November 19, 2002 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 - BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, 15-DAY RESPONSE (TAC NOS. MB4526 AND MB4527)

Dear Mr. Bezilla:

On March 18, 2002, the staff issued Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry requesting that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements. Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized water reactor (PWR) plants. All addressees were requested to respond to Items 1.A. through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Section 50.54(f), of the Code of Federal Regulations (10 CFR 50.54(f)) if they are unable to provide the information or they can not meet the requested completion dates.

You provided your 15-day Bulletin response by letter dated April 1, 2002. By letter dated April 19, 2002, you provided a supplemental response for Beaver Valley, Unit No. 1. By letter dated May 10, 2002, you provided a response to an NRC staff request for additional information which had been provided to you on April 23, 2002. The staff finds that you have provided the requested information, and has concluded that your plants do not appear to have conditions similar to those which lead to the degradation at Davis-Besse.

M. Bezilla We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.

Sincerely,

/RA/

Daniel Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page

M. Bezilla We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.

Sincerely,

/RA/

Daniel Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page DISTRIBUTION:

PUBLIC RLaufer OGC WBateman PDI-1 R/F DCollins ACRS ALee EMCB R/F SBloom JRogge, Rgn-I SCoffin TSulliva ACCESSION NO. ML023230330 OFFICE PDI-1/PM PD1-2/LA EMCB PDI-1/SC NAME DCollins MOBrien SBloom RLaufer DATE 11/14/02 11/8/02 11/14/02 11/18/02 OFFICIAL RECORD COPY

Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney Rich Janati, Chief FirstEnergy Nuclear Operating Company Division of Nuclear Safety FirstEnergy Corporation Bureau of Radiation Protection 76 South Main Street Deparment of Environmental Protection Akron, OH 44308 Rachel Carson State Office Building P.O. Box 8469 FirstEnergy Nuclear Operating Company Harrisburg, PA 17105-8469 Regulatory Affairs/Performance Improvement Mayor of the Borough of Larry R. Freeland, Manager Shippingport Beaver Valley Power Station P O Box 3 Post Office Box 4, BV-A Shippingport, PA 15077 Shippingport, PA 15077 Regional Administrator, Region I Commissioner James R. Lewis U.S. Nuclear Regulatory Commission West Virginia Division of Labor 475 Allendale Road 749-B, Building No. 6 King of Prussia, PA 19406 Capitol Complex Charleston, WV 25305 Resident Inspector U.S. Nuclear Regulatory Commission Director, Utilities Department Post Office Box 298 Public Utilities Commission Shippingport, PA 15077 180 East Broad Street Columbus, OH 43266-0573 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Director, Pennsylvania Emergency ATTN: M. P. Pearson, Director Management Agency Services and Projects (BV-IPAB) 2605 Interstate Dr. Post Office Box 4 Harrisburg, PA 17110-9364 Shippingport, PA 15077 Ohio EPA-DERR FirstEnergy Nuclear Operating Company ATTN: Zack A. Clayton Beaver Valley Power Station Post Office Box 1049 Mr. B. F. Sepelak Columbus, OH 43266-0149 Post Office Box 4, BV-A Shippingport, PA 15077 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077