Letter Sequence RAI |
---|
|
|
MONTHYEARML0226606082002-09-23023 September 2002 Draft Request for Additional Information (Rai), Regarding Amendment Request to Increase Enrichment Limits for New Fuel Storage Racks Project stage: Draft RAI ML0226701402002-09-24024 September 2002 RAI, Draft RAI Regarding Amendment Request to Increase Enrichment Limits for New Fuel Storage Racks Project stage: Draft RAI ML0227700072002-10-0404 October 2002 Draft Response to Request for Additional Information, Amendment Request to Increase Enrichment Limits for New Fuel Storage Racks Project stage: Draft RAI ML0236403482002-12-30030 December 2002 Request for Additional Information Regarding Amendment Request to Increase New Fuel Storage Rack Enrichment Limit Project stage: RAI ML0313504512003-05-15015 May 2003 Technical Specification Page Amendment 135 to Beaver Valley Unit 2 Project stage: Other ML0313500282003-05-15015 May 2003 Issuance of Amendment No. 135 New Fuel Storage Rack Fuel Enrichment Limits Project stage: Approval 2002-09-23
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22278A0972022-10-0606 October 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Fire Protection Program Changes ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML22013A7512022-01-13013 January 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000334/2022010 and 05000412/2022010 ML21292A0482021-10-19019 October 2021 Ti 2515/194 Inspection Documentation Request ML21259A1642021-09-16016 September 2021 NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits ML21124A1322021-05-0404 May 2021 Notification of Conduct of a Fire Protection Team Inspection ML21102A1542021-04-0909 April 2021 Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR ML21082A4942021-03-23023 March 2021 Final RAIs for GL 04-02 Closure (Email) ML21068A3502021-03-0909 March 2021 Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21015A5762021-01-14014 January 2021 Final RAIs for Steam Generator 180 Day Tube Inspection Report ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20290B0082020-10-0808 October 2020 Draft Request for Additional Information - Steam Generator Letter ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20072N0402020-03-12012 March 2020 Request for Additional Information - Control Envelope Habitability LAR ML19192A2222019-07-18018 July 2019 Request for Additional Information Regarding Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML19143A0732019-05-29029 May 2019 FENOC Fleet - Beaver Valley, Units 1 and 2; Davis-Besse, Unit 1, Perry, Unit 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action; Application for Order Consenting to License Transfer and Conforming Amendments ML18242A3642018-08-29029 August 2018 Request for Additional Information (Final) -Steam Generator Technical Specification LAR ML18102B0852018-04-12012 April 2018 NRR E-mail Capture - Follow-up Request for Additional Information (RAI) FENOC FLEET-- Exemption Request for a Physical Barrier Requirement for Beaver ML18043A0102018-02-0909 February 2018 NRR E-mail Capture - FENOC--MG0010-MG0011, MG-0012, MG0013-- Request for Additional Information (RAI) - Exemption Request Security Barrier in Physical Plans ML18024B3642018-01-24024 January 2018 NRR E-mail Capture - Beaver Valley 10 CFR 50.54(f) - NTTF 2.1 SPRA Review ML18019A0722018-01-18018 January 2018 NRR E-mail Capture - Beaver Valley Unit No. 1: Request for Additional Information - Modified Rtpts Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule ML17353A1582017-12-19019 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17352B2612017-12-18018 December 2017 NRR E-mail Capture - Request for Additional Information: Beaver Valley Unit No. 1 - Proposed Alternative Request, 1-TYP-4-BA-01 ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information ML17256A2502017-09-13013 September 2017 NRR E-mail Capture - Beaver Valley Power Station Units 1&2: Request for Additional Information for Emergency Plan EAL Change to Adopt NEI 99-01, Rev. 6, ML17220A2342017-08-0808 August 2017 E-mail Regarding Request for Additional Information for NFPA 805 License Amendment Request ML17093A7622017-04-10010 April 2017 Request for Additional Information Regarding Emergency Action Level Scheme Change