L-02-066 (TAC NOS.
MB5687 AND MB5688)
Dear Mr. Bezilla:
By letter dated July 24, 2002, FirstEnergy Nuclear Operating Company (FENOC) submitted a relief request to allow implementation of a Risk-Informed ISI Program as an alternative to the current American Society of Mechanical EngineersSection XI ISI requirements for piping at the Beaver Valley Power Station, Unit Nos. 1 and 2.
The Nuclear Regulatory Commission (NRC) staff has conducted an initial review of your submittal and has determined that additional information is required in order for the NRC staff to complete its review. Enclosed is the NRC staffs RAI associated with your application. The questions in the enclosed RAI were discussed with the BVPS-1 and 2 staff in a conference call on November 26, 2002. Subsequent to that call, the tentative schedule for your response was discussed with Mr. B. Sepelak of your staff, and 45 days from the date of your receiving this RAI was agreed to as a target date for submittal of FENOCs response. Please contact me as soon as possible if circumstances arise that require changes to this proposed schedule. If you have any questions, please contact me at 301-415-1427.
Sincerely,
/RA/
Daniel S. Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION:
PUBLIC MOBrien ACRS BPLatchek, RGN-1 AKeim MRubin PDI-1 Reading DCollins OGC SDinsmore RLaufer TChan ACCESSION NO. ML023640387 NRR-088 OFFICE PDI-1/LA PDI-1/PM EMCB SPSB PDI-1/SC NAME MOBrien DCollins TChan DGH forMRubin PTam for RLaufer DATE 12/10/02 12/10/02 12/23/02 12/26/02 12/27/02 OFFICIAL RECORD COPY
Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney Rich Janati, Chief FirstEnergy Nuclear Operating Company Division of Nuclear Safety FirstEnergy Corporation Bureau of Radiation Protection 76 South Main Street Deparment of Environmental Protection Akron, OH 44308 Rachel Carson State Office Building P.O. Box 8469 FirstEnergy Nuclear Operating Company Harrisburg, PA 17105-8469 Regulatory Affairs/Corrective Action Section Larry R. Freeland, Manager Mayor of the Borough of Beaver Valley Power Station Shippingport Post Office Box 4, BV-A P O Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner James R. Lewis Regional Administrator, Region I West Virginia Division of Labor U.S. Nuclear Regulatory Commission 749-B, Building No. 6 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident Inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 FirstEnergy Nuclear Operating Company Director, Pennsylvania Emergency Beaver Valley Power Station Management Agency ATTN: M. P. Pearson, Director 2605 Interstate Dr. Services and Projects (BV-IPAB)
Harrisburg, PA 17110-9364 Post Office Box 4 Shippingport, PA 15077 Ohio EPA-DERR ATTN: Zack A. Clayton FirstEnergy Nuclear Operating Company Post Office Box 1049 Beaver Valley Power Station Columbus, OH 43266-0149 Mr. B. F. Sepelak Post Office Box 4, BV-A Dr. Judith Johnsrud Shippingport, PA 15077 National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 L. W. Pearce, Plant Manager (BV-IPAB)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
REQUEST FOR ADDITIONAL INFORMATION (RAI)
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-334 AND 50-412 The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing FirstEnergy Nuclear Operating Companys July 24, 2002, Inservice Inspection (ISI) Program Relief Request (L 066) for the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2), which would implement a risk-informed ISI program.
The NRC staff has identified the following questions or concerns that require clarification or additional information in order to complete its review:
A. UNITS 1 AND 2
- 1. Section 3.8 of the licensees submittal addresses additional examinations. It states, The evaluation will include whether other elements on the segment or segments are subject to the same root cause and degradation mechanism. Additional examinations will be performed on these elements up to a number equivalent to the number of elements initially required to be inspected on the segment or segments. If unacceptable flaws or relevant conditions are again found similar to the initial problem, the remaining elements identified as susceptible will be examined. No additional examinations will be performed if there are no additional elements identified as being susceptible to the same service related root cause conditions or degradation mechanism.
ASME Code directs licensees to perform these sample expansions in the current outage. Confirm that the sample expansions of elements identified as being susceptible to the same service related root cause conditions or degradation mechanism will be completed during the outage that identified the flaws or relevant conditions.
- 2. Will the risk-informed ISI program be updated every 10 years and submitted to the NRC consistent with the current requirements of Section XI of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code?
- 3. Under what condition will the risk-informed ISI program be resubmitted to the NRC before the end of any 10-year interval?
- 4. You state that the BVPS-1 relief request used the 6/98 version of the probabilistic risk assessment (PRA) and the BVPS-2 relief request used the 10/97 version of the PRA.
You describe an administrative procedure that requires a staggered 3-year update cycle and a continuous evaluation of potential changes that may require more frequent updates. Even given the time to perform the risk-informed ISI analysis, the staggered 3-year update appears inconsistent with the age of the PRAs used. You also state that the current BVPS-1 and 2 models reflect the actual design, construction, and Enclosure
operational practices, and that an evaluation based on the Electric Power Research Institute probabilistic safety assessment Applications Guide was performed to confirm that the PRA conforms to the industry state of the art with respect to completeness of coverage of potential scenarios. Clarify which parts of the discussion contained in the June 2002 relief request refer to the procedures and reviews that were applied to the 6/98 and 10/97 version of the PRAs and which are applied to the current version.