License Amendment Request ML17031A0362017-02-0303 February 2017 Request for Additional Information Regarding Relief Request Numbers PR6 and PR7 ML16333A0162016-12-0202 December 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16147A2842016-06-14014 June 2016 Request for Additional Infomation Regarding Fall 2015 Refueling Steam Generator Tube Inspections ML16071A1222016-04-0707 April 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16084A8442016-03-30030 March 2016 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML16060A0122016-02-29029 February 2016 FENOC - Email RAI to Licensee Regarding LAR for Changes to TS 5.3.1 CAC Nos. MF7118, MF7119, and MF7120 ML15320A4132015-11-24024 November 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15280A0742015-10-0909 October 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15279A1252015-10-0505 October 2015 Licensed Operator Positive for Fitness-for-Duty-Test ML15181A2142015-07-14014 July 2015 Request for Additional Information Regarding License Amendment Request to Revise Steam Generator Technical Specifications to Reflect TSTF-510 and to Revise Alloy 800 Sleeve Technical Specifications (TAC Nos. MF6054 & MF6055) ML15125A4162015-05-11011 May 2015 Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 (TAC Nos. MF3301 & MF3302) ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information ML15007A5582015-01-15015 January 2015 Request for Additional Information Steam Generator Inspection Reports ML14218A7622014-12-11011 December 2014 RAI Request to Implement 10 CFR 50.61a Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events ML14316A3902014-11-14014 November 2014 Request for Additional Information Review of Licensee Security Plans 2023-05-05
[Table view] |
Text
December 30, 2002 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NO 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT REQUEST TO INCREASE NEW FUEL STORAGE RACK ENRICHMENT LIMIT (TAC NO. MB5301)
Dear Mr. Bezilla:
By letter dated May 31, 2002, FirstEnergy Nuclear Operating Company (FENOC) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to amend the Technical Specifications (TSs) for Beaver Valley Power Station, Unit No. 2 (BVPS2), to increase the new fuel storage rack enrichment limit to 5.00 weight percent (w/o) U-235.
The NRC staff is reviewing information provided in the application and in a September 11, 2002, supplement to the application. We have determined that additional information is needed in order for the NRC staff to complete its evaluation. This RAI was discussed with Mr. Ron Fedin of your staff on December 16, 2002. FENOC staff indicated that a response would be provided to the enclosed request for additional information (RAI) by January 15, 2003. If circumstances result in a need to revise that schedule, please call me at the earliest possible opportunity.
If you should have any questions, please do not hesitate to call me at (301) 415-1427.
Sincerely,
/RA/
Daniel Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-412
Enclosure:
RAI cc w/encl: See next page
December 30, 2002 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NO 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT REQUEST TO INCREASE NEW FUEL STORAGE RACK ENRICHMENT LIMIT (TAC NO. MB5301)
Dear Mr. Bezilla:
By letter dated May 31, 2002, FirstEnergy Nuclear Operating Company (FENOC) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to amend the Technical Specifications (TSs) for Beaver Valley Power Station, Unit No. 2 (BVPS2), to increase the new fuel storage rack enrichment limit to 5.00 weight percent (w/o) U-235.
The NRC staff is reviewing information provided in the application and in a September 11, 2002, supplement to the application. We have determined that additional information is needed in order for the NRC staff to complete its evaluation. This RAI was discussed with Mr. Ron Fedin of your staff on December 16, 2002. FENOC staff indicated that a response would be provided to the enclosed request for additional information (RAI) by January 15, 2003. If circumstances result in a need to revise that schedule, please call me at the earliest possible opportunity.
If you should have any questions, please do not hesitate to call me at (301) 415-1427.
Sincerely,
/RA/
Daniel Collins, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-412
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION:
PUBLIC MOBrien ACRS SRichards PDI-1 Reading DCollins OGC BPlatchek, RGN-I SColpo RLaufer FAkstulewicz DOCUMENT NAME: C:\ORPCheckout\FileNET\ML023640348.wpd ACCESSION NO. ML023640348 *see previous concurrence OFFICE PDI-1/PM PDI-1/LA SRXB/SC PDI-1/SC NAME DCollins MOBrien FAkstulewicz* RLaufer DATE 12/27/02 12/27/02 12/23/02 12/30/02 OFFICIAL RECORD COPY
Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney Rich Janati, Chief FirstEnergy Nuclear Operating Company Division of Nuclear Safety FirstEnergy Corporation Bureau of Radiation Protection 76 South Main Street Deparment of Environmental Protection Akron, OH 44308 Rachel Carson State Office Building P.O. Box 8469 FirstEnergy Nuclear Operating Company Harrisburg, PA 17105-8469 Regulatory Affairs/Corrective Action Section Larry R. Freeland, Manager Mayor of the Borough of Beaver Valley Power Station Shippingport Post Office Box 4, BV-A P O Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner James R. Lewis Regional Administrator, Region I West Virginia Division of Labor U.S. Nuclear Regulatory Commission 749-B, Building No. 6 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident Inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 FirstEnergy Nuclear Operating Company Director, Pennsylvania Emergency Beaver Valley Power Station Management Agency ATTN: M. P. Pearson, Director 2605 Interstate Dr. Services and Projects (BV-IPAB)
Harrisburg, PA 17110-9364 Post Office Box 4 Shippingport, PA 15077 Ohio EPA-DERR ATTN: Zack A. Clayton FirstEnergy Nuclear Operating Company Post Office Box 1049 Beaver Valley Power Station Columbus, OH 43266-0149 Mr. B. F. Sepelak Post Office Box 4, BV-A Dr. Judith Johnsrud Shippingport, PA 15077 National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 L. W. Pearce, Plant Manager (BV-IPAB)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT REQUEST TO INCREASE NEW FUEL STORAGE RACK ENRICHMENT LIMIT BEAVER VALLEY POWER STATION, UNIT NO. 2 DOCKET NO. 50-412 The U.S. Nuclear Regulatory Commission (NRC) staff, is reviewing FirstEnergy Nuclear Operating Companys (FENOC) May 31, 2002, application (L-02-070) and the associated supplement dated September 11, 2002 (L-02-093) for an amendment to Facility Operating License No. NPF-73 for the Beaver Valley Power Station, Unit No. 2 (BVPS2), which would allow new fuel with an enrichment of 5.00 weight percent (w/o) U-235 to be placed into and stored in the BVPS-2 new fuel storage racks.
The NRC staff has determined that additional clarification of FENOCs response to the staffs second question addressed in the September 11, 2002, supplement is needed in order to complete the NRC review of the amendment request. The following is a revision of the staffs previous question #2.
- 1. NUREG/CR-6698 is a guide for validation of nuclear criticality safety calculational methodologies. Table 2.3 of this NUREG contains physical parameters for areas of applicability, including enrichment. A range of appropriate evaluated benchmark experiments is listed given the enrichment to be modeled. There is no question that the benchmark experiments used for the validation are appropriate if they fall within the range listed in the table. However if the experiments to be credited do not fall within the specified ranges, justification must be provided as to why the experiments used are appropriate.
Page 3, Section 4, of the enclosure to the May 31, 2002, application stated that the methods used in the criticality analysis conform with ANSI/ANS 8.1. From our review, we cannot confirm how you satisfy the requirements of this ANSI standard. Please describe how your methods demonstrate compliance with ANSI/ANS 8.1, paragraph 4.3.1, Establishment of Bias, and 4.3.2, Bias Trends, as they relate to areas of applicability, specifically isotopic composition requirements for critical benchmark experiments. This is of particular importance because it is used to establish the validity of your calculated keff.
Explain why the low-enriched experiments detailed in WCAP-14416 (i.e., 2.35 w/o and 2.46 w/o) which supplement the 4.31% enriched experiments are applicable for your validation even though they fall beyond the experimental range suggested by NUREG/CR-6698, Table 2.3.
Enclosure