Confirm that all of the PRA quality discussion are applicable to the PRAs used to develop the risk-informed ISI relief request. Otherwise describe the procedures and reviews applied to ensure that the 6/98 and the 10/97 PRAs used to support the relief requests adequately reflected the actual design, construction, and operational practices at the time that the relief request evaluation was initiated or during its development.
- 5. State when, and which version, of your PSA has been peer reviewed by the Westinghouse Owners Group peer review process.
- 6. Your submittal describes an improved methodology for a weakness identified by the staff in your Individual Plant Examination and concluded that, [s]ystem unavailability resulting from human errors is therefore accounted for in the current models. Was this improved methodology implemented in the 6/98 and 10/97 versions of the PRAs? If the methodology was not implemented in the 6/98 and 10/97 versions or otherwise incorporated into the evaluation used to support the relief request, incorporate the improved methods into the results or provide an explanation as to why no impact on the results is expected
- 7. Are there any piping segments that include piping of different diameters? If so, how were the failure frequencies estimated for these segments? For segments including piping of different diameters and where the Perdue method could be applied, how were the number of locations to be inspected determined? How does the methodology for determining the failure frequency comport with the methodology described on page 71 of the Westinghouse Owners Group WCAP-14572, Revision 1-NP-A, "Westinghouse Owners Group Application of Risk-Informed Methods to Piping Inservice Inspection Topical Report," (WCAP-14572), dated February 1999? How does the methodology for determining the number of inspections comport with the methodology described on pages 170, 171, and 174 of the WCAP?
- 8. Aside from three segments discussed in Unit 1's submittal, you state that all segments in Regions 1 and 2, as discussed on page 167 of WCAP-14572, were evaluated using the Perdue model. The Perdue model is not applied to locations in Region 1A where 100 percent of the locations should be inspected. Explain this apparent discrepancy.
- 9. Attachment 3 to the submittal is the table, Comparison of BVPS-1 and BVPS-2 Postulated Consequences by System. In some cases differences appear to be physical differences such as the first entry in the Steam Generator Blowdown System differences (page 1) stating, Unit 2 has a 2" line connected to the S/G steam space, which was modeled as a steam line break. In other cases, the differences appear to be PRA modeling differences. For example, the first entry in the Steam Generator
Feedwater System differences (page 4) states, Main Feedwater Line Break is not modeled in the current Unit 1 PRA model. It was treated as part of the Total Loss of Main Feedwater events. In the second example, the total loss of main feedwater event(s) may not fully reflect all the spatial effects associated with the break of the main feedwater piping evaluated in the risk-informed ISI. Confirm that, a) The physical differences between the units are appropriately reflected in the PRA models used to develop the risk-informed ISI evaluation for each unit, b) The PRA model differences that reflect the use of less detailed models or less developed modeling techniques for one of the units have been evaluated and found to have a negligible impact on the risk-informed ISI results or were incorporated into the risk-informed ISI evaluation as appropriate.
B. UNIT 1
- 10. How many weld locations or other potential inspection locations are there in segments QS-001, and QS-002, respectively? To which system do these segments belong and what degradation mechanism are present in these segments? What is the rationale for selecting one location in each segment?
- 11. Will the one potential inspection location in QS-042 be inspected as part of the risk-informed ISI program? Explain why or why not.
- 12. On page 18 you state that all 9 segments in Region 1 were exposed, or are susceptible, to a failure mechanism. Yet on page 25, at least one segment in the Main Steam System is only in Region 1B. Explain why there are no locations placed in Region 1A (e.g., susceptible locations)?
- 13. On page 24, at least one segment in the Chemical and Volume Control System is only in Region 1A. Are 100% of the elements in this segment inspected (e.g., the VT-2 segments in footnote e)?
- 14. In general, segments in Region 1 require at least two inspection locations, one in Region 1A and one in Region 1B. Since 100% of susceptible locations (Region 1A) require inspections, more than two locations is normally expected. Segments in Region 2 require at least one inspection location. Based on information in Section 3.8 of your submittal, this would indicate a minimum total number of inspections of 2X9 (Region 1) plus 109 (Region 2) or 127 locations. Table 5-1 indicates a total of 124 inspection locations. Explain this apparent discrepancy.
C. UNIT 2
- 15. On page 17 you state that all 10 segments in Region 1 were exposed, or are susceptible, to a failure mechanism. Yet on page 24, at least one segment in the Main Steam System is only in Region 1B. Explain why there are no locations placed in Region 1A (e.g., susceptible locations).
- 16. In general, segments in Region 1 require at least two inspection locations, one in Region 1A and one in Region 1B. Since 100% of susceptible locations (Region 1A) require inspections, more than two locations is normally expected. Segments in Region 2 require at least one inspection location. Based on information in Section 3.8 of your submittal, this would indicate a minimum total number of inspections of 2X10 (Region 1) plus 97 (Region 2) or 117 locations. Table 5-1 indicates a total of 115 inspection locations. Explain this apparent discrepancy.